page 2-5 continuation sheet for ag-4283-s-08-0022.doc

DOC document 60 KB Posted

Attached to
STEWARDSHIP PROJECT
Solicitation number
AG--4283-S-08-0022
Issued by

About this file

CONTINUATION TO AMENDMENT PAGES 2-5

View the file

Other files

File Type Posted
sf-30 ag4283s080022.rtf RTF text file
fs_6500_25.doc DOC document
Final Draft Appendix_B_Tree_measurement1_with_map FL.doc DOC document
COMMERCIAL ITEM STEWARDSHIP FL AG-4283-S-08-0022.doc DOC document
fs_6500_24.doc DOC document
General Decision Number Florida Road.doc DOC document
Appendix C FL Specs road maintenance.doc DOC document
Kerr ServiceWorkSpecs_update_7-9-08.doc DOC document
AG-4283-S-08-0022 WAGE RATES.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUATION SHEET OF AMENDMENT NO. 1 – AG-4283-S-08-0022

In the Appendix A ( service work), page 1

1. paragraph 110 General, in item 1 change

“up to 1.4 miles of spot surfacing temporary timber haul roads” to

“the placement of 500 cubic yards of clay for spot surfacing temporary timber haul roads”.

2. on page 2 , paragraph 2 of the service work, Cutting Small Pins. The second sentence, currently it reads as follows:

“Trees can be removed from the site, can be used as brush/slash material to close designation roads, or can be left in place”.

The change is incorporating the words “upon agreement, which”, inserted in this sentence as follows:

“Trees can be removed from the site, upon agreement, which, can be used as brush/slash material to close designation roads, or can be left in place”.

5. paragraph 120 Description and Location, item 1 of the chart under Task, remove the words “-as needed”. Then in next column, change the unit of measure from ”miles” to “yards”. Then in the next column, “Units”, change “Up to 1.4 miles” to “500”.

6. paragraph 210 Technical Instructions, In 1., the first sentence, “1. Spot surfacing: Contractor will apply spot surfacing to temporary timber haul…” change to “…..Contractor will apply a total of 500 cubic yards for spot surfacing on all temporary timber haul roads according to the Kerr Stewardship Work Map at the end of Appendix A.”.

On page 2 of appendix A, the last paragraph, which is #5.

7. The sentence “Post installation to close roads: Roads intersections designated on the map will be posted at intersections with roads open to the public.” Will be change to read, “Post installation to close roads: Roads intersections designated on the map will be posted at intersections with roads open to the public using non treated posts.”

And on the page 6,

8. The sentence, “Brush and logging slash will be scattered behind posts to discourage unauthorized vehicle use.” Need to change to, “Brush and logging slash will be scattered behind and on the outer sides of the posts to discourage unauthorized vehicle use intermittedly over the length of the roads”.

9. paragraph #7, the mulching.

The sentence reads, “ 7. Mulching: In the 100 foot zone west and south of FS Roads 11-13.5 and 316-4.2 all vegetation less than 3 feet in height will be mulched and left on site or removed from site.” Needs to be changed to “7. Mulching: In the 100 foot zone west and south of FS Roads 11-13.5 and 316-4.2 all vegetation less than 6 (six) inches at diameter (measured at 4 ½ feet above ground) and greater than 3 (three) feet in height will be mulched and left on site or removed from site.”

On page 2 of the solicitation, the chart needs to be modified to read the following:

The changes are in yellow.

Values of timber products removed to be applied at Flat Rates

SPECIES
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE OFFER
OFFER

(FLAT)

TOTAL OFFER

Pine
Posts
Upon agreement
CCF
$1.00
optional
Sand Pine
Sawtimber
54
CCF
$24.07
Pine
Pulpwood
523
CCF
$23.05

See Timber Removal Project Terms and Specifications in Appendix B.

In Appendix B, on page 2 in the Division AT section, the chart needs to be modified to read the following:

The changes are in yellow.

Division AT

Location and Area:

This Contract Area of
279
acres more or less is located in:
Compartment 73 of the Lake George Ranger

District of the Ocala National Forest in Marion County, Florida.

Volume Estimate and Utilization Standards

Species Group
Product
Estimated

Quantity * Unit of

Measure Minimum Specifications

Merchantable Tree
Piece Required to be Removed

Diameter Breast High (d.b.h.)

(inches) Number of Minimum Pieces per Tree Length (feet) Diameter Inside Bark at Small End (inches)

Sand Pine
Sawtimber
54
CCF
10.6
1.5
8
6.3
SYP
Pulpwood
523
CCF
5.0
2.0
5
3.5

Timber Subject to Agreement Under WO-KT-CT-1.1

SYP
Posts
Upon Agreement
CCF
3.0
1.0
6
2.3

Total Quantity

1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.

In the WO and region clauses section on page 9, this clause needs to be inserted before the KT-CT .3.5.2# - Designation by species and diameter and after the IT.5

Add to provisions :

KT-CT.1.1# – TIMBER SUBJECT TO AGREEMENT. (9/04) In addition, there is within Contract Area an unestimated quantity of:

Species
Product
Pine
Posts

that shall be Included Timber upon written agreement.

In appendix A the only additional change is on page 2 , paragraph 2 of the service work, Cutting Small Pins. The second sentence, currently it reads as follows:

“Trees can be removed from the site, can be used as brush/slash material to close designation roads, or can be left in place”.

The change is incorporating the words “upon agreement, which”, inserted in this sentence as follows:

“Trees can be removed from the site upon agreement, which can be used as brush/slash material to close designation roads, or can be left in place”.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.