1985RDSPECS.pdf

PDF 20 MB Posted

Attached to
Warren Tract #49340 Culvert Replacement Federal contract opportunity
Solicitation number
AG-3395-S-09-0036
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Forest Service Standard Specifications for Roads and Bridges (1985)

View the file

Other files for this federal contract opportunity

Other files attached to Warren Tract #49340 Culvert Replacement, newest first.
File Type Posted
Short_Set.pdf PDF
Solicitation_AG-3395-S-09-0036 Warren Tract Culvert.pdf PDF
Plans.pdf PDF
VA13.pdf PDF
Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

,J.,'.,c:~~~;.c ;'.; CONTENTS

J",'c ...

j' Preface. III cr., , 'V.i! SECTION 100-149 GENERAL SPECIFICATIONS. 1 :l '. ..

,j..':C .101 AbbrevIatIons. " 3;),' , 102 f " t .',1'" De 1 nIl ons 6 ~ 103 Intent of Contract. 12

104 Maintenance for Traffic. 13 105 Control of Materials. 14 106 Measurement & Payment. 17

SECTION 150-199 ENGINEERING. 21

160 Quality Control and Quantity Measurement. ..23 161 Quality Control and Quantity Measurement. ..25 170 Construction Staking Transit L-line. , 26 171 Construction Staking, Offset L-line 35 172 Construction Staking, Offset L-line 43 173 Construction Staking, Location Line. 50 174 Construction Staking, Bridges, and

Major Structures (Reserved). 53

SECTION 200 EARTHWORK. 55

201 Clearing & Grubbing. 57 202 Removal of Structures & Obstructions. 62 203 Excavation & Embankment. 64 204 Soil Erosion & Water Pollution Control 205 Overhaul. ., 73 205A Haul. ". 74 206 Structure Excavation. ; 75 206A Excavation for Culverts & Minor Structures..; 79 207 Developing Water Supply & Watering. 81 209 Sheathing. 82 210 Obliteration of Abandoned Roadways. 83 211 /Roadside Cleanup. 84 212 Compaction Equipment, Density Control

.Strips, & Nuclear Testing Devices. 85 299 Composite Road Construction. 87

SECTION 300 BASES. 89

304 Aggregate Base or Surface Course. 91 306 Reconditioning Existing Road. 95 308 Portland Cement Treated Base. 97

SECTION 400 BITUMINOUS PAVEMENTS. 99

401 Plant Mix Bituminous Pavements-General. ...10] 403 ,Hot Bituminous Pavement. 110 404 Cold Bituminous Pavement. 111 405 Road Mix Bituminous Pavement. 114 406 Hot Bituminous Plant Mix (Commercial Source) .118 407 Tack Coat. 120

:: 408 Prime Coat. 122

410 Bituminous Surface Treatment and Seal Coat.. 124 412 Dust Palliative Treatment. 128

SECTION 550 BRIDGE CONSTRUCTION. 131

551 Piling. 133 552 Structural Concrete. 143 553 Prestressed Concrete Structures. 171 553A Precast Concrete Structures. 178 554 Reinforcing Steel. 180, 555 Steel Structures. 182

556 Bridge Railing. 202

~ 7720-1001L, ~ge v April 1, 1985

557 Timber Structures. 205 558 Prefabricated Bridge Structures. 208 559 Log Structures. 210

SECTION 600 INCIDENTAL CONSTRUCTION. 213 }

601 Mobilization. 215 ' 602 Minor Concrete Structures. 216 603 Metal Pipe. 220 603A Concrete Pipe. ..io 224 603B Corrugated Polyethylene Pipe. 226 604 Manholes, Inlets, & Catch Basins. 228 605 Underdrains 230 606 Guardrail. 234 607 Fences, Gates, & Cattleguards 236 608 S i dewa 1 ks 239 609 Curb or Curb & Gutter. 241 610 Stone Masonry Structures. 245 611 Development of Pits & Quarries. 251 613 Reinforced Earth Walls. 253 614 Dallp-Proofing 257 615 Waterproofing. 258 616 Waterstops 262 617 Structural-Plate Pipe, Pipe Arches, & Arches. 263 617A Structural-Plate Long-Span Structures 618 Cleaning & Reconditioning Existing

Drainage Structures.. 269 619 Riprap. 271 621 Corrugated Metal Spi llways 278

-622 Paved Waterways. 280 623 Monuments & Markers. 283 624 Topsoi 1 i ng 284 625 Seeding & Mulching. 285 626 Trees, Shrubs, Vines, & Ground Cover. 288 629 Sodding. 291 '.. Y 630 Gabi ons 293 :: ;f 631 Bin Walls. 296 .

633 Signs. 299 634 Painted Traffic Markings. 302 637 Equipment Rental. 304 640 'Road Closure Devices. 308

SECTION 700 MATERIALS DETAILS. 311

701 Cement, Grout, & Mortar. 313 702 Bituminous Materials. 315 703 Aggrega t es 319 704 Masonry Uni t s 327 705 Joint Materials. 328 706 Concrete, Clay, Plastic, & Fiber Pipe 707 Metal Pipe. " 333 708 Paints. 336 709 Reinforcing Steel & Wire Rope. 343 710 Fence & Guardrail. 344 711 Concrete Curing Materials & Admixtures 712 Miscellaneous. 348 713 Roadside Improvement Materials. 353 715 Pil ing 358 716 Material for Timber Structures. 360 717 Structural Metal. 362 718 Sign Materials. 369 719 Flexible Downpipe 371 720 Geotextiles 373

EM 772o-100u" page vi

SECTION 100-149 GENERAL SPECIFICATIONS

EM 7720-100LL, page 1

_I ~' section 101 -Abbreviations

101.01 Whenever in these specifications, or in other contract documents, organizations 60 the following terms, or pronouns in place of them, are used, the j Standards intent and meaning shall be interpreted as follows. Reference to ! a specific standard or specification shall mean the latest edition or amendment in effect on date of invitation to bid.

AASHTO--American Association of state Highway and Transportation

Officials

ACI--American Concrete Institute

AISC--American Institute of Steel Construction

AISI--Aroerican Iron and Steel Institute

AITC--American Institute of Timber Construction

~" ANSI--American National Standards Institute t-' ...;, APA--AmerIcan Plywood AssocIatIon

,;: i API--American Petroleum Institute

.: .. f h . 1 .

" ASME--Amerlcan SocIety 0 Mec anIca EngIneers

ASTM--American Society for Testing and Material

ATCC--American Type Culture Collection

AWPA--American Wood Preservers Association

AWPB--American Wood Preservers Bureau

, ...,;0 AWS--AmerIcan WeldIng SocIety

AWWA--American Water Works Association

CFR--Code of Federal Regulations

; CRSI--Concrete Reinforcing Steel Institute

CS--Commercial Standard issued by U.S. Departroent of Commerce

DEMA--Diesel Engine Manufacturers Association

FAR--Federal Acquisition Regulation

FED SPEC. or FS--Federal Specifications

FSS--Federal Specifications and Standards

GSA--General services Administration

MIL--Military Specifications

-MSHA--Mine s~fety and He~:Lth Administration

MUTCD--Manual on Uniforro Traffic control Devices

NBFU--National Board of Fire Underwriters

,"; NBS--National Bureau of Standards i"J NEMA--National Electrical Manufacturers Association f, NESC--National Electrical Safety Code

EM 7720-100LL, page 3

NFPA--(Fire)--National Fire Protection Association

NFPA--(Forest)--National Forest Products Association "

NWMA--National Woodwork Manufacturers Association;~

OSHA--Occupational Safety and Health Administration

PCA--Portland Cement Association

PCI--Prestressed Concrete Institute

PS--Product Standard issued by the U.S. Department of Commerce

PTI--Post-Tensioning Institute

:,-:~... RIS--Redwood Inspection Service

SAE--Society of Automotive Engineers

SF--Standard Form

SSPC--Steel Structures painting Council

UL--Underwriter's Laboratories, Inc.

USASI--United States of America Standards Institute

WCLIB--West Coast Lumber Inspection Bureau

WWPA--Western Wood Products Association

101.02 ABBREVIATIONS

Pay Items & Pay Units Aluminum. AL.

Aspha 1 t ASP. ':

Barbed Wi re 13. w. J Bituminous Coated Corrugated Steel Pipe.. B.C.C.S.P. OR

B.C.C.S. PIPE

Cement. CEMT .

Cement Treated CEMT.-T.

Cement Treated Base. CTB Clearing & Grubbing. CLEAR & GRUB Compaction. CMPCT.

Concrete. CONC.

Corrugated Metal Pipe. CMP Corrugated Steel Pipe. C.S.P.

Corrugated Steel Pipe Arch. C.S.P. ARCH Cubi c Yard. C. Y .

Cubic Yard Mi Ie C. Y .M!.

Diameter. OIA.

Each. EA.

~mu 1 s i f i ed EMLSFD.

Erosion and Pollution Control. E&P CONTROL Fa br i ca t ed FABR.

Founda t i on FOUND.

Furni shed. FURN...,. ='" '"

,~~:::,.. Ga lIon. GAT..

c;;;::;:,o.'. Grade. GR.c. ...,. HeIght. AT.

High Strength. ~. STRENGTH Horizontal. HOR.

Hour. fiR.

Linear Foot. L.F.

Liquid. LIQ.

Load i ng LD.

Lump Sum. L. S .".

Material. MAT'L "

Max i mum. MAX. ;

Method. M. .iI

EM 7720-100LL, page 4 -; April 1, 1985

Mile. MI.

Minimum. MIN.

One Thousand Feet Board Measure. MFBM One Thousand Gallons. M.GALS.

One Thousand Gallons Mile. M.GALS.MI.

One Thousand Square Feet. M.S.F.

polyvinylchloride PVC Pounds. LBS.

Reflectorized REFLECT.

Sect ion. SEC.

Squa r e Foot. S. F .

Square Yard. s. y .

Station. STA.

Station Yard. STA. YD.

St ra nd s.

Structural. STRUCT.

Structural Steel. S. STEEL Stump. STMP Target Va 1 ue TV Thickness. TH.

Ton Mi 1 e T .M.

Tops and Li mbs T&L Utilization of Timber. UOT Vert i ca 1 VERT.

White. WH.

Width. w.

Wi th wi Without. w/o Woven wi re w. W.

Yellow. YE.

EM 7720-100LL, page 5

Section 102 -Definitions

Wherever in these specifications, or in other contract documents., the followIng terms, or pronouns in place of them, are used, the'} intent and meaning shall be interpreted as follows: ~

A~j~~tmen~ ~n C~~t;:~ct ;;ic~. "Adjustment in contract price" shall mean "equItable adJustment" as used in the Federal Acquisition Regulations, or "Construction Cost Adjustment" as Used in the Timber Sale Contract as applicable.

Arch Pipe. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less):

that is, a bottomless culvert.

Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course. (See figure 102-1.)

Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.

Berm. Curb or dike constructed to control roadway runoff water.

TSee figure 102-1.)

Bridge. A structure, including supports, erected over a depression or an obstruction, such as water, road, trail, or railway, and having a floor for carrying traffic or other moving loads.

Bridge Length. The overall length measured along the centerline of road to the back of abutment backwalls, if present: otherwise, end to end of the bridge floor, but in no case less than the total clear opening of the structure.

Bridge Traveled Way Width. The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom of curbs or, if curbs are not used, between the inner faces of parapet or railing.

Change. "Change" means "Change Order" as used in the Federal Acquisition Regulations, or "Design Change" as used in the Timber Sale Contract.

Clearing Limits. The limits of clearing as designated on the ground or on the drawings. (See figure 102-1.)

Conduit. A natural or artificial channel for carrying fluids, as water pipes, canals, and aqueducts.

Construction Slash. All vegetative material not meeting utilization standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.

Contracting Officer (CO). The person with the authority to enter ,:.::.: into, administer, and/or terminate contracts and make related :f~~I~~;~ determinations and findings.

-: Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors. As used in specifications and drawings for specified roads (Timber Sale Contracts), "contractor" is "purchaser."

EM 7720-100LL, page 6

Controlled !el!ing. Directing the placement of trees in felling by wedges, jacks, cable tension, or distribution of holding wood or any combinations of these which will ensure that trees are dropped into previously cleared areas, or clear of any objects that are to remain.

Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.

Cushion Materia!. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.

Defect. A failure to meet a requirement with respect to a single quality characteristic.

Dra~~ngs. The documents, including plan and profile sheets, cross sectIons, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.

Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.

Engineer. The Contracting Officer's Representative (COR) or Engineering Representative (ER) responsible for onsite administration of the contract.

Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.

Excess Excavation. Material from the roadway in excess of that..needed for constructIon of desIgned roadways.

Forest Service. The United States of America, acting through the Forest Service, u.S. Department of Agriculture.

Gauge. The term "gauge" when used in connection wi th the measurement of plates will mean the U.S. Standard Gauge, except when reference is made to the measurement of metal sheets used in the manufacture of corrugated metal, pipe, metal plate culverts and arches, and metal cribbing, then the term means the "gauge" or "thickness" specified in AASHTO M 36, M 167, M 196, and M 219, as applicable. When the term "gauge" refers to the measurement of wire, it will mean the wire gauge specified in AASHTO M 32.

Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or by other

Federal agencies.

Inspector. The Government-authorizea representative designated in writjng bY the CO, COR, or ER responsible for detailed inspection.

Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.

r~aboratory. A testing laboratory of the Government or any other testing laboratory approved by the contracting Officer.

Materials. Any substance specified for use in the constru.ction of the project and its appurtenances.

Maximum Density. The highest density that can be obtained under stated condItIons.

EM 7720-100LL, page 7

Measurement. Determining and expressing the quantities of work or.materIals.

Multi-Beam Girder. A precast, prestressed concrete member where ~~, the concrete deck is precast as an integral part of the member. , Neat Line. A line defining the proposed or specified limits of an excavation or structure.

Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifIcations as measurements of material to be used in the construction.

Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.

Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.

Pavement Structure. Subbase, bas~, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.

Pioneer Road. Temporary construction access built along the route of the proJect.

~. A culvert that is circular (round) in cross-section.

Pipe-Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).

; Profile Grade. The trace of a vertical plane, as shown on the : drawings, intersecting the top surface at the centerljne of the proposed facility construction. ~ l' cPurchaser. The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a

.! Timber Sale Contract and acting independently or through his, : their, or its agents, employees, or subcontractors., Random Sampljng. Sampling at times or locations determined in advance by the use of a table of random numbers.

Reas~~~b~y c~~se c~nfor~ity. Unless working tolerances are specIfIed, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground.

"Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

Right-of-Way. A genera] term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands) or (2) land, appurtenances thereto, or interest therein, usua1ly in a strip, acquired for public or private passageway.:. .

10 1 ):=~,:: (See fIgure 2-.

Road Template. The shape and cross-sectional dimensions of the roadway to be constructed as defined by the construction staking notes and the characteristics of the typical sections.

Roadbed. The graded portion of a road between the intersection of subgrade and side slopes excluding that portion of the ditch below subgrade. (See figure 102-1.) \

Roadside. A general term denoting the area adjoining the outer )t edge of the roadway. (See figure 102-1.)

EM 7720-100LL, page B

Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding. (See figure 102-1.)

Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.

Second Samples. A sample taken when the initial sample indicates that the material is defective.

Shoulder. The portion of the roadway contiguous to the traveled way for accommodation of stopped vehicles, for emergency use, and for lateral support of pavement structure. (See figure 102-1.)

Si~ew~l~. The portion of the roadway constructed primarily for pedestrIan use.

Special pr~ject specifi~ation~. The specifications that detail the conditions and requirements peculiar to the individual project, including additions and revisions to Standard

Specifications.

Specifications. A description of the technical requirements for a ; material, product, or service that includes criteria for determination whether these requirements are met.

Standard Speci!icati~~~. Specifications approved for general application and repetitive use.

Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.

Subgrade Treatment. Modification of roadbed material by stabiljzation.

Subgrade. The layers of roadbed that bring it up to the top surface, upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.

(See figure 102-1.)

Substructure (Bridge). All of that part of the structure below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames, together with the backwalls, wingwalls, and wing protection railings.

! Superstructure (Bridge). The entire structure except the substructure.

