Correction to SOW.doc
DOC document 22 KB Posted
- Solicitation number
- AG-4419-S-10-0180
About this file
Corrections to Work List for Raper Creek Road Bridge
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix B.docx | DOCX document | |
| Appendix C.docx | DOCX document | |
| Appendix A.docx | DOCX document | |
| Schedule_of_items3.doc | DOC document | |
| GA360_dvb.txt | TXT text file | |
| GA307_dvb.txt | TXT text file | |
| CONSTRUCTION_RFP.doc | DOC document | |
| GA314_dvb.txt | TXT text file | |
| bridge_rail7b.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CORRECTION TO SECTION C OF CONSTRUCTION RFP
On Page 12 of 47 of RFP For:
FSR 376-1.0 Raper Creek Road Bridge Under Work List
Delete:
· Repair Honeycomb in back of wall of abutment1 (spalling)
· Clean and Seal exposed rebar on the bridge
· Clean and seal cracks in the bridge abutments and piers and joints
Add:
· Replace hazard markers
· Clean, sandblast, and paint the structural steel on the bridge