Attachment 4 - Supplemental Specifications.pdf
PDF 2 MB Posted
- Solicitation number
- AG-4419-S-10-0097
About this file
Attachment 4 - Supplemental Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 - Amendment 1.pdf | ||
| Attachment 2 - Specifications.pdf | ||
| Attachment 3 - Wage Determination.doc | DOC document | |
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachement 1 - Summary of Specs and Drawings.doc | DOC document | |
| Section A - SSF1442.pdf | ||
| Section B - Schedule of Items.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENTAL SPECIFICATIONS
FOR
BEARD’S MOUNTAIN TRAIL BRIDGE
STREAM BANK STABILIZATION
Table of Contents
Table of Contents Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress 108 Delete
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions
Beard’s Mtn. Trail Bridge 1 of 19 Supplemental Specifications Stream Bank Stabilization
155 - Schedules for Construction Contracts
155 Delete 251 - Riprap
251.03 General
308 - Minor Crushed Aggregate 625 - Turf Establishment
625.03 General
Table 625-1 Item Type Lb/Acre
625.04 Preparing Seedbed
625.05 Watering
625.07 Seeding
(a) Dry method
625.08 Mulching
625.09 Protecting and Caring for Seeded Areas
633 - Permanent Traffic Control ……………………………………………………...…16
633.02 Material
633.03 General
633.05 Panels
705 - Rock
705.02 Riprap Rock
718 - Traffic Signing and Marking Material
718.02 Reserved
718.02 Protective Overlay Film and Edge Film
718.05 Aluminum Panels
Beard’s Mtn. Trail Bridge 2 of 19 Supplemental Specifications
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
Beard’s Mtn. Trail Bridge 3 of 19 Supplemental Specifications http://www.nist.gov/
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Beard’s Mtn. Trail Bridge 4 of 19 Supplemental Specifications
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
Beard’s Mtn. Trail Bridge 5 of 19 Supplemental Specifications
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Beard’s Mtn. Trail Bridge 6 of 19 Supplemental Specifications
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.01_nat_us_07_31_2007
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Beard’s Mtn. Trail Bridge 7 of 19 Supplemental Specifications
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site.
If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price.
Four methods of determining conformity and accepting work are described in Subsections
106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO
Beard’s Mtn. Trail Bridge 8 of 19 Supplemental Specifications accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
Beard’s Mtn. Trail Bridge 9 of 19 Supplemental Specifications
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
Beard’s Mtn. Trail Bridge 10 of 19 Supplemental Specifications
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
Beard’s Mtn. Trail Bridge 11 of 19 Supplemental Specifications
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
251 - Riprap
251.03_nat_us_08_05_2009
Construction Requirements
251.03 General.
Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.
251.08 Measurement.
Add the following:
Payment for excavation and embankment required for placement of riprap is indirectly included in the pay item for riprap.
308 - Minor Crushed Aggregate
308.00_01_us_10_11_2006
Delete section 308 in its entirety and replace with the following:
Description
308.01 This work consists of placing Government furnished aggregate or furnishing and placing crushed aggregate for bedding, backfill and roadway aggregate course.
Beard’s Mtn. Trail Bridge 12 of 19 Supplemental Specifications
Material
308.02 Conform to the following Subsections:
Crushed aggregate 703.06
Water 725.01
Construction Requirements
308.03 Preparing Surface. Prepare the roadway surface on which aggregate course is placed as shown on the plans.
308.04 Placing Crushed Aggregate.
(a) Roadway aggregate. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for compaction. Spread and shape the mixture on the prepared surface in a uniform layer.
Do not place the mixture in a layer exceeding 6 inches in compacted thickness. When more than one layer is necessary, compact each layer according to Subsection 308.05(a) before placing the next layer.
(b) Bedding and backfill aggregate. Place and shape the mixture in layers that, when compacted, do not exceed 6 inches in depth.
308.05 Compacting and Finishing Crushed Aggregate.
(a) Roadway aggregate. Compact using the methods below, specified in the Schedule of Items.
(1) Method 1. Operate equipment over the full width of spread aggregate.
(2) Method 2. Compact the aggregate by operating compaction equipment over the total width until visible deformation ceases. A minimum of three complete roller passes shall be made at a moisture content suitable for compaction.
(b) Bedding and backfill aggregate. Compact in 6 inch lifts by using a Forest Service approved mechanical compactor until no visible deformation is observed over the entire area of aggregate.
308.06 Acceptance. Crushed aggregate will be evaluated under Subsections 106.02 and
106.03. Furnish a production certification including gradation and quality properties for each source.
Construction of roadway aggregate courses will be evaluated under Subsections 106.02 and 106.04. Method 2 compaction will be evaluated under Section 106.04.
Placement of bedding and backfill aggregate will be evaluated under Subsection 106.02 and Section 209.
Preparation of the surfaces on which crushed aggregate is placed will be evaluated under Section 303 and 209 as applicable.
Beard’s Mtn. Trail Bridge 13 of 19 Supplemental Specifications
Measurement
308.07 Measure the Section 308 items listed in the bid schedule according to Subsection
109.02 and the following as applicable.
