Section B - Schedule of Items.doc

DOC document 35 KB Posted

Attached to
RECOVERY* Beard's Mountain Trail Bridge Stream Bank Stabilization, George Washington & Jefferson NF, Virginia
Solicitation number
AG-4419-S-10-0097
Issued by

About this file

Section B - Schedule of items

View the file

Other files

File Type Posted
SF30 - Amendment 1.pdf PDF
Attachment 4 - Supplemental Specifications.pdf PDF
Attachment 2 - Specifications.pdf PDF
Attachment 3 - Wage Determination.doc DOC document
Sections C thru M - Solicitation.doc DOC document
Attachement 1 - Summary of Specs and Drawings.doc DOC document
Section A - SSF1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Beard’s Mountain Trail Bridge Stream Bank Stabilization

B.1 SCHEDULE OF ITEMS

Bid Item 1

Pay Item Number
Description
Unit
Quantity
Unit Price
Total
25102
Placed Riprap, Class 5
Ton
760.00
$
$
30802
Roadway Aggregate, Compaction Method 1
Ton
60.00
$
$
62528
Seeding, Fertilizing, and Mulching, Dry Method
L.S.
1.00
$
$
63352
Sign (Including Post(s))
EA.
1.00
$
$
TOTAL (Bid Item 1):
$

File details come from the government source that posted it. Updated .