Exhibit 2 - Map Trail.pdf

PDF 3 MB Posted

Attached to
RECOVERY* Trail Maintainence , Nantahala National Forest, North Carolina
Solicitation number
AG-4419-S-10-0316
Issued by

About this file

Exhibit 2 - Map Trail

View the file

Other files

File Type Posted
Prebid Meeting Sign-in w Q A.pdf PDF
PreBid Meeting notes.pdf PDF
Attachment 1 - Revised Specifications.doc DOC document
Attachment 4 - Supplemental Specifications.doc DOC document
SF30 - Amendment 1.pdf PDF
Section M - Revised Evaluation Criteria .doc DOC document
Section B - Revised Schedule of Items.doc DOC document
Attachment 2 - Design Parameters.pdf PDF
Attachment 3 - Wage Determination.doc DOC document
Attachment 1 - Specifications.pdf PDF
Section B - Schedule of Items.doc DOC document
Section A - SF1449.pdf PDF
Exhibit 1 - Drawings.pdf PDF
Sections C thru M - Solicitation.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7000A

C

2551A

SR

2550A

SR

7000A2

2550F

E

2550D

1C

7000A1

2A

SR28

2550B

521B

TR38

TR38A

TR152A

TR152

TR152B

ARRA Trail Maintenance Project, Tasli Trail System

USFS Land FS System Road not used as trail FS System Road used as trail, not in maintenance contract

Single Track Trail, Included in Maintenance Contract (27.8 miles) Thompson Loop, TR152, 4.7 mi.

Mouse Branch, TR152A, 5.3 mi.

Thompson Connector, TR152B, 0.8 mi.

Tsali Left Loop, TR38A, 7.9 mi.

Tsali Right Loop, TR38, 9.1 mi.

0 1 Miles

Trail segments where maintenance work is to be performed are single track trails designated for horse and bike use.

(trail segments are highlighted in yellow)

File details come from the government source that posted it. Updated .