About this file

Appendix A

View the file

Other files

File Type Posted
Correction to SOW.doc DOC document
Appendix B.docx DOCX document
Appendix C.docx DOCX document
Schedule_of_items3.doc DOC document
GA360_dvb.txt TXT text file
GA307_dvb.txt TXT text file
CONSTRUCTION_RFP.doc DOC document
GA314_dvb.txt TXT text file
bridge_rail7b.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A Standard Specifications for the Repair of Concrete M-47, 08-96 M-47 (M0470000.896)

STANDARD SPECIFICATIONS

FOR

REPAIR OF CONCRETE

August 1996 United States Department of the Interior Bureau of Reclamation Technical Service Center Denver Federal Center Denver, Colorado 80225-0007 Contents Page How to Use This Manual

1. General requirements

1.1 General

1.2 Designs

1.3 Submittals

1.4 Quality assurance

1.5 Materials and workmanship

1.6 Safety

1.7 Repair procedures

2. Concrete preparation for repair

2.1 Removal and cleaning

2.2 Saw cut edges

2.3 Reinforcing steel

2.4 Maintenance of prepared surfaces

3. Specifications for repairing concrete

3.1 Surface grinding

3.2 Portland cement mortar

3.3 Dry pack and Epoxy Bonded Dry Pack

3.4 Preplaced aggregate concrete

3.5 Shotcrete

3.6 Concrete replacement

3.7 Epoxy bonded epoxy mortar

3.8 Epoxy bonded concrete

3.9 Polymer concrete systems

3.10 Thin polymer concrete overlay

3.11 Resin injection

3.12 High molecular weight methacrylic sealing compound . . 49

3.133 Surface impregnation

3.14 Silica fume concrete

3.15 Alkyl-alkoxy siloxane sealing compound

SECTION 1 - GENERAL REQUIREMENTS

1.1 GENERAL

Concrete that is damaged from any cause; structural concrete that has cracked; concrete that is honeycombed, fractured, or otherwise defective; and concrete that, because of excessive surface depressions, must be excavated and built up to bring the surfaces to the prescribed lines, shall be repaired or replaced in accordance with these specifications and contract requirements. The method of repair or replacement (procedure) shall be as determined and directed by the Contracting Officer.

Contract, as used herein, shall mean the contract which, by reference, these specifications are included in and made a part. Contracting Officer, as used herein, shall mean the person executing the contract on behalf of the Government, and shall include duly authorized representatives. Contractor, as used herein, shall mean the party entering into the contract with the Government, and shall include subcontractors, suppliers, manufacturers, and agents at all tiers.

1.2 DESIGNS

Concrete mixture proportions, compressive strengths, and other design requirements shall be as specified in these specifications. Designs by the Contractor shall be subject to the approval of the Contracting Officer.

1.3 SUBMITTALS

Submittals shall be in accordance with these specifications and the contract requirements entitled "Submittal Requirements." The Contractor shall submit MSDS (Material Safety Data Sheets), approval drawings and data, repair plans, certifications, material samples, test data and samples, and other submittals as required in these specifications. The Contractor shall be responsible for the accuracy of all submittals. Unless specified otherwise submittals shall include the original and 2 copies.

1.4 QUALITY ASSURANCE

Quality assurance shall be in accordance with the requirements of the contract entitled "Quality Assurance," and with the requirements of these specifications.

All concrete shall be repaired as necessary to produce surfaces conforming to the specified tolerances and finish requirements of the contract in which these specifications are incorporated by reference and as outlined in section 3.

If, in the opinion of the Contracting Officer, the results of concrete repair indicate that proper quality control procedures are not being consistently utilized, further repair work may be suspended in whole or in part at the discretion of the Contracting Officer. Such suspension will be effective until the Contractor demonstrates substantial improvement in quality control procedures and repair results.

a. Contractor's quality control. - In accordance with the clause in the contract entitled "Inspection of Construction," the Contractor shall be responsible for providing quality control measures to ensure compliance of the repair with these specifications. The Contractor shall implement necessary and appropriate quality control procedures to ensure that all concrete repairs conform to the requirements of these specifications.

b. Government inspection and tests. - Government inspection and tests will be in accordance with the clause in the contract entitled "Inspection of Construction," and with these specifications. Not less than 24 hours in advance of any concrete repair, the Contractor shall inform the Contracting Officer when the concrete repairs will be performed and, unless inspection is specifically waived, the repairs shall be performed only in the presence of an authorized representative of the Contracting Officer.

c. Testing. - Except as specified in paragraphs 3.5 and 3.12 of the specifications the Contractor shall perform all tests. The Contractor shall provide all materials, equipment, and labor necessary for performing the tests at no additional cost to the Government.

d. Approval. - Approval of the repairs will be based on the inspection and testing requirements of these specifications.

e. Rejection. - Repairs that fail to meet the requirements of these specifications will be rejected.

1.5 MATERIALS AND WORKMANSHIP

a. Materials. - The Contractor shall furnish all materials for repair or maintenance of concrete and shall furnish all materials for forming, curing, and protection of the repairs, as required. All materials shall meet materials specifications as specified in section 3, and all equipment used and methods of operation for the repair or maintenance of concrete shall be subject to approval of the Contracting Officer.

