Section B - Schedule of Items.doc
DOC document 35 KB Posted
- Solicitation number
- AG-4419-S-10-0097
About this file
Section B - Schedule of items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 - Amendment 1.pdf | ||
| Attachment 4 - Supplemental Specifications.pdf | ||
| Attachment 2 - Specifications.pdf | ||
| Attachment 3 - Wage Determination.doc | DOC document | |
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachement 1 - Summary of Specs and Drawings.doc | DOC document | |
| Section A - SSF1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Beard’s Mountain Trail Bridge Stream Bank Stabilization
B.1 SCHEDULE OF ITEMS
Bid Item 1
| Pay Item Number |
| Description |
| Unit |
| Quantity |
| Unit Price |
| Total |
| 25102 |
| Placed Riprap, Class 5 |
| Ton |
| 760.00 |
| $ |
| $ |
| 30802 |
| Roadway Aggregate, Compaction Method 1 |
| Ton |
| 60.00 |
| $ |
| $ |
| 62528 |
| Seeding, Fertilizing, and Mulching, Dry Method |
| L.S. |
| 1.00 |
| $ |
| $ |
| 63352 |
| Sign (Including Post(s)) |
| EA. |
| 1.00 |
| $ |
| $ |
| TOTAL (Bid Item 1): |
| $ |