Attachement 1 - Summary of Specs and Drawings.doc
DOC document 24 KB Posted
- Solicitation number
- AG-4419-S-10-0097
About this file
Attachment 1 - Summary of Specs and Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 - Amendment 1.pdf | ||
| Attachment 4 - Supplemental Specifications.pdf | ||
| Attachment 2 - Specifications.pdf | ||
| Attachment 3 - Wage Determination.doc | DOC document | |
| Sections C thru M - Solicitation.doc | DOC document | |
| Section A - SSF1442.pdf | ||
| Section B - Schedule of Items.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF SPECIFICATIONS AND DRAWINGS
FOR CONSTRUCTION OF
BEARD’S MOUNTAIN TRAIL BRIDGE
STREAM BANK STABILIZATION
1. FEDERAL HIGHWAY ADMINISTRATION’S “STANDARD SPECIFICATIONS FOR CONSTRUCTION
OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03”
2. FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS
3.
DRAWINGS
SHEET
TITLE SHEET
LOCATION MAP
SUMMARY OF QUANTITIES/GENERAL NOTES
PLAN VIEW
TYPICAL SECTIONS
5 - 6
PROJECT CROSS SECTIONS
7 – 8
SIGN DETAIL
File details come from the government source that posted it. Updated .