VA13.pdf
PDF 25 KB Posted
- Attached to
- Warren Tract #49340 Culvert Replacement Federal contract opportunity
- Solicitation number
- AG-3395-S-09-0036
About this file
Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Short_Set.pdf | ||
| Solicitation_AG-3395-S-09-0036 Warren Tract Culvert.pdf | ||
| Plans.pdf | ||
| Specs.pdf | ||
| 1985RDSPECS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: VA080013 07/25/2008 VA13
Superseded General Decision Number: VA20070013
State: Virginia
Construction Type: Highway
Counties: Alleghany, Appomattox, Augusta, Bath, Bland, Buchanan, Buckingham, Buena Vista*, Carroll, Charlotte, Clifton
Forge*, Covington*, Craig, Cumberland, Dickenson, Floyd, Franklin, Frederick, Galax*, Giles, Grayson, Halifax, Harrisonburg*, Henry, Highland, Lee, Lexington*, Martinsville*, Montgomery, Nelson, Norton*, Page, Patrick, Prince Edward, Pulaski, Radford*, Rockbridge, Rockingham, Russell, Shenandoah, Smyth, South Boston*, Staunton*, Tazewell, Waynesboro*, Winchester*, Wise and Wythe Counties in Virginia.
*INDEPENDENT CITIES
HIGHWAY CONSTRUCTION PROJECTS (Excluding tunnels, building structures in rest area projects and railroad construction;
bascule, suspension and spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction and other major bridges)
Modification Number Publication Date
0 02/08/2008
1 07/25/2008
* SUVA1999-016 02/11/1999
Rates Fringes
Asbestos Worker/Heat and
Frost Insulator..................$ 10.95
BLASTER..........................$ 11.33
Carpenters:
Structure...................$ 9.99
Concrete Finisher................$ 10.13
Deckhand.........................$ 13.49
Electricians.....................$ 14.00
FENCE ERECTOR....................$ 8.50
Flagger..........................$ 6.75
Form Setter......................$ 12.39
Guardrail erector................$ 9.73
Laborers:
Asphalt Rakers..............$ 8.63
5/28/2009http://www.wdol.gov/wdol/scafiles/davisbacon/VA13.dvb
Construction Workers I
(Skilled Laborers)..........$ 8.12
Construction Workers II
(Laborers)..................$ 7.21
Landscape Workers...........$ 7.25
Pipelayers..................$ 8.95
Power Tool Operators........$ 7.94
MASON
Structure...................$ 9.00
Painter, Bridge..................$ 9.00
PAINTER..........................$ 10.81
Plumbers.........................$ 14.31
Power equipment operators:
Air Compressor Operators....$ 11.00
Asphalt Distributor
Operators...................$ 8.93
Asphalt Paver Operators.....$ 9.68
Backhoe Operators...........$ 10.14
Bulldozer Operators, Utility.....................$ 8.70
Bulldozer Operators.........$ 10.02
Concrete Finish Machine
Operators, Utility..........$ 10.88
Concrete Finish
Machine/Screed Operators
(Bridge)....................$ 10.50
Concrete Paving Machine
Operators...................$ 10.75
Concrete Pump Operators.....$ 8.33
Concrete Saw Operators......$ 8.25
Crane, Derrick, Dragline
Operators...................$ 11.52
Crusher Tender Operators....$ 10.35
Drill Operators.............$ 10.54
Excavator Operators.........$ 12.00
Front-End Loader Operators
2 yds. & Under.............$ 9.56
Over 2 yds.................$ 10.13
Fuel and Lubricant Service
Truck Drivers...............$ 7.50
Gradall Operators...........$ 14.00
Grade Checker...............$ 6.55
Hydro-Seeder Operators......$ 7.49
Log Skidder Operators.......$ 9.00
Mechanics...................$ 11.34
Mobile Mixer Operators......$ 10.30
Motor Grader Operators
Fine Grade.................$ 11.59
Rough Grade................$ 11.58
Oiler Greaser...............$ 8.00
Pavement Marker Operators...$ 8.88
Pavement Marking Truck
Operators...................$ 13.50
Pavement Planing
Groundmen..................$ 8.00
Operators..................$ 8.13
Pile Driver
Leadsman...................$ 9.00
Operators..................$ 9.88
Pipe Boring/Jacking
Machine Operators...........$ 8.50
Plant Operators.............$ 8.00
Roller Operators
Finish.....................$ 8.60
Rough......................$ 8.31
Scraper Pan Operators.......$ 9.45
Shot Blast Machine
Operators...................$ 8.00
Shovel Operators
2 yds. and Under...........$ 8.04
Over 2 yds.................$ 10.00
Slip-Form Paver Operators...$ 7.14
Slurry Seal Paver
Machine Operators..........$ 8.25
Truck Drivers..............$ 10.33
Stabilizer Operators........$ 10.00
Stone Spreader Operators....$ 9.67
Subgrade Machine Operators..$ 8.50
Tractor Operators
Crawlers...................$ 9.42
Utility....................$ 7.47
Transit Mix Truck Drivers...$ 9.75
Trenching Machine Operators.$ 8.73
Vacuum Machine Operators....$ 9.75
Reinforcing metal workers........$ 9.73
Sheet Metal Worker...............$ 8.90
SIGN ERECTOR.....................$ 8.50
Structural workers...............$ 13.25
TRAFFIC SIGNALIZATION:
Traffic Signal Installation
Maintainers.................$ 13.51
Truck drivers:
Heavy Duty..................$ 8.93
Multi-Rear Axle.............$ 8.65
Single Rear Axle............$ 8.40
Tandem Rear Axle............$ 8.60
WATERPROOFER.....................$ 7.28
Welder...........................$ 11.65
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .