Non-motorized Trail maintenance IDIQ Pay Items.doc

DOC document 77 KB Posted

Attached to
RECOVERY - IDIQ for Trails Maintenance on the Chattahoochee-Oconee National Forests in Georgia
Solicitation number
AG-4419-S-10-0131
Issued by

About this file

Sample pay items

View the file

Other files

File Type Posted
SF 1449 AG-4419-S-10-0131.pdf PDF
SF 1449 AG-4419-S-10-0131.pdf PDF
Non-motorized Trails Maintenance IDIQ Q and A.docx DOCX document
Statement of Work.docx DOCX document
Drawings.pdf PDF
MINI_IDIQ.docx DOCX document
Lake Conssauga Trails.doc DOC document
74-1218_sca.txt TXT text file
Copy of Attachment 2 Smith Creek T2.docx DOCX document
State of Georgia.pdf PDF
Copy of Attachment 3 Lake Conasauga T2.docx DOCX document
Non-motorized Trail Maintenance IDIQ Performance Requirement Summary.doc DOC document
smithcreekmap_stim1_09.doc DOC document
52.212-5 ARRA.doc DOC document
Copy of Attachment 1 Aska T2.docx DOCX document
Aska Trail Area Pg 2.pdf PDF
Design Parameters for Non-Motorized Trails.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOLLOWING ARE SCHEDULES OF TYPICAL ITEMS WHICH WILL BE PRICED ON SUBSEQUENT TASK ORDERS (No pricing required at this time. Schedule included for information only)

PAY ITEMS - NON-WILDERNESS TRAIL (Hiker/Pedestrian Designed Use)

Item Number
Item Description
Method of Measurement
M1
Mobilization
LSQ
TR1
Trail Restoration 0” – 12”
Foot
TR2
Trail Restoration 6” – 18”
Foot
TR3
Trail Restoration 18” – 36”
Foot
TR4
Trail Restoration 24” – 60”
Foot
S1
Slide Maintenance, 12” – 36” trail width
Foot
S2
Slide Maintenance, 58” – 60” trail width
Foot
D1
Drainage Dip
Each
D2
Waterbars
Each
D3
Clean Culvert
Each
D4
Clean Ditches
Foot
D5
Rock Spillway
CY
LO
Logging Out
Foot
HT
Hazard Tree Removal
Each
SF
Silt Fence
Foot
SM
Seeding and Mulching
Acre
BC1
Bridge Construction
Foot
NS
Non System Trail Closing
Foot
BR
Bridge Restoration
Each

PAY ITEMS - NON-WILDERNESS TRAIL (Pack/Saddle Designed Use)

Item Number
Item Description
Method of Measurement
M1
Mobilization
LSQ
TR1
Trail Restoration 0” – 12”
Foot
TR2
Trail Restoration 6” – 18”
Foot
TR3
Trail Restoration 18” – 36”
Foot
TR4
Trail Restoration 24” – 60”
Foot
S1
Slide Maintenance, 12” – 36” trail width
Foot
S2
Slide Maintenance, 58” – 60” trail width
Foot
D1
Drainage Dip
Each
D2
Waterbars
Each
D3
Clean Culvert
Each
D4
Clean Ditches
Foot
D5
Rock Spillway
CY
LO
Logging Out
Foot
HT
Hazard Tree Removal
Each
SF
Silt Fence
Foot
SM
Seeding and Mulching
Acre
BC1
Bridge Construction
Foot
NS
Non System Trail Closing
Foot
BR
Bridge Restoration
Each

PAY ITEMS - NON-WILDERNESS TRAIL (Bicycle Designed Use)

Item Number
Item Description
Method of Measurement
M1
Mobilization
LSQ
TR1
Trail Restoration 0” – 12”
Foot
TR2
Trail Restoration 6” – 18”
Foot
TR3
Trail Restoration 18” – 36”
Foot
TR4
Trail Restoration 24” – 60”
Foot
S1
Slide Maintenance, 12” – 36” trail width
Foot
S2
Slide Maintenance, 58” – 60” trail width
Foot
D1
Drainage Dip
Each
D2
Waterbars
Each
D3
Clean Culvert
Each
D4
Clean Ditches
Foot
D5
Rock Spillway
CY
LO
Logging Out
Foot
HT
Hazard Tree Removal
Each
SF
Silt Fence
Foot
SM
Seeding and Mulching
Acre
BC1
Bridge Construction
Foot
NS
Non System Trail Closing
Foot
BR
Bridge Restoration
Each

PAY ITEMS - WILDERNESS TRAILS

Item Number
Item Description
Method of Measurement
M1
Mobilization
LSQ
TRW
Wilderness Trail Restoration
Foot
SW
Slide Maintenance, Wilderness trail
Foot
WD1
Drainage Dip
Each
WD2
Waterbars
Each
WLO
Logging Out
Acre
WHT
Hazard Tree Removal
Each
WSM
Wilderness Seeding and Mulching
Acre
WBC
Wilderness Bridge Construction
Foot
WBR
Wilderness Bridge Restoration
Foot
WNS
Wilderness Non-system Trail Closing
Foot

File details come from the government source that posted it. Updated .