AG-4419-S-10-0053

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309

1720 PEACHTREE ROAD NW

EROC EAST

US FOREST SERVICE

ATLANTA GA 30309

1720 PEACHTREE ROAD NW

EROC EAST

US FOREST SERVICE

ARRA-FS CIM12/08/2009000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/19/2009

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment to the solicitation is to clarify and include those items addressed at the pre-bid meeting and are hereby included into this solicitation.

All other terms and conditions remain unchanged

- Clarification - exposer on all shakes shall be 7.5" as stated in the specifications.

- All flashing shall be as specified in section 076200 sheet metal flashing and trim - Part

2 Products - Lead Coated Copper Sheet - ASTM B101, Class A - 20 oz.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

GARY S. BABER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-4419-S-10-0053/000001

- Delete all reference to ice & water shield or membrane and ventilated mesh material underlayment from the specifications and drawings within this contract.

- No masonry will be required on this contract with the exception of tie backing of the flashing against the chimney, see detail sheet 7 of 7 of this contract.

- All chinking is to be removed from the Schencks

Office (inside and out) and replaced after building sills have been removed and replaced.

- Please delete typical detail C2/A5.1 and

A3/A5.1 from sheet 7 of 7 from the drawings, this details are no longs applicable to this contract.

- Clarification - due to the varying wood species on the Commissary porch sills to be replaced the wood to be used as a replacement shall be rough sawn white oak. Also the note on page 5 of 7 states to replace the 2x12 sill. This should be changed to state "Replace existing 2x12 , 2 x 6 and 1x4 trim boards on all three sides of the porch.

- Several questions came up regarding the availability of the type shakes specified - below is a suggested supplier for such product: Kolb

Contracting LLC,16545 Forest Pine

Wildwood, MO 63011-1875 636-458-5970

- Cedar Shakes for this project shall be graded by the Cedar Shake and Shingle Bureau.¿ www.cedarbureau.org

- At this time lab results regarding the chinking mixture on the Schenck's Office can not be provided.

*** All other terms and conditions remain unchanged ***

This project is funded in whole by the American

Recovery and Reinvestment Act (ARRA).

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)