Measure crushed aggregate by the cubic yard in-place on the road.
Measure width horizontally to include the top of aggregate width including designed widenings. Measure the length horizontally along the centerline of the roadway.
Payment
308.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 308 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
625 - Turf Establishment
625.03_0808_us_04_20_2005
625.03 General.
Delete the subsection and add the following:
Apply turf establishment uniformly to finished slopes, ditches, and other designated areas within 14 days after completion of construction. All disturbed areas shall be seeded and mulched either temporarily or permanently within 60 days of disturbance. The seed mixture and application rates for seed, fertilizer, lime, and mulch shall be as shown in Table 625-1. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, compacted, or not friable.
Table 625-1
Item Type Lb/Acre
Perennial Rye Grass (Manhatten, Pennfire, or Linn) 40
Kentucky Bluegrass 30
Creeping Red Fescue 20
Redtop 5
Seed
*Korean Lespedeza 5
Beard’s Mtn. Trail Bridge 14 of 19 Supplemental Specifications
*Red Clover 5
Annual Ryegrass 15
Fertilizer 10-10-10 (or equivalent nutrients) 1500
Lime Agricultural Limestone 3000
Wood or Cellulose Fiber, or Recycled Paper 2000 Mulch
Straw 4000
*To be inoculated per manufacturer.
When seeding from October 15 to March 1, 30 lbs/acre of Cereal Rye (Abruzzi) shall be added to the seed mixture.
The contractor shall notify the CO at least 24 hours prior to all seeding.
625.04_0808_us_04_21_2005
625.04 Preparing Seedbed.
Delete the subsection and add the following:
The areas to be seeded shall be finished as required by other applicable sections to the lines and grades described in the specifications and shown on the plans. Remove all weeds, sticks, stones, and other debris detrimental to application, growth, or maintenance of the turf. Areas that are damaged by erosion or other causes shall be restored. The surface soil shall be in a roughened condition favorable for germination and growth.
Ground agricultural limestone, when required, shall be applied uniformly either prior to or after soil preparation at the rate specified in Table 625-1.
625.05_nat_us_03_30_2005
625.05 Watering.
Delete the entire subsection 625.07_0808_us_04_21_2005
625.07 Seeding.
(a) Dry method.
Delete the entire subsection and add the following:
Mechanical seeders, seed drills, landscape seeders, cultipacker seeders, fertilizer spreaders, or other approved mechanical seeding equipment shall be used to apply the seed, or seed and fertilizer in the amounts and mixtures specified in Table 625-1. Hand
Beard’s Mtn. Trail Bridge 15 of 19 Supplemental Specifications operated seeding devices may be used when seed, fertilizer, and ground limestone are applied in dry form.
625.08_0808_us_04_21_2005
625.08 Mulching.
Delete the entire subsection and add the following:
(a) Dry method.
Uniformly apply mulch within 48 hours after seeding at the rate shown in Table 625-1.
Mulch may be applied with a mechanical spreader utilizing forced air to blow the mulch material onto the seeded areas or may be spread by hand. Mulch by hand areas inaccessible to mulching equipment.
The mulch may be anchored by methods or with binding material approved by the CO.
(b) Hydraulic method.
Uniformly apply mulch in a separate application from the seed at the rate shown in Table 625-1. Mulch shall be applied using hydraulic-type equipment according to Subsection 625.07(b). A continuous agitator action that keeps the materials in uniform suspension must be maintained throughout the distribution cycle. Mulch by hand areas inaccessible to mulching equipment.
625.09_0808_us_04_21_2005
625.09 Protecting and Caring for Seeded Areas.
Delete the entire subsection and add the following:
The contractor shall be responsible for protecting and caring for seeded areas until final acceptance of the work. Repair all damage to seeded areas by reseeding, refertilizing, and remulching. The contractor shall repair all damage to seeded areas caused by his construction operations or weather caused, without additional compensation.
633 - Permanent Traffic Control
633.02_nat_us_03_03_2005
633.02 Material.
Add the following subsections
Protective Overlay Film 718.02
Edge Film 718.02
Beard’s Mtn. Trail Bridge 16 of 19 Supplemental Specifications
633.03_nat_us_03_03_2005
633.03 General.
Delete the subsection and add the following:
Furnish traffic control devices and guide signs according to the MUTCD, approved USDA-FS and state supplements, the current edition of USDA-FS EM-7100-15 Sign and Poster Guidelines for the Forest Service, and Standard Highway Signs published by FHWA. Sign panels shall be aluminum or wood, fabricated in accordance with details shown on Attachments A, B, C, and D, contained within these supplemental specifications. The overall width of the sign panels shall be 42 inches. Submit the sign list for approval before ordering.
633.05_nat_us_03_03_2005
633.05 Panels.
Add the following:
Apply protective overlay film and top edge film as required and according to with manufacturer’s recommendations.
Delete the sentence: “Use antitheft fasteners where possible” in the fifth paragraph and replace it with the following: “For each sign panel use at least one antitheft fastener.”