The references to materials in the specifications, wherein manufacturer's products or brands are specified by "brand name or equal" purchase descriptions, are made as standards of comparison only as to type, design, character, or quality of the article required, and do not restrict the Contractor to the manufacturer's products or to the specific brands named. It shall be the responsibility of the Contractor to prove equality of materials and products to those referenced and to provide all descriptive information, test results, and other evidence as may be necessary to prove the equality of materials or products which the Contractor offers as being equal to those referenced.

b. Workmanship. - Concrete shall be repaired by skilled workmen as outlined in section 3.

1.6 SAFETY

All work shall be performed in accordance with the applicable safety and health standards, the requirements of Reclamation's "Health and Safety Standards," the contract, and these specifications. Certain additional safety precautions shall be employed to prevent skin and eye contact with chemicals, resins, or monomeric materials. Protective glasses and clothing, including rubber or plastic gloves shall be worn by all persons handling monomeric materials. All exposed skin areas shall be protected with a protective barrier cream formulated for that purpose. Barrier cream for skin protection shall be specified for the materials used and approved by a physician. Adequate ventilation shall be provided and maintained at all times during use of monomeric materials and solvents. Fans used for ventilating shall be explosion proof. If necessary, respirators that filter organic fumes and mists shall be worn. All contaminated materials such as wipes, empty containers, and waste material shall be continually deposited in containers that are protected from spillage. Spillage shall be immediately and thoroughly cleaned up and disposed of in accordance with applicable regulations.

Federal Standard No. 313, as amended, for the preparation and submission of material safety data sheets is hereby incorporated and made a part of these specifications. In accordance with the clause in the contract entitled "Hazardous Material Identification and Material Safety Data," the Contractor shall submit a completed MSDS (Material Safety Data Sheet), Department of Labor Form OSHA174, or GSA-approved Alternate Form A for each hazardous material as required by Federal Standard No. 313, as amended. The information in this MSDS shall be followed to assure safe use, handling, storage, and an environmentally acceptable disposal of the commodity used on the job site.

The Contractor shall submit to the Contracting Officer, not less than 30 days prior to job site delivery of each hazardous material, completed MSDS and identification and certification for the material.

1.7 REPAIR PROCEDURES

All repair or maintenance procedures shall be performed in accordance with the applicable specifications of section 3, including surface preparation, forming, finishing, and curing.

SECTION 2 - CONCRETE PREPARATION FOR REPAIR

Concrete to be repaired shall be prepared in accordance with the requirements of this paragraph and with the special requirements of section 3.

2.1 REMOVAL AND CLEANING

All damaged, deteriorated, loosened, or unbonded portions of existing concrete shall first be removed by water blasting, bush hammering, jack hammering, or any other approved method, with approved equipment, after which the surfaces of existing concrete shall be prepared by contained shotblasting, wet sandblasting, or water blasting to remove any microfractured surfaces resulting from the initial removal process. The surfaces shall then be cleaned and allowed to dry thoroughly, unless the specific repair technique requires application of materials to a saturated surface. Concrete removal processes involving the use of jack hammers in excess of 30 pounds, dry sandblasting, or scrabblers shall not be used without approval by the Contracting Officer. The use of acids for cleaning or preparing concrete surfaces for repair will not be permitted.

2.2 SAW CUT EDGES

The perimeters of repairs to concrete that involve concrete removal and subsequent materials replacement shall be saw cut perpendicular to the repair surface to a minimum depth of 1 inch. Featheredge repairs to concrete shall not be used.

2.3 REINFORCING STEEL

All loose scale, rust, corrosion by products, or concrete shall be removed from exposed reinforcing steel. Reinforcing steel exposed for more than one-third of its perimeter circumference shall be completely exposed to provide 1-inch minimum clearance between the steel and the concrete. Damaged or deteriorated reinforcing steel shall be removed and replaced as directed by the Contracting Officer.

2.4 MAINTENANCE OF PREPARED SURFACES

After the concrete has been prepared and cleaned, it shall be kept in a clean, dry condition until the repair has been completed. Any contamination, including oil, solvent, dirt accumulation, or foreign material shall be removed by additional wet sandblasting and air-water jet cleanup followed by drying.

SECTION 3 - SPECIFICATIONS FOR REPAIRING CONCRETE

3.1 SURFACE GRINDING

Where bulges, offsets, and other irregularities exceed the specified tolerances, the protrusions shall be repaired so that the surfaces are within the specified limits. Surface grinding techniques may be used for this purpose subject to the following limitations:

a. Grinding of surfaces subject to cavitation erosion (hydraulic surfaces subject to flow velocities exceeding 40 feet per second) shall be limited in depth so that no aggregate particles are exposed more than 1/16 inch in cross section at the finished surface.

b. Grinding of surfaces exposed to public view shall be limited in depth so that no aggregate particles are exposed more than 1/4 inch in cross section at the finished surface.

c. Grinding of all other surfaces shall be as directed by the Contracting Officer. In no event shall surface grinding result in exposure of more than one-half the diameter of the maximum-size aggregate.

d. Where surface grinding has caused or will cause exposure of aggregate particles greater than the limits of subparagraph 3.1.a. or b., the concrete shall be repaired by excavating and replacing the concrete in accordance with paragraph 3.6 or 3.8. as directed by the Contracting Officer.

