General Decision Number Florida Road.doc

DOC document 38 KB Posted

Attached to
STEWARDSHIP PROJECT
Solicitation number
AG--4283-S-08-0022
Issued by

About this file

WAGE RATE DECISION

View the file

Other files

File Type Posted
page 2-5 continuation sheet for ag-4283-s-08-0022.doc DOC document
sf-30 ag4283s080022.rtf RTF text file
Appendix C FL Specs road maintenance.doc DOC document
Kerr ServiceWorkSpecs_update_7-9-08.doc DOC document
AG-4283-S-08-0022 WAGE RATES.doc DOC document
fs_6500_25.doc DOC document
Final Draft Appendix_B_Tree_measurement1_with_map FL.doc DOC document
COMMERCIAL ITEM STEWARDSHIP FL AG-4283-S-08-0022.doc DOC document
fs_6500_24.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: FL080038 02/08/2008

FL38

Superseded General Decision Number: FL20070038

State: Florida

Construction Types: Highway

Counties: Alachua, Bradford, Clay, Duval, Marion, Nassau, St

Johns and Volusia Counties in Florida.

EXCLUDING CAPE KENNEDY FLIGHT CENTER AND CAPE CANAVERAL AIR

FORCE STATION HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

02/08/2008

SUFL1993-011 08/01/1993

Rates Fringes

Bricklayer/Brickmason

.$ 11.63

Carpenter

$ 9.03

Concrete Finisher

$ 9.26

Electrician

.$ 14.45

Fence Erector

.$ 7.11

Form Setter

$ 8.32

Guardrail erector

.$ 10.46

Ironworkers:

Reinforcing

$ 11.70

Structural

$ 10.27

Laborers:

Air tool operator

.$ 8.56

Asphalt raker

.$ 6.49

Pipelayer

$ 10.15

Unskilled

$ 6.49

Painters:

Blaster

$ 12.16

Power equipment operators:

Asphalt Distributor

.$ 6.62

Asphalt paving machine

.$ 7.31

Asphalt screed

$ 6.88

Backhoe

.$ 9.60

Boom-Auger

$ 8.95

Bulldozer

$ 8.73

Concrete Curb Machine

.$ 8.42

Concrete Groover/Grinder

$ 9.88

Concrete joint saw

$ 10.15

Concrete Paving Finish

Machine

..$ 8.50

Concrete Pump

.$ 14.35

Crane, Derrick, or

Dragline

..$ 11.50

Earthmover

.$ 6.83

Forklift

.$ 6.87

Front End Loader

.$ 7.90

Gradall

.$ 9.63

Guardrail Post Driver

..$ 11.76

Kettleman

.$ 6.69

Mechanic

.$ 10.81

Milling Machine

...$ 8.50

Milling Machine Grade

Checker

.$ 7.64

Motor Grader

$ 9.96

Mulching Machine

.$ 6.60

Oiler, grease man

$ 7.48

Pavement Striping

Machine

$ 8.51

Paving Striping

Machine, Nozzleman

..$ 7.82

Piledriver

.$ 11.29

Piledriver leadsman

...$ 11.99

Power Subgrade Mixer

..$ 7.57

Pump Operator

$ 12.49

Rollers:

Finish

.$ 6.69

Rough

$ 6.49

Self-Prop. rubber tires

.$ 6.49

Scraper

...$ 8.69

Small Tool Op

...$ 6.86

Tractor, light

..$ 6.49

Trenching machine

$ 7.25

Widening Spreader

Machine

$ 7.25

Sign Erector

.$ 11.01

Traffic Controller

TRAFFIC CONTROL

SPECIALIST

$ 7.44

TRAFFIC SIGNALIZATION:

Installer

..$ 9.16

Mechanic

.$ 13.08

Truck drivers:

Lowboy

..$ 7.76

Multi-Rear Axle

.$ 6.61

Single Rear Axle

.$ 6.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .