J2 - Specifications - Items A B C.doc
DOC document 11 MB Posted
- Solicitation number
- AG-4419-S-10-0330
About this file
Specifications for Items A B and C
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.doc | DOC document | |
| Amendment 2.rtf | RTF text file | |
| Amendment 1.rtf | RTF text file | |
| J7 - Wage Determinations.docx | DOCX document | |
| AG-4419-S-10-0330.rtf | RTF text file | |
| SF-1442 Contractor Complete and Return.rtf | RTF text file | |
| sf24 bid bond form.pdf | ||
| J3 - Detail Drawing.pdf | ||
| J1 - Map - Items A B C.pdf | ||
| J4 - Map - Items D E F.pdf | ||
| J5 - Specifications - Items D E F.doc | DOC document | |
| J6 - Bearskin Cabin Insp Rpt.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIM-0900-2F-158-0909-01
AG-4419-S-10-0330
J1 - HISTORIC CCC FACILITIES
PRESERVE CIVILIAN CONSERVATION CORPS (CCC) STRUCTURES FOR RE-USE
PROJECT SPECIFICATIONS
Attachment
Title
Pages A Preservation of South Kawishiwi Campground Pavilion
2-53 B Preservation of Fenske Campground Pavilion
55-93 C Preservation of Isabella workstation warehouses
95-123 Attachment J1 to Solicitation
SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT
Preservation of South Kawishiwi Campground Pavilion
Table of Contents Division Section Title
DIVISION 1 - GENERAL REQUIREMENTS
01100
SUMMARY
01140
WORK RESTRICTIONS
01270
UNIT PRICES
01310
PROJECT MANAGEMENT AND COORDINATION
6-7 01400
QUALITY CONTROL
7-8 01420
REFERENCES
9-12 01500
TEMPORARY FACILITIES AND CONTROLS
01700
EXECUTION REQUIREMENTS
13-14 01770
CLOSEOUT PROCEDURES
14-16
DIVISION 2 – EXISTING CONDITIONS
02419
SELECTIVE DEMOLITION
17-18
DIVISION 4 – MASONRY
04902 STONE MASONRY CLEANING
19-23 DIVISION 6 – WOODS and PLASTICS 06100
ROUGH CARPENTRY
24-26 06440
LOG INSTALLATION / REPLACEMENT
29-31 Preservation of South Kawishiwi Campground Pavilion
Table of Contents (cont.)
DIVISION 7 – MOISTURE PROTECTION
07205
PRESERVATIVES
DIVISION 8 – OPENINGS
08550
WOOD WINDOWS
33-34
DIVISION 9 – FINISHES
09640
REFINISH WOOD FLOOR
35-38 09931
EXTERIOR FINISHES
39-40 09932
INTERIOR FINISHES
41-45
PHOTOS
46-53
SECTION 01100 - SUMMARY
PART 1 - GENERAL
1.1 PROJECT IDENTIFICATION
A.
Project Name and Location: The South Kawishiwi Campground Pavilion is accessible by car and is located adjacent to the river for which it’s named. The campground is 12 miles South of Ely, MN. Along State Hwy. #1. The pavilion is saddle notched log building approximately 3’X 60’ (Reference the location map) B.
Project Summary Description: This project consists of preservative, stabilization and repair work on an existing historic log building located on the Superior National Forest. All work must conform to the Secretary of The Interior’s Standards for the Treatment of Historic Properties (36 CFR Part 68) and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings.
All the Briefs can be found at: http://www.nps.gov/history/hps/tps/briefs/presbhom.htm
The Tech Notes are at: http://www.nps.gov/history/hps/tps/technotes/tnhome.htm
Work includes but is not limited to: log repair and or replacement, wood screen window fabrication and or rescreening, refinishing the wood floor, removing and reapplying a clear interior finish to the walls and ceiling, exterior staining, and moisture protection.
C.
Government or Owner refers to the USDA Forest Service. Contracting Officer (CO) refers to the person assigned by the USDA Forest Service to administer the Contract. The Contracting Officer will designate a Contracting Officers Technical Representative (COTR).
1.2 REQUIREMENTS OF THE OFFERER’S PROPOSAL
A.
This project is advertised as a REQUEST FOR PROPOSAL solicitation.
B.
The Government CONDITION ASSESSMENTS, RECOMMENDATIONS, WORK DESCRIPTION and SPECIFICATIONS are the basis for this Contract.
1.3
CONTRACTOR USE OF SITE AND PREMISES
A.
Contractor may use on-site power and toilet facilities.
PART 2 - PRODUCTS & PART 3 – EXECUTION (Not Applicable)
END OF SECTION 01100
SECTION 01140 - WORK RESTRICTIONS
PART 1 - GENERAL
1.1
RELATED DOCUMENTS
A.
General provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.2
CONTRACTOR USE OF
A.
The Government will conduct a pre-construction survey with the Contractor to review and document the existing project conditions prior to construction..
B.
The Contractor shall perform all work during the use season of May 5 through Labor Day Monday through Friday between the hours of 7:00 AM and 8:00 PM. After Labor Day and prior to May 5, the Contractor will have full use of the site.
C.
The Contractor shall limit use of the premises to the work in areas indicated.
1.
Confine operations at the site to areas indicated. Do not disturb portions of the site beyond the areas in which Work is indicated.
2.
Schedule deliveries to minimize on-site storage of material and equipment.
3.
Repair damage caused by construction operations. Take precautions to protect the public during the construction period.
4.
Space on the premises is available for the Contractor's storage and related activities.
5.
Existing materials and equipment that are removed as part of the construction operations, and that are not reused or salvaged as Government property, shall become the property of the Contractor and shall be promptly removed from the site.
1.3
GOVERNMENT OCCUPANCY
A.
The Government will not occupy the site during the construction. Perform the Work in a manner that does not interfere with the Government's operations.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01140
SECTION 01270 - UNIT PRICES
PART 1 - GENERAL
1.1 SUMMARY
A. A unit price provides an amount proposed by the Contractor and stated on the Schedule of Items as a price per unit of measurement for materials or services.
B.
Unit prices include all necessary material and labor costs, overhead, profit, taxes, shipping and other related expenses for the added or deducted work.
1.2 PROCEDURES
A. Measurement: Method of measurement for each unit price is specified in the specification and or the Schedule of items section applicable to the work.
B.
Verification: The Government reserves the right to reject the Contractor's measurement of work in place that involves use of an established unit price, and to have this work measured, at the Government's expense, by an independent surveyor acceptable to the Contractor.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01270
SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1
SUMMARY
A.
This section includes certain administrative provisions for managing and coordinating construction operations.
1.2
GENERAL PROJECT COORDINATION
A.
Coordination of Trades: Coordinate construction operations to provide an efficient and orderly installation of each part of the Work.
1.3
CONSERVATION
A.
Consider conservation of energy, water and materials during construction operations.
1.4
SPILL AND EROSION CONTROL
A.
Spill and Erosion Control Plans: Develop plans to minimize erosion. Develop plans to provide for containment of hazardous materials and unplanned spills.
1.5
ADMINISTRATIVE AND SUPERVISORY PERSONNEL
In addition to meeting the requirements of FAR 52.236-6 for an on-site Project Superintendent, the Contractor shall provide other administrative and supervisory personnel as required for performance of the Work.
1.6
CONFERENCES AND MEETINGS
Pre-construction Conference: The Contracting Officer will schedule a pre-construction conference before starting construction at a time and place convenient to the Contractor and will review responsibilities and personnel assignments. FAR 52.236-
B.
Progress Meetings: Progress meetings at the Project Site shall be conducted at regular intervals. Dates of meetings shall be coordinated with preparation of the payment request in accordance with FAR 52.232-5.
1.
Agenda: Include topics for discussion as appropriate to the status of the Project. Include review of the Contractor's Construction Schedule and of the present and future needs of each entity present.
2.
Schedule Updating: If the progress of the work falls behind the approved Contractor’s Construction Schedule, the Contractor shall submit a supplementary schedule for approval by the Contracting Officer in accordance with FAR 52.236-15..
1.7 SUBMITTALS
Spill and Erosion Control Plans shall be submitted within 5 calendar days after commencement of construction.
B.
Staff Names: Within 5 calendar days after commencement of construction, submit a list of principal staff assignments, including the Superintendent and other primary personnel. Identify individuals by name, duties and responsibilities, home address, and business and home telephone numbers. Post copies of this list in the temporary field office.
C.
Construction Schedules shall be submitted as directed in FAR 52.236-15, Schedules for Construction.
PART 2 - PRODUCTS (Not applicable)
PART 3 - EXECUTION
3.1
GENERAL COORDINATION PROVISIONS
A.
Inspection of Conditions: Prior to installations, require the installer of each major component to inspect both the substrate and conditions under which work is to be performed.
B.
Construction in Progress: Keep construction in progress, adjoining materials in place, and clean during handling and installation. Apply protective coverings for protection from damage or deterioration.
C.
Completed Construction: Clean completed construction and provide maintenance to prevent damage, soiling or other deterioration through the remainder of the construction period.
END OF SECTION 01310
SECTION 01400 - QUALITY CONTROL
PART 1 - GENERAL
1.1
SUMMARY
A.
This section, FAR 52.246-1 and FAR 52.246-12 include requirements for quality control services to verify quality assurance requirements specified elsewhere in the Contract.
B.
The Government reserves the right to conduct independent tests.
C.
The quality control services include tests and related actions, including reports, performed by the Contractor, independent agencies or governing authorities.
1.2
RESPONSIBILITIES
A.
Contractor Responsibilities: The Contractor shall provide for tests, inspections and other quality control services where specified in the Contract or when required by authorities having jurisdiction. Costs for these services are included in the Contract price. The Contractor shall maintain complete inspection records and make them available to the government.
1.3
QUALIFICATIONS OF INDEPENDENT TESTING AGENCIES
A.
A qualified independent testing Agency shall be an accredited entity engaged to perform tests or inspections, and to report on and, if required, to interpret results of those tests or inspections.
1.3 1.4
SUBMITTALS
A.
Reports: The Contractor shall submit a certified written report, in duplicate, of each test, inspection or other quality control service to the Government.
B.
Written reports shall include but not be limited to the following:
1.
Date of issue.
2.
Project title and number.
3.
Name, address, and telephone number of testing agency.
4.
Dates and locations of samples and tests or inspections.
5.
Names of individuals making the test or inspection.
6.
Designation of the work and test method.
7.
Identifications of product and specification section.
8.
Complete test or inspection data.
9.
Test results and an interpretation of test results.
10.
Ambient conditions at the time of sample taking and testing.
11.
Comments or professional opinion on whether tested or inspected Work complies with Contract Document requirements.
12.
Name and signature of laboratory inspector.
13.
Recommendations on retesting.
C.
Permits, Licenses, and Certificates: For the Government's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgements, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.
PART 2 - PRODUCTS (Not applicable)
PART 3 - EXECUTION (Not applicable)
END OF SECTION 01400
SECTION 01420 - REFERENCES
PART 1 - GENERAL
1.1
DEFINITIONS
A.
General Explanation: Specification language often includes terms that are defined elsewhere in the Contract including the Construction Clauses. Certain terms are defined in this section. These definitions or explanations are not necessarily complete or exclusive, but are general for the Work and may be explained more explicitly in other sections.
B.
"General Conditions" refer collectively to the Construction Contract Clauses, Labor Standards and the U.S. Department of Labor Wage Decision bound into the specifications.
C.
"Indicated" refers to graphic representations, notes or schedules on the Drawings, or to requirements elsewhere in the Specifications or other Contract Documents. Terms such as "shown", "noted", "scheduled" and "specified" have the same meaning as "indicated" and are used to further help locate the reference, but no limitation on location is intended except as specifically stated.
D.
Where "directed", "authorized", "selected", "approved", or a similar term is used in conjunction with the Contractor's submittals, applications, requests and other activities, and the specifications state that an individual other than the Contracting Officer (CO) shall provide this action, it is understood that only the CO has this authority unless the individual stated is so authorized in writing by the CO.
1.
When the individual is so authorized by the CO, the Contractor may still appeal the action to the CO.
2.
The CO’s decision will be final.
3.
In no case shall the CO action be interpreted as releasing the Contractor from responsibility to fulfill the requirements of the Contract.
E.
"Regulations" include laws, ordinances, statutes and lawful orders issued by authorities having jurisdiction, as well as rules, conventions and agreements within the construction industry that control performance of the Work.
F.
"Project site" refers to the space available to the Contractor for performance of the Work, either exclusively or in conjunction with others performing other work.
G.
"Furnish" means to supply and deliver to the Project site, ready for unloading, unpacking, assembling, installation and similar operations.
H.
"Install" describes operations at the Project site, including unloading, temporary storage, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations.
I.
"Provide" means to furnish and install, complete in place and ready for full use.
J.
"Cutting" refers to removal of material by cutting, sawing, drilling, breaking, chipping, grinding, excavating and similar operations.
K.
"Patching" refers to restoration of a surface to its original completed condition by filling, repairing, refinishing, closing and similar operations.
L.
"Installer" is the Contractor or another entity engaged by the Contractor, either directly or indirectly through subcontracting, to perform a particular construction operation at the Project site, including installation, erection, application and similar operations. Installers shall be skilled in the operations they perform.
M.
"Testing agency" or "testing laboratory" is an independent entity engaged to perform specific inspections or tests, either at the Project site or elsewhere, and to report the results of those inspections and tests.
N.
"Notice to Proceed" is the CO’s notification by letter to the Contractor to proceed with the Contract, activating the time period for construction and establishing the completion date.
1.2
CODES AND STANDARDS
A.
Applicability of Standards: Unless the Contract includes more stringent requirements, applicable construction industry standards have the same force and effect, to the extent referenced, as if bound or copied directly into the Contract. Such standards are made a part of the Contract by reference.
B.
Codes: The Work shall be performed in compliance with the latest editions of the following codes: UMC, NEC, IBC and UPC.
C.
Conflicting Requirements. Where compliance with two or more standards is specified, comply with the most stringent requirement. Refer uncertainties, and requirements that are different but apparently equal, to the CO in writing for a decision before proceeding.
D.
Abbreviations: Names and titles of standards are frequently abbreviated. Abbreviations and acronyms used in the Contract mean the recognized name of a trade association, standards-producing organization, authority having jurisdiction or other entity applicable to the context of the particular provision. Except as otherwise indicated, refer to the current editions of the following publications for abbreviations:
1.
"Encyclopedia of Associations: National Organizations of the U.S.", published by Gale Research.
2.
"National Trade and Professional Associations of the United States", published by Columbia Books.
3.
"Means Illustrated Construction Dictionary - New Unabridged Edition" published by R.S. Means Company, Inc.
E.
Abbreviations: Names and titles of standards are frequently abbreviated. Abbreviations and acronyms used in the Contract mean the associated names. The following names may be referenced in the Contract:
1. AASHTO - American Association of State Highway and Transportation
2. ABA - Architectural Barriers Act 3.
ACI - American Concrete Institute
4.
ADA – American’s with Disabilities Act
5.
ADAAG – Americans with Disabilities Act Accessibility Guidelines 6.
AI - Asphalt Institute
7.
AISC - American Institute of Steel Construction
8.
AITC - American Institute of Timber Construction
9.
ALSC – American Lumber Standard Committee
10.
ANSI - American National Standards Institute
11.
ASME – American Society of Mechanical Engineers International
12.
ASTM - American Society for Testing and Materials
13.
AWPA - American Wood-Preservers' Association
14.
AWS - American Welding Society
15.
AWWA - American Water Works Association
16.
CABO - Council of American Building Officials
17.
CFR - Code of Federal Regulations
18.
CRSI - Concrete Reinforcing Steel Institute
19.
CS - Commercial Standard (U.S. Dept. of Commerce)
20.
CSI - Construction Specifications Institute
21.
DOT – Department of Transportation
22.
EIA - Electronic Industries Association
23.
EPA - Environmental Protection Agency
24.
FS - Federal Specification (Publications available from GSA)
25.
GSA - General Services Administration
26.
IBC – International Building Code
27.
IFC – International Fire Code
28.
IPC – International Plumbing Code
29.
ICBO – International Conference of Building Officials
30.
MCAA – Mechanical Contractors Association of America
31.
MSS-Manufacturers Standardization Society of the Valve and Fittings Industry Inc.
32.
NECA – National Electrical Contractors Association
33.
NEMA - National Electrical Manufacturers Association
34.
NEC – National Electrical Code
35.
NFPA - National Fire Protection Association
36.
OSHA - Occupational Safety and Health Administration (U.S. Dept. of Labor)
37.
PCA - Portland Cement Association
38.
SSPC - Steel Structures Painting Council - The Society for Protective Coatings
39.
UFAS – Uniform Federal Accessibility Standards
40.
UL - Underwriters Laboratories Inc.
41.
UBC – Uniform Building Code
42.
UMC – Uniform Mechanical Code
43.
UPC – Uniform Plumbing Code
44.
USDA - U.S. Department of Agriculture
PART 2 - PRODUCTS (Not applicable)
PART 3 - EXECUTION (Not applicable)
END OF SECTION 01420
SECTION 01500 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1
SUMMARY
A.
Provide temporary utilities, support facilities, protection, and controls required for construction. Provide project work signs and secured areas to direct safe construction operations.
1.4 1.2
QUALITY ASSURANCE
A.
Standards and Regulations: Comply with industry standards, codes, and with applicable laws and regulations of authorities having jurisdiction.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1
TEMPORARY UTILITIES
A.
Temporary Electric Power Service: Use of power from existing Government buildings for construction activities is approved.
3.2
TEMPORARY SUPPORT FACILITIES.
A.
Provide temporary enclosures for protection of construction as needed. Collect waste from construction areas and elsewhere daily.
3.3
TEMPORARY PROTECTION FACILITIES.
A.
Barricades, Warning Signs, and Lights: Comply with standards and code requirements for erecting structurally adequate barricades. Paint with appropriate colors, graphics, and warning signs to inform personnel and the public of the hazard involved.
3.4
OPERATION, TERMINATION, AND REMOVAL
A.
Maintain facilities in good operating condition until removal. Each temporary facility shall be removed when need for has ended.
END OF SECTION 01500
SECTION 01700 - EXECUTION REQUIREMENTS
PART 1 - GENERAL
1.1
SUMMARY
A.
This section, FAR 52.236-5, FAR 52.236-12 and FAR 52.236.17 include certain general procedural requirements governing the Contractor's execution of the Work, including, but not limited to laying out the Work, general installation of products, correction of defective Work, and cleaning.
1.2
QUALITY ASSURANCE
A.
Workmanship Standards: Initiate and maintain procedures to ensure personnel performing the Work are skilled and knowledgeable in the methods and craftsmanship needed to produce the required levels of workmanship.(Reference: The Secretary of The Interior’s Standards for the Treatment of Historic Properties (36 CFR Part 68) and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings.) Remove and replace Work that does not comply with workmanship specified and standards recognized in the construction industry for the applications indicated. Remove and replace Work damaged or deteriorated by faulty workmanship or replacement of other Work.
1.
Manufacturer's Instructions: Where installations include manufactured products, comply with manufacturer's applicable installation instructions and recommendations to the extent that those instructions and recommendations are more explicit or stringent than requirements contained in the Contract. The Contracting Officer’s Representative shall be immediately notified of conflicts between manufacturer’s instructions and the Contract.
2.
Minimum Quality and Quantity: The quality level or quantity shown or specified shall be the minimum required for the Work. Except as otherwise indicated, the Work shall comply exactly with that minimum or may be superior to that minimum. Specified numeric values are either minimums or maximums as indicated or as appropriate for the context of the requirements.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
1.5 3.1
LAYING OUT THE WORK
A.
Before proceeding to lay out the Work, verify layout information shown on the Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered notify the Contracting Officer's Representative promptly.
B.
Maintain a minimum of 1 permanent benchmark on the site. Existing BMs are indicated on the drawings.
C.
Existing Utilities and Equipment: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction.
3.2
PREPARATION
A.
Existing Utilities: Furnish information necessary to adjust, move, or relocate existing structures, utility poles, lines, services, or other appurtenances located in or affected by construction. Coordinate with local authorities having jurisdiction.
B.
Take field measurements as required to fit the Work properly.
3.3
INSTALLATION
A.
Locate the Work and components of the Work accurately. Make vertical work plumb and horizontal work level.
B.
Install products at the time and under conditions that will produce satisfactory results.
C.
Conduct construction operations so that no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
D.
Anchors and Fasteners: Provide anchors and fasteners as required to withstand stresses, vibration and physical distortion. Anchor each component securely in place, accurately located and aligned with other Work.
3.4
CORRECTION OF DEFECTIVE WORK
A.
Repair or remove and replace defective construction. Restore damaged substrates and finishes.
B.
Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and proper adjustment of operating equipment.
C.
Remove and replace damaged surfaces that are exposed to view if the surfaces cannot be repaired without visible evidence of repair.
E.
Remove and replace chipped, scratched or broken surfaces.
3.5
CLEANING
A.
Maintain the project site and work areas free of waste material and debris.
B.
Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the work.
1.
Remove liquid spills promptly.
C.
Remove debris from concealed spaces prior to enclosing the space.
D.
Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at the time of project completion.
3.6
PROTECTION
A.
Protect installed work from soiling and damage.
B.
Protective Coverings: Provide appropriate protective coverings for work that might be damaged by subsequent operations. Maintain protective coverings in place until project completion.
END OF SECTION 01700
SECTION 01770 - CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1
SUMMARY
A.
This Section includes requirements for Contract close out.
B.
Substantial Completion is defined as that state when the Contractor has complied with the Contract, except for minor deviations, and the project is sufficiently complete and capable of being occupied and used by the Government for the intended purpose.
1.2
SUBSTANTIAL COMPLETION
A.
Preliminary Procedures: Before requesting inspection for Substantial Completion, complete the following.
1.
Submit a list to the Contracting Officer, of incomplete items, the value of incomplete construction, and reasons the Work is not complete.
2.
Discontinue and remove temporary facilities from the site, along with mockups, construction tools, and similar elements.
B.
Inspection Procedures: The Contracting Officer will notify the Contractor of Substantial Completion following an inspection or advise the Contractor of construction that must be completed or corrected before Substantial Completion.
1.
The Government will repeat the inspection when requested and when assured that the Work is substantially complete.
2.
Results of the completed inspection will form the basis of the requirements for Final Acceptance.
1.3
FINAL ACCEPTANCE
A.
Preliminary Procedures: Before requesting inspection for Final Acceptance, complete the following:
1.
Submit final payment request with releases and supporting documentation not previously submitted and accepted.
2.
Submit an updated final statement accounting for final additional changes to the Contract price.
3.
Submit a certified copy of the previous Substantial Completion inspection list of items.
4.
Complete final clean-up requirements including touch-up painting of marred surfaces.
B.
Final Inspection Procedure: The Government will inspect the Work upon receipt of notice from the Contractor that the Work, including inspection list items from earlier inspections, has been completed, except for items whose completion is delayed under circumstances acceptable to the CO.
1.
Upon completion of inspection, the CO will notify the Contractor of Final Acceptance or will advise the Contractor of Work that it is incomplete or of obligations that have not been fulfilled and are required for Final Acceptance.
1.4
RECORD DOCUMENT SUBMITTALS
A.
Record Drawings: Maintain a clean, undamaged set of blue or black line prints of Contract Drawings and Shop Drawings. Mark the set to show the actual installation where the installation varies substantially from the Work as originally shown. Mark the drawing that is most capable of showing conditions fully and accurately. Where Shop Drawings are used, record a cross-reference at the corresponding location on the Contract Drawings. Give particular attention to concealed elements that would be difficult to measure and record at a later date.
B.
Record Product Data: Maintain one copy of each Product Data submittal. Note related Change Orders and markup of Record Drawings and Specifications.
1.
Mark these documents to show significant variations in actual Work performed in comparison with information submitted. Include variations in products delivered to the site and from the manufacturer’s installation instructions and recommendations.
2.
Give particular attention to concealed products and portions of the Work that cannot otherwise be readily determined later by direct observation.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1
FINAL CLEANING
A.
Clean each surface or unit to the condition expected in a normal, commercial cleaning and maintenance program. Comply with manufacturer’s instructions.
1.
Complete the following cleaning operations before requesting inspection for Final Acceptance.
a.
Clean transparent materials, including mirrors and glass in doors and windows. Remove glazing compounds and other substances that are noticeable vision-obscuring materials. Replace chipped or broken glass and other damaged transparent materials.
b.
Clean exposed exterior and interior hard-surfaced finishes to a dust-free condition, free of stains, films, and similar foreign substances. Restore reflective surfaces to their original condition.
c.
Clean the site, of rubbish, litter and other foreign substances. Remove stains, spills, and other foreign deposits.
B.
Compliance: Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from the site and dispose of it lawfully.
END OF SECTION 01770
DIVISION 2 – EXISTING CONDITIONS
SECTION 02419 – SELECTIVE DEMOLITION
1 GENERAL
1.1 - SECTION REQUIREMENTS
A Items indicated to be demolished become the contractors property and responsibility.. Remove and dispose of promptly and properly.
B Comply with EPA regulations and hauling and disposal regulations of authorities having jurisdiction.
C It is not expected that hazardous materials will be encountered in the Work. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. PRODUCTS (Not Applicable)
2 EXECUTION
2.1 - DEMOLITION
A Provide temporary barricades and other protection required to prevent injury to people and damage to the building.
B Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain or construction being demolished.
C Provide temporary weather protection to prevent water leakage and damage to structure and interior areas.
D Protect walls, ceilings, floors, and other existing finish work that are to remain. Erect and maintain dustproof partitions. Cover and protect furniture, furnishings, and equipment that have not been removed.
E Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
F Promptly remove demolished materials from Owner's property and legally dispose of them. Do not burn demolished materials.
END OF SECTION 02419
DIVISION 4 – MASONRY
SECTION 04902 - STONE RESTORATION AND CLEANING
PART 1 - GENERAL
A. DESCRIPTION of WORK
1. This is part of the preservative, stabilization and repair work on an existing historic log building All work must conform to the Secretary of The Interior’s Standards for the Treatment of Historic Properties (36 CFR Part 68) and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings..
B. This Section includes the following:
1. Cleaning exposed stone surfaces of the interior portion of the fireplace and chimney.
1.2 DEFINITIONS
A. Low-Pressure Spray: 100 to 400 psi (690 to 2750 kPa); 4 to 6 gpm (0.25 to 0.4 L/s).
B. Medium-Pressure Spray: 400 to 800 psi (2750 to 5500 kPa); 4 to 6 gpm (0.25 to 0.4 L/s).
1.3 SUBMITTALS
A. Product Data: For each type of product indicated. Include recommendations for application and use.
B. Samples: For each exposed material required for replacing or repairing existing materials.
C. Qualification Data: For restoration specialists.
1.4 QUALITY ASSURANCE
1.5 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price as shown on the Schedule of Items for the building.
PART 2 - PRODUCTS
2.1 PAINT REMOVERS
A. Covered or Skin-Forming Alkaline Paint Remover: Manufacturer's standard covered or skin-
B. Solvent-Type Paint Remover: Manufacturer's standard water-rinsable, solvent-type gel formulation.
1. Available Products:
a. American Building Restoration Products, Inc.; No. 3 Grip 'N Strip.
b. Diedrich Technologies Inc.; 505 Special Coatings Stripper.
c. Dominion Restoration, Inc.; Dominion Multi-Layer Paint & Graffiti Remover.
d. Dumond Chemicals, Inc.; Peel Away 2.
e. Hydrochemical Techniques, Inc.; Hydroclean Solvent Paint Remover (HT-300).
f. Price Research, Ltd.; Price Strip-All.
g. ProSoCo; Sure Klean Fast Acting Paint Stripper.
2.2 CLEANING MATERIALS
A. Water for Cleaning: Potable.
B. Hot Water: Heat water to a temperature of 140 to 160 deg F (60 to 71 deg C).
C. Job-Mixed Detergent Solution: Solution prepared by mixing 2 cups (0.5 L) of tetrasodium polyphosphate (TSPP), 1/2 cup (125 mL) of laundry detergent, and 20 quarts (20 L) of hot water for every 5 gal. (20 L) of solution required.
D. Job-Mixed Mold, Mildew, and Algae Remover: Solution prepared by mixing 2 cups (0.5 L) of tetrasodium polyphosphate (TSPP), 5 quarts (5 L) of 5 percent sodium hypochlorite (bleach), and 15 quarts (15 L) of hot water for every 5 gal. (20 L) of solution required.
E. Nonacidic Gel Cleaner: Manufacturer's standard gel formulation, with pH between 6 and 9, that contains detergents and chelating agents and is specifically formulated for cleaning masonry surfaces.
1. Available Products:
a. Price Research, Ltd.; Price Marble Cleaner-Gel.
b. ProSoCo; Sure Klean 942 Masonry Cleaner.
F. Mild Acidic Cleaner: Manufacturer's standard mildly acidic cleaner containing no hydrochloric, hydrofluoric, or sulfuric acid; or chlorine bleaches.
1. Available Products:
a. Diedrich Technologies Inc.; Envirorestore 100.
b. Dominion Restoration, Inc.; DR-60 Stone and Masonry Cleaner.
c. Dumond Chemicals, Inc.; Safe n' Easy Heavy Duty Restoration Cleaner.
d. ProSoCo; Sure Klean Light-Duty Restoration Cleaner.
G. Acidic Cleaner: Manufacturer's standard acidic masonry restoration cleaner composed of hydrofluoric acid blended with other acids, detergents, wetting agents, and inhibitors.
1. Available Products:
a. American Building Restoration Products, Inc.; 801 Heavy Duty Masonry Cleaner.
b. Diedrich Technologies Inc.; 101 Masonry Restorer or 101G Granite, Terra Cotta, and Brick Cleaner.
c. Hydrochemical Techniques, Inc.; Hydroclean Brick, Granite, Sandstone and Terra Cotta Cleaner (HT-626).
d. Price Research, Ltd.; Price Heavy Duty Restoration Cleaner or Price Restoration Cleaner.
e. ProSoCo; [Sure Klean Heavy-Duty Restoration Cleaner] [Sure Klean 1028 Restoration Cleaner] [or] [Sure Klean Restoration Cleaner].
PART 3 - EXECUTION
3.1 PROTECTION
A. Protect persons, motor vehicles, surrounding surfaces of building being restored, building site, plants, and surrounding buildings from harm resulting from stone restoration work.
B. Prevent chemical cleaning solutions from coming into contact with pedestrians, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact.
1. Cover adjacent surfaces with materials that resist chemical cleaners used unless chemical cleaners will not damage surfaces. Use materials that contain only waterproof, UV-resistant adhesives. When no longer needed, promptly remove masking to prevent adhesive staining.
2. Keep wall wet below area being cleaned to prevent streaking from runoff.
3.2 CLEANING
A. Proceed with cleaning in an orderly manner; work from top to bottom of each scaffold width and from one end of each elevation to the other.
B. Use only those cleaning methods indicated for each material and location.
1. Do not use wire brushes.
2. Use spray equipment that provides controlled application at volume and pressure indicated, measured at spray tip.
3. For chemical cleaner spray application, use low-pressure tank or chemical pump suitable for chemical cleaner indicated, equipped with cone-shaped spray tip.
4. For water spray application, use fan-shaped spray tip that disperses water at an angle of 25 to 50 degrees.
C. Chemical Cleaner Application Methods: Apply chemical cleaners to stone surfaces to comply with chemical cleaner manufacturer's written instructions; use brush or spray application methods, at Contractor's option. Do not spray apply at pressures exceeding 50 psi (345 kPa). Do not allow chemicals to remain on surface for periods longer than those indicated or recommended by manufacturer.
D. Paint Removal with Solvent-Type Paint Remover:
1. Apply thick coating of paint remover with brush or deep-nap roller.
2. Allow paint remover to remain on surface for period recommended by manufacturer. Agitate periodically with stiff-fiber brush.
3. Rinse with cold water applied by low-pressure spray.
E. Cold-Water Soak: Apply cold water by prolonged spraying until surface encrustation has softened sufficiently to permit its removal by water wash.
1. Remove soil and softened surface encrustation from stone with cold water applied by low-pressure spray.
F. Detergent Cleaning:
1. Wet stone with hot water applied by low-pressure spray.
2. Scrub stone with detergent solution using medium-soft brushes until soil is thoroughly dislodged and can be removed by rinsing.
3. Rinse with hot water applied by low-pressure spray.
G. Mold, Mildew, and Algae Removal:
1. Wet stone with cold water applied by low-pressure spray.
2. Apply mold, mildew, and algae remover by brush or low-pressure spray.
3. Scrub stone with medium-soft brushes until mold, mildew, and algae are thoroughly dislodged and can be removed by rinsing.
4. Rinse with cold water applied by low-pressure spray.
H. Nonacidic Gel Chemical Cleaning:
1. Wet stone with hot water applied by low-pressure spray.
2. Apply nonacidic gel cleaner in 1/8-inch (3-mm) thickness by brush, working into joints and crevices. Apply quickly and do not brush out excessively so area will be uniformly covered with fresh cleaner and dwell time will be uniform throughout area being cleaned.
3. Let cleaner remain on surface for period recommended by manufacturer.
4. Remove bulk of nonacidic gel cleaner by squeegeeing into containers for disposal.
5. Rinse with cold water applied by low-pressure spray.
END OF SECTION 04902
DIVISION 6 – WOODS and PLASTICS section 06100
ROUGH CARPENTRY
Part 1 - GENERAL
Summary
This section specifies rough carpentry, including all framing and supporting structure necessary to replace, install and or repair the log elements of the porches and ramp of a historic log building.
Related sections
06440
LOG REPAIR / REPLACEMENT.
Quality Assurance
Furnish materials complying with the following:
Softwood Lumber.
Graded in accordance with the latest edition of ""Western Grading Rules," WWPA. Where a grade for Douglas Fir (DF) species is indicated, other species, if approved by the COR, may be supplied on an equal stress grade basis.
Pressure Treatment.
Waterborne, conforming to AWPA C2, AWPA P5.
All materials and construction techniques shall meet applicable Local codes or the requirements herein, whichever is stricter.
Part 2 - PRODUCTS
Materials
Lumber.
Furnish lumber with a moisture content of 19 percent or less for material 3 inches and less in nominal thickness, unless otherwise specified.
Pressure Treated Wood Install pressure treated wood in contact with concrete or in damp areas or in contact with the ground.
Framing Members.
Beams.
4 inches and less in width: No.2, DF, S-dry.
5 inches and wider: No. 1 DF.
Part 3 - EXECUTION construction
Framing.
Make joints in beam and girders over supports unless shown otherwise on the drawings.
Nail built-up girders from both sides with 16d nails at 30 inches on center staggered in 2 rows. Provide 2 nails at each end of each piece and each splice.
Set joist with crown side up. Install solid blocking over supports. Provide a minimum of 1-1/2 inch bearing for each joists. .
Lap joists over girders 4 inches minimum. Nail with three 16d nails from each side.
Do not splice columns. Cut ends square to provide full bearing. Nail columns top and bottom with four 16d toenails, or as shown on drawings.
Treated Wood.
Field treat cuts and holes in pressure treated members with copper naphthenate.
Exposed Hardware.
Provide rough hardware for the proper installation of work. Install hot-dipped galvanized hardware, nails, bolts, etc. at locations exposed to the weather.
Part 4 - MEASUREMENT AND PAYMENT (not used)
END OF section
SECTION 06200 - FINISH CARPENTRY
PART 4 - GENERAL
4.1 SUMMARY
A. This Section includes the following:
1. Exterior lumber for window screen fabrication
B. Related section: 08550 Wood Windows
4.2 SUBMITTALS
A. Shop drawings for the window screen assemblies for approval.
4.3 QUALITY ASSURANCE
A. Installer Qualifications: A qualified installer.
4.4 DELIVERY, STORAGE, AND HANDLING
A. Protect materials against weather and contact with damp or wet surfaces.
B. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items listed on the Schedule of Items.
PART 5 - PRODUCTS
5.1 MATERIALS, GENERAL
A. Lumber for Stained Applications: Kiln-dried solid lumber with smooth face and of the following species and grade:
1. Grade Premium eastern white pine, eastern hemlock-balsam fir-tamarack, eastern spruce, or white woods; NELMA, NLGA, WCLIB, or WWPA.
5.2 MISCELLANEOUS MATERIALS
1. A See section 06550 Wood Windows for screen material.
5.3 FABRICATION
A. Wood Moisture Content: Less than 12%
PART 6 - EXECUTION
6.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance. Proceed with installation only after unsatisfactory conditions have been corrected.
6.2 PREPARATION
A. Clean substrates of projections and substances detrimental to application.
B. Before installing finish carpentry, condition materials to average prevailing humidity in installation areas for a minimum of 24 hours.
6.3 FABRICATION, GENERAL
A. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, or too small to fabricate with proper jointing arrangements.
B. Fabricate window screen assemblies to match the existing units both in appearance and detail.
C. Install finish carpentry level, plumb, true, and aligned with adjacent materials. Use concealed shims where necessary for alignment.
1. Scribe and cut finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.
6.4 ADJUSTING
A. Replace finish carpentry that is damaged or does not comply with requirements. Finish carpentry may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing. Adjust joinery for uniform appearance.
6.5 CLEANING
A. Clean finish carpentry on exposed and semiexposed surfaces. Touch up factory-applied finishes to restore damaged or soiled areas.
END OF SECTION 06200
section 06440
LOG REPAIR/REPLACEMENT
Part 1 - GENERAL
1.1 summary
This section specifies log installation and or replacement work on the porches and ramp of an existing historic building.
1.2 related sections
06100
ROUGH CARPENTRY
07205 MOISTURE PROTECTION.
1.3 Quality Assurance
All materials and construction techniques All work must conform to the Secretary of The Interior’s Standards for the Treatment of Historic Properties (36 CFR Part 68) and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings
1.4 Log Replacement.
Repairing or replacing only a segment of a log is not always possible. Replacement of an entire log may be the only solution if it has been substantially lost to decay and collapsed under the weight of logs above it. Log replacement, which should be carried out only by experienced craftspersons. Potential danger to the structure may include creating inadequate temporary bearing points To begin the process of log replacement, the entire length of the log must be inspected to determine whether it supports any structural members or features, and how their load can be taken up by bracing so features that are supported by or tied into the log can be protected or removed.
A replacement log should be obtained to match the wood species of the original being removed. If it is a hewn log, then the replacement must be hewn to replicate the dimensions and tool marks of the original. It should, however, be chosen to match the visual characteristics of the original species as closely as possible.
Part 2 - PRODUCTS
Materials
Logs.
White pine Logs that are straight with a minimum taper which are peeled and dried to a moisture content of: 15% or less Part 3 – EXECUTION
3.1 Log Supports ( rear deck)
Replace support logs on one end of the rear deck. The horizontal member must be scribed and cut to accept the half log elements of the deck. The log support assembly must match the existing assemblies, refer to subsection 1.4 of this section for methodology. Also see (refer to section 07205) for moisture protection methods.
3.2 Half Logs (rear deck)
Replace 3 half logs under rear deck. These elements will be spliced at and fitted into horizontal support members. The dimensions of the half logs are: 2 at 10” by 55‘ and 1 at 8” by 55’. Refer to subsection 1.4 of this section for methodology. Also see section 07205 for moisture protection methods.
3.3 Logs for railings (side porch).
Install lower log rails and log crossbucks (See drawings)
3.4 Logs for railings (ramp).
Replace existing wood rails and supports with log rails,supports and log crossbucks (See drawings). See section 07205 for moisture protection methods.
Part 4 - MEASUREMENT AND PAYMENT (not used)
END OF section
DIVISION 7 – MOISTURE PROTECTION
section 07205
PRESERATIVES
Part 1 Part 1 - GENERAL
1.1 summary
This section specifies the use of borate containing products for preservation and restoration work on existing historic log buildings.
1.2 related sections
06440 LOG REPAIR/REPLACEMENT
1.3 Quality Assurance
All materials and construction techniques must conform to the Secretary of The Interior’s Standards for the Treatment of Historic Properties (36 CFR Part 68) and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings. and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings..
Part 2 - PRODUCTS
Materials
Borate impregnated glass rods Furnish Impel rods or Cobra rods, both of which can be purchased at: Schroeder Log Home Supply www.loghelp.com or 1-800-359-6614.
Part 3 - EXECUTION
3.1 See section 06440 Log repair/replacement, subsections 1.4-1.6 and 3.1.
3.2 Follow the manufacturer’s instructions for the use of the products specified in this section.
Part 4 - MEASUREMENT AND PAYMENT (not used)
END OF section
DIVISION 8 – OPENINGS
END OF SECTION 08211
SECTION 08550 - WOOD WINDOWS
PART 7 - GENERAL
1.1 Summary
This section specifies the fabrication, repair and or preservation of wood screen windows for an existing historic building. See section 06200 Finish Carpentry for fabrication information. In the Pavilion there are for large and two small solid wood screen windows that need to be supplied. There are also several windows that need to be rescreened with the appropriate screen material.
1.3 Related sections
06200 FINISH CARPENTRY
09931 EXTERIOR WOOD STAINS
1.3 Quality Assurance
All materials and construction techniques must conform to the Secretary of The Interior’s Standards for the Treatment of Historic Properties (36 CFR Part 68) and The SIO’s Standards for Rehabilitation and Illustrated Guidelines for Rehabilitating Historic Buildings.
PART 2 PRODUCTS
2.1 General 2.2
HARDWARE
1.5.1.1.1 A
Provide hardware matching as closely as possible to existing period hardware.
1.5.1.2 2.3
INSECT SCREENS
1.5.1.2.1 A
General: Replace parts of window screens and hardware as needed to accommodate screens in a tight-fitting fashion that matches as closely as possible to existing construction and hardware with a minimum of exposed fasteners and latches. Locate screens on outside of windows.
1.5.1.2.1.1 B
Wire-Fabric Finish: bronze wire mesh matching the existing fabric.
PART 3 EXECUTION
3.1 FABRICATION
3.1.1.1.1 A
General: Replace parts of windows and hardware as needed to match as closely as possible to existing period construction.
3.2 WOOD FINISHES
3.2.1.1.1 A
Apply finish to exposed exterior wood surfaces.
B Finishes: See section 09931 Exterior Wood Stains.
3.3 PROTECTION AND CLEANING
A Protect window surfaces from contact with contaminating substances resulting from construction operations.