3.2 PORTLAND CEMENT MORTAR

a. General. - Repairs with portland cement mortar shall be made only if specifically approved by the Contracting Officer. Approval for hand-applied cement mortar repairs will be given only for very small repair areas not associated with critical performance of the structure. When approved, portland cement mortar may be used for repairing defects on exposed, new concrete surfaces if the defects are small and are too wide for dry pack and too shallow for concrete replacement and only if the repairs can be completed within 24 hours of removing the forms. Portland cement mortar shall not be used for repairs to old or existing concrete or for repairs that extend to or below the first layer of reinforcing steel.

b. Submittals. - Before beginning any repair work, the Contractor shall submit a detailed list of the equipment, procedures, and materials the Contractor proposes to use for cement mortar repair to the Contracting Officer for approval.

c. Quality assurance. - Quality assurance shall be in accordance with paragraph 1.4.

d. Materials. - Portland cement mortar shall consist of type I or type II portland cement, clean water, and clean, well-graded sand passing a 1.18-mm (No. 16) sieve. All mortar materials, including curing compound shall meet the requirements of subparagraph 3.6.d.

e. Safety. - All work shall be performed in accordance with the requirements of paragraph 1.6.

f. Concrete preparation. - After damaged or defective concrete has been removed as specified in section 2, the surface on which mortar is to be placed shall be prepared by being thoroughly cleaned of all micro fractured, loose, or deteriorated materials and surface-dried.

g. Application and Mixture Proportioning. - Portland cement mortar shall be composed of portland cement, sand, and water, all well mixed and brought to proper consistency. Mortar mixtures and application techniques shall be in accordance with the requirements for mortar replacement method as described in Reclamation's "Concrete Manual", Eighth Edition, revised, chapter VII. Cement mortar shall not be applied until approval of all submittals has been received from the Contracting Officer.

h. Curing. - All cement mortar repairs shall be water cured for 7 days following application. At no time during this initial curing period shall the mortar be allowed to dry. If drying occurs, the repair shall be removed and replaced. If the repair is removed and the original concrete is older than the maximum specified in subparagraph 3.2.a., another repair method shall be used in accordance with these specifications. Following the 7-day curing period and while the repair is still saturated, the surface of the repair shall receive two coats of wax-base (type I) or water-emulsified resin base (type II) curing compound meeting the requirements of subparagraph 3.6.d.

3.3 DRY PACK AND EPOXY BONDED DRY PACK

a. General. - The dry pack concrete repair technique shall be limited to areas that are small in width and relatively deep, such as core holes, holes left by the removal of form ties, cone-bolt and she-bolt holes, and narrow slots cut for repair of cracks. Epoxy bonded dry pack shall be used for critical repairs or for repairs expected to be exposed to severe service conditions. Dry pack shall not be used for shallow depressions where lateral restraint cannot be obtained, nor for filling behind steel reinforcement.

b. Submittals. - Before beginning any repair work, the Contractor shall submit to the Contracting Officer for approval, data for the mortar materials and as provided by paragraph 3.8.b.(2).

c. Quality assurance. - Quality assurance shall be in accordance with paragraph 1.4.

d. Materials. - Dry pack mortar shall consist of type I or II portland cement, clean sand that will pass a 1.18-mm (No. 16) sieve, and clean water. All dry pack materials, including curing compound, shall meet the requirements of subparagraph 3.6.d. Epoxy bonding resin shall meet the requirements of paragraph 3.8.d.(2).

e. Safety. - All work shall be performed in accordance with the requirements of paragraph 1.6.

f. Concrete preparation. - Holes for dry pack shall have a minimum depth of 1 inch and shall be square at the surface edge. A careful inspection shall be made to ensure that the hole is thoroughly clean and is in sound concrete. The interior surfaces of the hole shall be presoaked prior to application of the dry pack. If epoxy bonded dry pack is to be used presoaking the repair area prior to application of the dry pack shall not be performed.

g. Application. - A mortar bond coat or epoxy resin bond coat shall be applied to the concrete hole surface prior to placing dry pack. The mortar bond coat shall consist of 1 part portland cement to 1 part sand mixed with water to give a fluid paste consistency. The mortar bond coat shall be thoroughly brushed onto the hole surfaces. The epoxy resin bond coat shall consist of materials and be applied in accordance with the provisions of paragraph 3.8.g.(3). Dry pack mortar shall consist of 1 part portland cement to 2.5 parts sand (by weight) and shall be mixed with just enough water so that the mortar will stick together when molded by hand and not exude water when squeezed.

The dry-pack mortar shall be immediately packed into place in 3/8-inch compacted layers before the bond coat has dried or cured.

Each layer shall be compacted over the entire surface by tamping with a hardwood dowel and hammer. Hardwood dowels are used in preference to metal bars because the bars tend to polish the surface of each layer. The final layer shall be finished immediately after compaction by laying the flat side of a hardwood board against the fill and striking the board firmly with a hammer.

h. Curing. - Proper curing is essential for a successful dry-pack repair. The surface of the repair area shall be protected from drying and shall be kept continuously moist for 7 days. The surface of the repair shall be protected from surface drying by using burlap kept wet, wet sand, or plastic sheeting over a water soaker hose, or other methods approved by the Contracting Officer. After 7 days and while the surface is still damp, two coats of curing compound shall be applied to prevent moisture loss. The dry-pack repair area shall not be exposed to freezing temperatures for 3 days after application of the curing compound.

3.4 PREPLACED AGGREGATE CONCRETE

a. General.

(1) Preplaced aggregate concrete (PAC) is concrete that has been made by forcing a grout into the voids of a mass of clean, graded, coarse aggregate. As a repair method, PAC is used where placing conventional concrete is extremely difficult, such as in underwater repairs, concrete and masonry repairs, or where shrinkage of concrete must be kept to a minimum. In underwater repairs, injection of grout at the bottom of the PAC displaces water, leaving a homogeneous mass of concrete with a minimum of paste washout. For the purpose of this repair method, grout is defined as a mixture of water, cementitious materials, sand, and admixtures.

(2) Reference standards and specifications for PAC. - Reference standards and specifications for materials, testing, and proportioning PAC shall be the standards listed below. Standards and specifications for testing concrete and concrete materials shall be in accordance with applicable ASTM and ACI standards.

(a) ASTM C 937 - Standard Specification for Grout Fluidifier for Preplaced-Aggregate Concrete.

(b) ASTM C 938 - Standard Practice for Proportioning Grout Mixtures for Preplaced-Aggregate Concrete.

(c) ASTM C 939 - Standard Test Method for Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method).

(d) ASTM C 940 - Standard Test Method for Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in the Laboratory.

(e) ASTM C 941 - Standard Test Method for Water Retentivity of Grout Mixtures for Preplaced-Aggregate Concrete in the Laboratory.

(f) ASTM C 942 - Standard Test Method for Compressive Strength of Grouts for Preplaced-Aggregate Concrete in the Laboratory.

(g) ASTM C 943 - Standard Practice for Making Test Cylinders and Prisms for Determining Strength and Density of Preplaced-Aggregate Concrete in the Laboratory.

(h) ASTM C 953 - Standard Test Method for Time of Setting of Grouts for Preplaced-Aggregate Concrete in the Laboratory.

(i) American Concrete Institute Standard (ACI-304), Recommended Practice for Measuring, Mixing, Transporting, and Placing Concrete.

b. Submittals.

(1) At least 60 days prior to beginning repair work, the Contractor shall submit for approval a repair plan for PAC construction. The repair plan shall include detailed drawings of formwork construction, the grout injection system including sequence of injecting grout into insert pipes, location and spacing of injection tubes, sounding wells, and pipes; a description of all equipment including pumps, sizes and diameters of pipes, hoses, and connections; the planned operating procedures and pumping rates for grout; methods of placing coarse aggregate; methods of consolidating aggregates and PAC during grouting; and communication facilities between the grout mixing and pumping plant and PAC placement.

The proportions of grout mixtures and fresh properties of grout shall be submitted with the repair plan. Included with the grout proportions, shall be the voids content and compacted density of aggregates before injection of grout, the density of hardened PAC, and the compressive strengths of PAC at 7 and 28 days' age.

(2) The Contractor shall submit for approval to the Contracting Officer's representative a proposed specific operating procedure including a hazard analysis for all preplaced aggregate concreting and grout injecting operations. The specific operating procedure shall include such things as engineering controls, protective clothing, eye protection, respiratory protection, and air sampling as necessary to check the effectiveness of the control program.

(3) Pump rating curves and complete mixer details, including photographs or drawings of the proposed mixing equipment, shall be submitted to the Contracting Officer for approval 30 days prior to use. The Contracting Officer shall have the right to require the Contractor to make changes in the equipment which the Contracting Officer determines necessary to make the equipment perform satisfactorily during the grouting operations without additional cost to the Government

(4) The Contractor shall submit test results from testing of cylinders in accordance with the requirements of subparagraph c. below.

c. Quality assurance. - Quality assurance shall be in accordance with paragraph 1.4 and these specifications. Unless otherwise directed, grout mixtures shall be proportioned in accordance with ASTM C 938.

For normal structural work, the ratio of cementitious materials (cement plus pozzolan) to sand shall be 1:1. If leaner mixes are required (generally for low heat generation), the ratio may be adjusted, but shall not exceed 1:2.

The ratio of cement to pozzolan, by weight, shall be between 2:1 and 4:1 as directed by the Contracting Officer.

The ratio of water to cementitious materials W P+C where:

W = weight of water P = weight of pozzolan C = weight of concrete shall not exceed 0.50 by weight. For severe exposure conditions, the W/P+C ratio shall be in accordance with Reclamation's "Concrete Manual," Eighth Edition, revised, chapter III, table 15.

The pumpability of grout containing fine sand (grading 1, table 2 of ASTM C 637) shall be controlled by the consistency test using the flow cone in accordance with ASTM C 939. The flow time shall be between 20 and 30 seconds unless it can be demonstrated that grout can be effectively pumped at a different flow time.

Compressive strength cylinders shall be cast in accordance with ASTM C 943 and tested at 7 and 28 days' age with a minimum of two cylinders tested for each age. The design compressive strength of PAC shall be 4,000 pounds per square inch at 28 days' age. The required average strength for PAC is that which will ensure that 80 percent of all test cylinders exceed the design strength.

The quality of the top of formed PAC placements shall be ensured by venting air, water, and low-quality grout from the uppermost location in the placement.

For unformed surfaces where a screeded or troweled finish is required, the grout level shall flood the top surface above any aggregate, and any diluted grout shall be removed by brooming. A thin layer of pea gravel having a maximum-size aggregate (MSA) of 3/8 inch shall be worked into the surface by raking and tamping or internal vibration. The surface shall be finished in accordance with conventional concrete procedures to resemble the finish of the surrounding concrete. Care shall be taken when topping off the unformed surface to avoid lifting or loosening of the surface aggregate.

d. Materials. - Materials for PAC shall be in accordance with the requirements of ASTM C 938 and the following additional requirements:

(1) Pozzolan. - Pozzolan shall meet the requirements of ASTM C 618 for class F pozzolan.

(2) Admixtures.

(a) Air-entraining admixture. - Air-entraining admixture (AEA) shall meet the requirements of ASTM C 260. The amount of AEA used for injecting mortar shall be that amount necessary to effect a total air content in the mortar, prior to injection, of 9 percent, plus or minus 1 percent, by volume of mortar.

(b) Grout fluidifier. - Grout fluidifier shall meet the requirements of ASTM C 937.

(c) Chemical admixtures. - Chemical admixtures, if permitted, shall meet the requirements of ASTM C 494 for types A, D, F, or G admixtures. Chemical admixtures shall not be used without prior approval from the Contracting Officer.

(3) Sand. - Sand shall consist of natural particles which may be supplemented by limited quantities of crushed sand to make up for deficiencies in the natural materials. Natural sand is required due to its favorable particle shape for pumping grout. Sand for PAC differs from sand used for conventional concrete, primarily in its finer grading. Sand shall meet the quality requirements of subparagraph 3.6.d.; and the grading requirements of ASTM C 938.

(4) Coarse aggregate . - Coarse aggregate shall be clean and well-graded. Unless otherwise directed, the MSA shall be 1-1/2 inches, and after compaction in the forms, shall have a voids content from 35 to 45 percent.

Coarse aggregate shall meet the quality requirements of subparagraph 3.6.d.; and, the grading requirements of ASTM C 637, table 2, grading 1 for coarse aggregate.

For larger placements, the largest size aggregate that can economically be placed shall be used. The MSA and grading of coarse aggregate for these placements should follow the guidelines of ACI 304.

e. Safety. - All work shall be performed in accordance with requirements of paragraph 1.6 and these specifications.

The Contractor shall comply with Reclamation's "Construction Safety Standards" as well as all other applicable safety and health standards and regulations. In the event of conflict, the more stringent standard shall apply.

f. Concrete preparation. - The Contractor shall prepare all concrete surfaces and foundations for PAC application. Concrete surface preparation shall be in accordance with subparagraph 3.6.f.

For underwater repairs, high-pressure water jetting shall be the normal method for concrete removal and surface scarification. Low-pressure water jetting will be allowed for cleanup immediately before placing PAC.

In underwater construction where contamination is known or suspected to exist, the water shall be sampled and tested to determine the degree of contamination and its possible influence on the quality of concrete. Where moderate contamination is present, concrete surfaces shall be cleaned within 2 days prior to placing aggregate and grouting. If contaminants are present in such quantity or are of such character that harmful effects cannot be eliminated or controlled, preplaced aggregate concrete shall not be used.

All loose, fine material shall be removed from the placement insofar as possible before placement of coarse aggregate to prevent subsequent coating of the aggregate or filling of voids.

g. Application.

(1) General. - Application of PAC shall include construction and placement of formwork and the grout injection system, placement of aggregate, injection of grout, finishing, and curing of PAC.

(2) Equipment. - The grout mixing, pumping, and injection system shall be furnished by the Contractor.

The grout injection system shall be designed to deliver and inject grout into the preplaced aggregate, to provide a means for determining the grout elevations within the aggregate mass, and to provide vents in enclosed forms for water and air to escape. The injection system shall have a bypass for returning grout to an agitating tank.

Pumps shall be of a positive displacement type and be equipped with a pressure gauge on the outlet line to indicate any incipient line blockage. At least one extra pump shall be on standby to maintain continuous pumping operations. The pumps shall have quick-disconnecting fittings to the grout supply line.

Mixing and agitating equipment shall be sized to maintain a continuous, uninterrupted flow of grouting mortar for the duration of the PAC placement. The mixing plant shall be a high-speed centrifugal type and shall be equipped with an accurate water meter, reading cubic feet to tenths of a cubic foot. In addition to the grout mixer, a holdover mechanical agitator tank of similar volume as the mixer shall be provided. Suitable provisions shall be made for passing the grout through a U.S. Standard 2.36-mm (No. 8) sieve as it is discharged from the mixer.

The batching and mixing plant equipment shall accurately measure the amounts of cement, pozzolan, sand, admixtures, and water batched for grout. Inaccuracies in feeding and measuring during operation shall not exceed by individual weight plus or minus 1 percent for water; plus or minus 2 percent for cement, pozzolan, or sand; and plus or minus 3 percent for admixtures.

The length of delivery line shall be kept to a practicable minimum. Pipe sizes shall be designed so that during operation, the grout velocity ranges between 2 and 4 feet per second for delivery lines up to 300 feet, or at a pumping rate of about 1 cubic foot of grout per minute through a 1-inch-diameter pipe. Pipe sizes shall be approximately 1 inch in diameter, but may need to be increased in size for delivery lines longer than 300 feet to reduce pressures.

Grout insert pipes shall have a diameter of 3/4 to 1 inch and shall be placed vertically, horizontally, or at angles to inject grout at the proper location. Grout insert pipes shall be in sections about 5-1/2 feet in length for ease of withdrawal. For depths greater than 15 feet, grout insert pipes shall be flushed coupled. For depths less than 15 feet, standard pipe couplings may be used.

Connections between grout delivery lines and insert pipes shall have quick-disconnect fittings. Quick-disconnect fittings which reduce the cross section of the flow area shall not be used. Each insert pipe, or the end of the delivery line where it attaches to the insert pipe, shall be equipped with an individual valve to control or stop the flow of grout. Valves shall be of a quick-opening, plug type which can readily be cleaned.

For vertical and angled injection tube placements, sounding wells shall be used to determine the level of grout in the placement. Sounding wells shall consist of slotted pipe with a diameter of about 2 inches. A 1-inch-diameter float, weighted so that it will float on grout and sink in water (for underwater placements), shall be attached to a sounding line and float freely in the sounding well.

(3) Formwork. - Forms for PAC may be of wood, steel, or other materials suitable for conventional concrete. Wood forms or other materials which may swell or become damaged by submergence in water shall not be used for underwater repairs.

Joints and any entry holes for bolts, reinforcement, injection ports, vents, or injection wells shall be caulked to eliminate grout leakage.

Forms shall be designed to resist the lateral pressure exerted by aggregates during and after placing, and to resist full hydraulic pressure of the concrete throughout placing until initial setting has begun.

Form vibrators for consolidation shall be mounted so that vibration does not loosen bolts and joints which may lead to grout leakage or failure. Form vibrators shall be mounted on ribs or stiffeners attached to the sheathing to effectively transmit vibration to the concrete.

All forms shall be coated with a suitable bond breaker for ease of removal without damaging concrete. For underwater repairs, the bond breaker shall be selected so that it does not wash off the forms during submergence. Formwork, injection tubing, inspection wells, and other equipment shall be protected from damage by aggregates during placing.

Reinforcing steel shall be installed during construction of formwork and securely held in place during placement of aggregate and injection of grout.

(4) Grout pipe system. - The grout pipe system shall be furnished by the Contractor and shall consist of a series of regularly spaced injection tubes with outlets beginning at the bottom and continuing to the top of the compacted aggregates. Observation wells shall be spaced at regular intervals between the injection tubes. Vent pipes shall be used in forms that contain restricted or irregular spaces where water or air may be entrapped by the rising grout surface, such as blockouts or embedment work.

The grout pipe system shall be designed to inject grout beginning at the lowest point in the PAC placement and continue to raise the grout level within the mass by selectively withdrawing the pipes and switching to other pipes to maintain the grout at a gently sloping to nearly horizontal level. The grout pipe system shall be coded to clearly identify the location of the outlet of the pipe supplying grout and the order of supplying grout to the pipes.

The spacing of grout insert pipes shall be between 4 and 12 feet and should average approximately 6 feet. The outlet of grout insert pipes shall begin not more than 6 inches above the bottom of the aggregate mass. Rows of horizontal pipes should be not more than 6 inches above the next lower row of pipes.

As a guide for layout of insert pipes, it can be assumed that the grout surface will have a 1:4 (vertical to horizontal) slope in the dry and a l:6 slope under water.

For vertical and inclined injection systems, sounding wells shall be spaced to observe the level of grout. The ratio of number of sounding wells to insert pipes shall be between 1:4 and not less than 1:10. Sounding wells shall be placed vertically or near vertically.

The delivery line shall consist of a single pipeline extending from the pump to the insert pipe equipped with a valve, or to a wye branching to two insert pipes equipped with valves at the beginning of the wye and at both outlets. A manifold system in which more than one grout insert is operative at the same time shall not be used.

(5) Aggregate preparation and placement. - Coarse aggregate shall be washed and screened immediately before placing in the forms. If more than one size of coarse aggregate is used, the aggregate shall be batched and mixed in the proper proportions or discharged at proportional rates onto a vibrating deck or revolving wash screens.

Coarse aggregate shall be transported to the forms by buckets, conveyors, or other approved methods. Coarse aggregates shall be dumped as close as possible to their final location. A flexible rubber elephant trunk (tremie) shall be used to limit free fall to less than 5 feet to minimize segregation and breakage of aggregate. For large placements, a gated pipe with a diameter at least four times the MSA shall be used. The pipe shall be gradually filled and lowered toward the point of placement, and after the pipe is completely filled at the upper end, aggregate shall be discharged from the lower gate. Aggregate shall not be discharged through an unfilled or partially filled pipe.

Coarse aggregate shall be dumped and spread in nearly horizontal lifts, each lift not to exceed 1 foot in height. Around closely spaced embedded items, such as reinforcing steel, conduits, and blockouts, and in more difficult placements where high density and exceptional homogeneity of concrete are desired, the lift height shall be limited to no more than 4 inches and may have to be placed by hand. Vehicular traffic shall not be permitted on top of preplaced coarse aggregate, with the exception of small skips or loaders and only with approval of the Contracting Officer. This equipment shall have rubber tires and be cleaned of any loose debris or substances that may contaminate aggregates or interfere with grout travel during injection.

Although coarse aggregate shall be completely washed prior to placing it shall not be flushed with water in the forms for the purpose of washing.

If water is used for the purpose of precooling aggregate or to provide lubrication for grout, the water shall be injected through the preplaced grout insert pipes rather than on top of the aggregates.

