About this file

Pricing Schedule

View the file

Other files

File Type Posted
Correction to SOW.doc DOC document
Appendix B.docx DOCX document
Appendix C.docx DOCX document
Appendix A.docx DOCX document
GA360_dvb.txt TXT text file
GA307_dvb.txt TXT text file
CONSTRUCTION_RFP.doc DOC document
GA314_dvb.txt TXT text file
bridge_rail7b.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bridge Repair Base Bid

FSR
District
Bridge Name
Description of work
Quantity
Unit of Measure
Method of Measurement
Price

646-6.89

Chattooga
Burrells Ford
552 (01) – Repair spalling on bridge deck

556 (01) – Replace the bridge railing and posts

556 (02) – Replace the Hazard Markers

563 (01) - Sandblast w/ containment and paint all steel members

Lump Sum Sq. Ft

Lin Ft

Ea

Lump Sum

AQ

AQ

AQ

Lump Sum Bridge total

248-0.0

Blue Ridge
John Dick Road Bridge
404(01) – Minor Hot Asphalt Concrete

556 (01) – Replace the bridge railing and posts

556(03) Remove vegetation from the deck and curb

557(01)Timber Running planks

Lump Sum Lump Sum

Lin Ft

Sq Ft

Lump Sum

Lump Sum Lump Sum

AQ

AQ

Lump Sum

Bridge Total

901-0.91

Oconee
Falling Creek
306(01)- Recondition Approaches to bridge 100’

552 (01a) – Repair spalling on bridge deck and piers

552(02) – Clean and seal deck joints

552(04) – Epoxy cracks and rebar repairs

556 (01) – Replace the bridge railing

Lump Sum

Sq. Ft

Sq. Ft

Sq. Ft

Lin Ft

Lump Sum

AQ

AQ

AQ

Sheet Total

Base Bid

FSR
District
Bridge Name
Description of work
Quantity
Unit of Measure
Method of Measure
Price
92B-2.8
Chattooga
Brown Bottoms
306(01)- Recondition Approaches to bridge 100’

556 (01) – Replace the bridge railing and posts

556 (03) –Remove vegetation from the deck and railing

119.4

Lump Sum

Lin Ft

EA

Sq ft Lump Sum

AQ

AQ

CC

92-0.3
Chattooga
Red Root
306(01)- Recondition Approaches to bridge 100’

556 (02) – Replace the Hazard Markers

556(03) Remove vegetation from the deck and curb Lump Sum

EA

Sq ft Lump Sum

AQ

CC

86B-0.2
Chattooga
Billingsley Creek
306(01)- Recondition Approaches to bridge 100’

552 (01) – Repair spalling on deck

556 (01) – Replace the bridge railing and posts

Lump Sum

Sq FT Lin Ft

Lump Sum Lump Sum

AQ

AQ

86-1.4
Chattooga
Overflow River
306(01)- Recondition Approaches to bridge 100’

556 (01) – Replace the bridge railing and posts

556(03) – Replace the bridge approach railing and posts

Lump Sum Lin Ft

Lin Ft

Lump Sum Lump Sum

AQ

AQ

376-1.0
Chattooga
Raper Creek
306(01)- Recondition Approaches to bridge 100’

556 (01) – Replace the bridge railing and posts

Lump Sum

Ea

Lump Sum Lump Sum

AQ

AQ

144-0.0
Blue Ridge
Dicks Creek Bridge
306(01)- Recondition Approach to bridge 100’

552 (01) – Repair spalling on bridge deck

552(02) – Clean and seal deck joints

Lump Sum

Sq Ft

Sq Ft

Lin Ft

Lump Sum Lump Sum

AQ

AQ

AQ

Option Items

Sheet total

FSR
District
Bridge Name
Description of work
Quantity
Unit of Measure
Method of Measurement
Price
28-1-1.8
Blue Ridge
Montgomery Creek
306(01)- Recondition Approaches to bridge 100’

552 (01) – Repair spalling on bridge deck

552(02) – Clean and seal deck joints

552(03) – Clean the deck and drains

556 (01) – Replace the bridge railing and posts

556(03) – Replace the bridge approach railing and posts

Lump Sum Sq. Ft

Sq. Ft

Lump Sum

Lin Ft Ea

Lin Ft Lump Sum

AQ

AQ

Lump Sum

AQ

AQ

28-1-5.7
Blue Ridge
Jones Creek
306(01)- Recondition Approaches to bridge 100’

552 (01) – Repair spalling on bridge deck

552(02) – Clean and seal deck joints

552(03) – Clean the deck and drains

Lump Sum

Sq. Ft

Sq. Ft

Lump Sum

Ea

Lump Sum

AQ

Lump Sum

AQ

Sheet total

Project total