705 - Rock
705.02_nat_us_08_05_2009
705.02 Riprap Rock.
Delete Table 705-1 and replace it with the following:
Beard’s Mtn. Trail Bridge 17 of 19 Supplemental Specifications
Gradation Requirements for Riprap
Class Percent of Rock by Mass
Mass (pounds)
Approximate Cubic Dimension b,c (inches)
20 22 to 33 6 to 8 30 11 to 22 5 to 6 40 1 to 11 2 to 5
10a 0 to 1 0 to 2 20 55 to 110 8 to 10 30 22 to 55 6 to 8 40 2 to 22 3 to 6
10a 0 to 2 0 to 3 20 220 to 330 14 to 16 30 110 to 220 10 to 14 40 11 to 110 5 to10
10a 0 to 11 0 to 5 20 550 to 770 18 to 20 30 220 to 570 14 to 18 40 22 to 220 6 to 14
10a 0 to 22 0 to 6 20 770 to1353 20 to 24 30 330 to 770 16 to 20 40 33 to 330 7 to16
4a
10a 0 to 33 0 to 7 20 1540 to 2200 26 to 28 30 1100 to 1540 20 to 26 40 55 to 1100 8 to 20
10a 0 to 55 0 to 8 20 1870 to 3520 28 to 34 30 1100 to 1870 22 to 28 40 110 to 1100 10 to 22
10a 0 to 110 0 to 10 20 4400 to 5940 35 to 39 30 2200 to 4400 28 to 35 40 220 to 2200 14 to 28
10a 0 to 220 0 to 14 20 7000 to 10000 42 to 47 30 4000 to 7000 35 to 42 40 400 to 4000 16 to 35
10a 0 to 400 0 to 16
(a) Furnish spall and rock fragments graded to provide a stable dense mass.
(b) The volume of a rock with these cubic dimensions has a mass approximately equal to the specified rock mass.
Beard’s Mtn. Trail Bridge 18 of 19 Supplemental Specifications
Beard’s Mtn. Trail Bridge 19 of 19 Supplemental Specifications
(c) Furnish rock with breadth and thickness at least one-third its length.
718 - Traffic Signing and Marking Material
718.02_nat_us_03_02_2005
718.02 Reserved.
Replace this section with the following:
718.02 Protective Overlay Film and Edge Film.
Protective overlay film will be a high performance flouropolymer film such as 3M Scotchlite Premium Protective Overlay Film Series 1160 or approved equal.
Edge film will be a pressure-sensitive, premium-quality, clear, ultraviolet-resistant, 3 inches wide vinyl film.
718.05_nat_us_08_05_2009
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.
| SuppSpecs.pdf |
| SUPPLEMENTAL SPECIFICATIONS |
| FOR |
| BEARD’S MOUNTAIN TRAIL BRIDGE |
| STREAM BANK STABILIZATION |
| Table of Contents |
| Preface |
| 101 - Terms, Format, and Definitions |
| 101.01 Meaning of Terms |
| 101.03 Abbreviations. |
| 101.04 Definitions. |
| 102 - Bid, Award, and Execution of Contract |
| 102 Bid, Award, and Execution of Contract |
| 103 - Scope of Work |
| Deletions |
| 104 - Control of Work |
| Deletions |
| 104.06 Use of Roads by Contractor |
| 105 - Control of Material |
| 105.02 Material Sources. |
| 105.02(a) Government-provided sources. |
| 105.05 Use of Material Found in the Work. |
| 106 - Acceptance of Work |
| 106.01 Conformity with Contract Requirements. |
| 106.07 Delete |
| 107 - Legal Relations and Responsibility to the Public |
| 107.05 Responsibility for Damage Claims. |
| 107.06 Contractor’s Responsibility for Work. |
| 107.09 Legal Relationship of the Parties. |
| 107.10 Environmental Protection. |
| 108 - Prosecution and Progress |
| 108 Delete. |
| 109 - Measurement and Payment |
| 109 Deletions |
| 109.02 Measurement Terms and Definitions. |
| 155 - Schedules for Construction Contracts |
| 155 Delete. |
| 251 - Riprap |
| 251.03 General. |
| 308 - Minor Crushed Aggregate |
| 625 - Turf Establishment |
| 625.03 General. |
| Table 625-1 |
| Item |
| Type |
| Lb/Acre |
| 625.04 Preparing Seedbed. |
| 625.05 Watering. |
| 625.07 Seeding. |
| (a) Dry method. |
| 625.08 Mulching. |
| 625.09 Protecting and Caring for Seeded Areas. |
| 633 - Permanent Traffic Control |
| 633.02 Material. |
| 633.03 General. |
| 633.05 Panels. |
| 705 - Rock |
| 705.02 Riprap Rock. |
| 718 - Traffic Signing and Marking Material |
| 718.02 Reserved. |
| 718.02 Protective Overlay Film and Edge Film. |
| 718.05 Aluminum Panels |
| FS ARRA SIGN DETAILS ATTACH A-D |
| FS ARRA SIGN DETAILS ATTACHMENT A |
| FS ARRA SIGN DETAILS ATTACHMENT B |
| FS ARRA SIGN DETAILS ATTACHMENT C |
| FS ARRA SIGN DETAILS ATTACHMENT D |