(6) Grout injection. - Injection shall begin at the lowest insert pipe point within the form and continue to raise the level of grout evenly to the top of the mass of aggregate. The injection process shall raise the level of grout approximately 18 to 24 inches above the outlet of the insert pipe before withdrawing of that pipe begins. Thereafter, the level of grout shall remain a minimum of 12 inches above the outlet of the insert pipe until the injection is completed.

Grouting shall proceed at only one insert pipe at a time. If a wye or manifold system is used, the system shall be equipped with individual valves to control the flow to each insert pipe.

Before the insert pipe is withdrawn, the valve at the pipe inlet shall be shut off. The delivery pipe may then be disconnected to inject at other locations.

When injection insert pipes are placed horizontally, the process shall begin at the lowest insert pipe. Adjacent insert pipes shall have valves opened both alongside and above the pipe being injected. When grout begins to flow out of these pipes, they shall be shut off and grouting continued so that the adjacent pipes are completely submerged. The initial pipe shall then be shut and the process shall be repeated, traveling in a horizontal direction before proceeding to the upper row.

Grout shall not be allowed to set up in the insert pipes between injections. If the injection process is expected to continue for an extended period, a suitable retarding admixture shall be used in the grout. Vertical insert pipes may be rodded to remove grout prior to reinjection; however, insert pipes shall not be cleaned by injecting water through them.

The rate of grout rise and rate of grout injection shall be controlled within the form so that excessive form pressures are not created and so that grout does not cascade within the mass. This is particularly important when grouting under water to avoid sand streaks and honeycombing within the mass.

When grouting around embedded items and particularly under flat surfaces or recessed areas, the grout shall be injected until good quality grout is forced from vent pipes. Good quality grout shall be grout that is not diluted and free from sand, silt, trash, and other items. The rate of flow of grout and grout injection pressures shall be closely monitored in enclosed locations to avoid form failure.

Form vibration shall be used to consolidate grout and remove entrapped air pockets adjacent to form surfaces. Excessive form vibration which causes sand streaking shall not be done. Internal vibration shall not be used for consolidation of the aggregate-grout mixture, but may be used for topping off unformed surfaces.

Unplanned construction joints shall not be used without approval from the Contracting Officer. If a breakdown occurs that stops placement, the grout insert tubes shall be withdrawn, and the grout surface shall be considered a cold joint. Cold joints shall be treated by first removing coarse aggregate down to the joint surface, removing aggregate and poor-quality mortar, and then cleaning the joint surface by approved methods, taking care not to undercut exposed aggregates.

h. Curing. - Curing and protection of PAC shall be in accordance with subparagraph 3.6.h.

3.5 SHOTCRETE

a. General. - Shotcrete is defined as pneumatically applied concrete or mortar placed directly onto a surface. The shotcrete shall be composed of water, cementitious materials, sand, coarse aggregate, steel fibers (if specified), and admixtures, and shall be placed by either the dry-mix or wet-mix process as specified herein.

The dry-mix process shall consist of thoroughly mixing the solid materials; feeding these materials into a mechanical feeder or gun; carrying the materials by compressed air through a hose to a special nozzle; introducing the water and intimately mixing it with the other ingredients at the nozzle; and then jetting the mixture from the nozzle at high velocity onto the surface to receive the shotcrete.

The wet-mix process shall consist of thoroughly mixing all the ingredients with the exception of the accelerating admixture, if used; feeding the mixture into the delivery equipment; delivering the mixture by positive displacement or compressed air to the nozzle; and then jetting the mixture from the nozzle at high velocity onto the surface to receive the shotcrete.

The equipment used by the Contractor for mixing and applying shotcrete shall be capable of handling and applying shotcrete containing the specified maximum-size coarse aggregate. All equipment, including mixers, hoses, nozzles, nozzle liners, air- and water-pressure gauges, and gaskets, shall be maintained in clean and proper operating condition satisfactory to the Contracting Officer.

b. Submittals. - The Contractor shall submit for approval to the Contracting Officer a proposed specific operating procedure including a hazard analysis for all shotcrete operations. The specific operating procedure shall include such things as engineering controls, protective clothing, eye protection, respiratory protection, and air sampling as necessary to check the effectiveness of the control program.

The Contractor shall submit the specimens extracted from panels fabricated for preapplication testing.

The Contractor shall submit test specimens of fresh and hardened concrete from locations directed by the Contracting Officer.

c. Quality assurance. - Quality assurance shall be in accordance with paragraph 1.4 and these specifications. The Government will perform all testing of fresh and hardened shotcrete. The Contractor shall obtain specimens from locations specified by the Government. The compressive strength of the shotcrete will be determined through the medium of tests of 3- by 3-inch cores or 3-inch cubes. The average compressive strength of specimens taken from a shotcrete application shall be not less than:

(1) Four thousand pounds per square inch at 28 days' age.

(2) Six hundred pounds per square inch at 8 hours' age. This will be determined from 3-inch cubes extracted from test panels.

Adjustments shall be made as directed by the Contracting Officer to obtain shotcrete having suitable impermeability, strength, density, and durability. Suitable strength is that which will ensure that 80 percent of all test specimens exceed or equal the average strength as specified above.

