The file's text, extracted by GovTribe without its formatting.
FOLLOWING ARE SCHEDULES OF TYPICAL ITEMS WHICH WILL BE PRICED ON SUBSEQUENT TASK ORDERS (No pricing required at this time. Schedule included for information only)
PAY ITEMS - NON-WILDERNESS TRAIL (Hiker/Pedestrian Designed Use)
| Item Number |
| Item Description |
| Method of Measurement |
| TR1 |
| Trail Restoration 0” – 12” |
| Foot |
| TR2 |
| Trail Restoration 6” – 18” |
| Foot |
| TR3 |
| Trail Restoration 18” – 36” |
| Foot |
| TR4 |
| Trail Restoration 24” – 60” |
| Foot |
| S1 |
| Slide Maintenance, 12” – 36” trail width |
| Foot |
| S2 |
| Slide Maintenance, 58” – 60” trail width |
| Foot |
| HT |
| Hazard Tree Removal |
| Each |
| SM |
| Seeding and Mulching |
| Acre |
| BC1 |
| Bridge Construction |
| Foot |
| NS |
| Non System Trail Closing |
| Foot |
| BR |
| Bridge Restoration |
| Each |
PAY ITEMS - NON-WILDERNESS TRAIL (Pack/Saddle Designed Use)
| Item Number |
| Item Description |
| Method of Measurement |
| TR1 |
| Trail Restoration 0” – 12” |
| Foot |
| TR2 |
| Trail Restoration 6” – 18” |
| Foot |
| TR3 |
| Trail Restoration 18” – 36” |
| Foot |
| TR4 |
| Trail Restoration 24” – 60” |
| Foot |
| S1 |
| Slide Maintenance, 12” – 36” trail width |
| Foot |
| S2 |
| Slide Maintenance, 58” – 60” trail width |
| Foot |
| HT |
| Hazard Tree Removal |
| Each |
| SM |
| Seeding and Mulching |
| Acre |
| BC1 |
| Bridge Construction |
| Foot |
| NS |
| Non System Trail Closing |
| Foot |
| BR |
| Bridge Restoration |
| Each |
PAY ITEMS - NON-WILDERNESS TRAIL (Bicycle Designed Use)
| Item Number |
| Item Description |
| Method of Measurement |
| TR1 |
| Trail Restoration 0” – 12” |
| Foot |
| TR2 |
| Trail Restoration 6” – 18” |
| Foot |
| TR3 |
| Trail Restoration 18” – 36” |
| Foot |
| TR4 |
| Trail Restoration 24” – 60” |
| Foot |
| S1 |
| Slide Maintenance, 12” – 36” trail width |
| Foot |
| S2 |
| Slide Maintenance, 58” – 60” trail width |
| Foot |
| HT |
| Hazard Tree Removal |
| Each |
| SM |
| Seeding and Mulching |
| Acre |
| BC1 |
| Bridge Construction |
| Foot |
| NS |
| Non System Trail Closing |
| Foot |
| BR |
| Bridge Restoration |
| Each |
PAY ITEMS - WILDERNESS TRAILS
| Item Number |
| Item Description |
| Method of Measurement |
| TRW |
| Wilderness Trail Restoration |
| Foot |
| SW |
| Slide Maintenance, Wilderness trail |
| Foot |
| WHT |
| Hazard Tree Removal |
| Each |
| WSM |
| Wilderness Seeding and Mulching |
| Acre |
| WBC |
| Wilderness Bridge Construction |
| Foot |
| WBR |
| Wilderness Bridge Restoration |
| Foot |
| WNS |
| Wilderness Non-system Trail Closing |
| Foot |