Non-motorized Trail Maintenance IDIQ Performance Requirement Summary.doc

DOC document 35 KB Posted

Attached to
RECOVERY - IDIQ for Trails Maintenance on the Chattahoochee-Oconee National Forests in Georgia
Solicitation number
AG-4419-S-10-0131
Issued by

About this file

Performance Requirements Summary

View the file

Other files

File Type Posted
SF 1449 AG-4419-S-10-0131.pdf PDF
SF 1449 AG-4419-S-10-0131.pdf PDF
Non-motorized Trails Maintenance IDIQ Q and A.docx DOCX document
Statement of Work.docx DOCX document
Drawings.pdf PDF
MINI_IDIQ.docx DOCX document
Lake Conssauga Trails.doc DOC document
74-1218_sca.txt TXT text file
Copy of Attachment 2 Smith Creek T2.docx DOCX document
State of Georgia.pdf PDF
Copy of Attachment 3 Lake Conasauga T2.docx DOCX document
smithcreekmap_stim1_09.doc DOC document
52.212-5 ARRA.doc DOC document
Copy of Attachment 1 Aska T2.docx DOCX document
Aska Trail Area Pg 2.pdf PDF
Non-motorized Trail maintenance IDIQ Pay Items.doc DOC document
Design Parameters for Non-Motorized Trails.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY

Requirement
Quality Standards
Acceptable Quality Level
Means of Measurement
Incentives/Disincentives
Trail Restoration
Trail Tread is firm, smooth and maintained at appropriate width based on Design Parameters and as stated in the task order.

Target cross slope is consistent with Design Parameters and as stated in the task order.

Protrusions are allowed or removed based on Design Parameters and as stated in the task order.

Obstacles are allowed or removed based on Design Parameters and as stated in the task order.

For all tasks:

100% to standard; no deviation For all tasks:

Visual walk-through, random inspection by COR or Inspector.

For all tasks:

One rework allowed, at no cost to the Government, if standard is not met.

Additional reworks at Contractors expense, plus payment of actual costs incurred by the Government for additional reworks (e.g., inspection costs).

Past performance report, at the end of the contract(interim at the option of the Government)

Drainage
Existing drainage structures (waterbars, grade dips, etc.) are cleared of debris and sediment. Drainage is reshaped as needed in order to function properly.
Slide Maintenance
Slide Maintenance- The trailbed finish shall be uniform, firm, and with proper drainage.
Logging Out
Removal of brush, logs, and down trees.

Clearing is maintained according to Design Parameters and as stated in the task order.

Hazard Tree Removal
Trailway is clear of fallen, dead, or leaning hazardous trees. No trees marked for removal remain
Closing Non-system Trails
Non-system (user created) trails are made unusable.
Silt Fence
Silt Fence is Properly installed, maintained, and retaining erosion debris.

If not properly installed and maintained, the contractor will not be paid for the item and may not be awarded another task order.

Bridge Construction
Bridges are constructed as specified in the contract requirements and according to drawings.
Bridge Restoration
Bridges are restored or installed as staked on the ground and are safe to use.
Seeding and Mulching
The seeding, mulch, and fertilizers are applied at the rates and mixtures specified in writing and provided by the COR.

If the incorrect mixtures are applied, the Contractor will not be paid for the application and will have reseed, fertilize and mulch with the correct mixtures and rates at his own expense. The Contractor may not be awarded another task order.

File details come from the government source that posted it. Updated .