(3) Preapplication testing of shotcrete and nozzlemen. - No shotcrete shall be applied to the work until preapplication testing indicates that the nozzleman is qualified and the proposed shotcrete mixture meets the specified compressive strength. The Contractor shall allow adequate lead time for fabricating of test panels and testing shotcrete specimens. Furthermore, the Contractor is encouraged to fabricate panels for several mixtures since failure of a single mixture to meet specified strength requirements could delay accomplishment of other work.

(a) Shotcrete mixture. - At least 30 days prior to application of shotcrete to the work, the Contractor shall fabricate two test panels for each mixture to be used for vertical and overhead positions of application.

Application of shotcrete to test panels may be accomplished at locations other than the construction site provided:

(aa) Equipment used for fabricating test panels is identical to that to be used in application.

(bb) The materials used in fabricating test panels are from the same sources as those to be used in application and meet all specifications requirements.

(cc) Application is made in the presence of the Contracting Officer by a nozzleman who will later apply the shotcrete to the work.

Test panels shall be fabricated by applying shotcrete in one application not less than 4 inches thick to a panel form made of plywood or other suitable material.

The panel form to be used for vertical and overhead applications shall be either of two types as follows:

(dd) Open ended on at least two sides with 90E edges on enclosed sides. The minimum size of this open-ended panel shall be 18 inches square.

(ee) Enclosed on all four sides with members that taper outward in a manner that prevents the accumulation of rebound at edges and corners while allowing a shotcrete thickness of not less than 4 inches over the entire flat area of the panel. The minimum size of the center flat area of panels enclosed by tapered edges shall be 15 inches square.

Panels should be stiffened and weighted sufficiently to provide rigid surfaces against which the shotcrete can be applied. The panels shall contain the same type of reinforcement as to be used in construction to indicate whether sound shotcrete is obtained without shadowing behind the reinforcement.

After fabrication, the panel shall, except when test specimens are being obtained, be covered and sealed with polyethylene sheeting or shall be cured by any other approved method that will prevent loss of moisture.

The Contractor shall provide all necessary equipment and shall obtain 3-inch cubes from the test panels for testing the compressive strength at 8 hours' age and shall obtain 3-inch cubes or 3-inch-diameter cores from test panels for testing the compressive strength at 28 days' age.

All core drilling and saw cutting of cubes shall be performed in a workmanlike manner by competent and experienced workmen. Test specimens shall be extracted at the latest time, satisfactory to the Contracting Officer, that the specimens can be delivered by the Contractor to the Government for testing at the specified age. At least five specimens shall be obtained from each of the panels for each mixture being verified. Extreme care shall be taken in drilling cores or cutting cubes to obtain specimens satisfactory to the Contracting Officer.

Cores shall be 3 inches in diameter, drilled the full depth of the shotcrete; they shall be straight, sound, of uniform diameter, and of sufficient length for subsequent trimming by the Contractor to produce a right cylinder with an L/D ratio of 1.0 plus or minus 0.03.

Cubes shall be cut full depth of the shotcrete, shall be sound, and shall have six uniform square sides of 3-inch length plus or minus

0.05 inch.

Immediately after extraction, test specimens shall be individually wrapped and sealed in polyethylene bags or covered and sealed by any other approved means to prevent loss of moisture. Each test specimen shall be properly marked for identification.

Each set of test specimens shall be delivered without delay to the project laboratory, or other location approved by the Contracting Officer, for testing at the specified age.

(b) Shotcrete nozzleman. - The nozzleman who applies shotcrete shall be certified with the materials and equipment to be used for the work. Certification shall be in accordance with ACI 506.3R with the following limitations:

(aa) The certification examination will be conducted by authorized representative of the Contracting Officer.

(bb) The examination will consist of an oral test and a field workmanship demonstration test.

(cc) The test panels shall be a minimum of 18 inches square and 4 inches deep. The sides may have beveled edge forms (45E angle out to reduce the entrapment of rebound in the corners).

(dd) Test specimens shall be of the size and shape specified for quality control in these specifications.

d. Materials.

(1) Portland cement. - The cementitious materials in shotcrete shall comply with subparagraph 3.6.d.(1), with the exception that type III cement may be approved for use if sulfate conditions do not exist.

(2) Water. - Water shall be in accordance with subparagraph 3.6.d.(4).

(3) Sand and coarse aggregate. - Except as hereinafter provided for coarse aggregate grading, the sand and coarse aggregate shall be in accordance with subparagraph 3.6.d.(5). The maximum-size coarse aggregate shall be no larger than 3/8 inch. No material retained on the 3/8-inch sieve shall be permitted. Only 3 percent significant undersize aggregate material that will pass a 4.75-mm (No. 4) U.S. Standard sieve will be permitted.

(4) Admixtures. - Admixtures shall be in accordance with subparagraph 3.6.d.(3).

(a) Accelerator. - The Contractor may use an accelerating admixture in shotcrete.

(b) Air-entraining admixture. - The amount of air-entraining admixture used for the wet-mix process shall be that amount necessary to effect a total air content in the shotcrete, prior to application, of 7 percent plus or minus 1 percent by volume of shotcrete.

(5) Steel fibers. - Where directed by the Contracting Officer, the Contractor shall furnish steel fibers for reinforcement. The amount of steel fibers used shall be 90 pounds of fiber per cubic yard of shotcrete. Steel fibers shall be carbon steel deformed type I (cold drawn wire) or type II (cut sheet) to conform to the requirements of ASTM A 820. Length of steel fiber shall be 3/4-inch minimum to 1-1/4-inch maximum.