Surface Course. The top layer of a pavement structure, sometimes called the wearing course, usually designed to resist skidding, traffic abrasion, and the disintegrating effects of climate. (See figure 102-1.)

Tackifier. Binder for vegetative mulch.

!a~ge; ~a;~~. The percentage of each material in a mixture c, Intended for a particular use from which allowable variations are measured.

Timber Sale Contract. A written contract for the removal of

Nationa1 Forest timber.

Traveled Way. The portion of the roadway for the movement of vehicles, exclusive of shoulders and auxiliary lanes. (See figure

102-1.)

Turnout. A short auxiliary lane on a one-lane road provided for the passage of meeting vehicles.

EM 7720-l00LL, page 9

~,;;l~

Unit of Measurement. The unit and fractions of units shown in the Schedule of Items.

Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of or that can be used only in certain locations or for limited purposes.

Utilization Standards. The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

.C

.~:.-:f

EM 7720-100LL, page 10 f au l

I.~ M

-JO

H j~ r~ fg{~ i t

D U lJ~ a l3

G

I rf~ f~ s..

s..

r-

0.

I r-

I

I

G I

".,,!-.f c

JaplnO 4S

.'...js.."...:.':,,':.:'."":':'.~

:;1;':.;.~ i~

5{{~

"fi~

1~ t

U c...:r!';

i If-

If- S o.

E li)i~

I!i.~ I$!t$l~ f~ i~

0) cu

G I

I

I

..-;:i'.'."".

G

I

G

C

:ifJ:~

:i::~ :i:'~

S o.

or-e

«r-or- J a P l n 0 4 S

.:;;: C

U ""r-

,"N t

E lf- G

I

Q g

"","",""""o.."""..,G I.",.., :'..:i,:.::':: Q

\,::,':':'::""':":'f'~

10 ~

IV

'~I:61 t ""'".,""",!!-L'L."""~

'-'L"""'~

_w aU l I.~

M

-JO

46~

H

.,11'.

E M

7720-100LL,

page

A pril 1, Section 103 -Intent of Contract

The Intent of the contract is to provide for the complete 'c construction of the project described in the contract. Unless) otherwise provided, the contractor shall furnish all labor, ;~ materials, equipment, tools, transportation, and supplies, and shall perform all work required to complete the project reasonably close conformity with drawings and specifications, and in accordance with provisions of the contract.

EM 7720-100LL, page 12

-..~.IIIII. -..""" b fC'" co " .

Section 104 -Maintenance for Traffic

104.01 Unless otherwise provided in the SPECIAL PROJECT SPECIFICATIONS, Roads To Be existing roads, while undergoing improvement, shall be kept open Constructed to all traffic by the contractor and maintained in a condition that will adequately accommodate traffic. No work that interferes or conflicts with traffic or existing access to the roadway surface shall be performed until a plan for the satisfactory handling of traffic has been submitted by the contractor and approved by the Engineer. Specific requirements for temporary c1osures, detours, part-width construction and access to adjacent or intersecting facilities will be SHOWN ON THE DRAWINGS or described in SPECIAL PROJECT SPECIFICATIONS. Construction signing for traffic control shall conform to the Manual on Uniform Traffic Control Devices (MUTCD).

Prior to the contractor shutting down any operations, the contractor shall take such precautions as may be necessary to prevent damage to the project, such as temporary detours, approaches, crossings or intersections: and shall make provisions for normal drainage and minimization of erosion. All travel ways shall be left in a condition suitable for traffic.

The Government may permit use of portions of the project during periods that the contractor has shut down operations. All maintenance attributab1e to permitted use during periods of work suspension will be provided by the Government unless the maintenance resu1ts from fault or negligence of the contractor.

Any maintenance not attributable to use, or necessary during suspensions resu1ting from fault or negligence of the contractor, shall be the contractor's responsibility.

104.02 The contractor is authorized to use Forest Service roads for all Use of Roads activities necessary for completion of this contract subject to the

.by Contractor limitations and authorizatjons described in SPECIAL PROJECT SPECIFICATIONS, when such use wil1 not cause damage to the roads or Nationa1 Forest resources and when traffic can be accommodated safe1y.

EM 7720-l00LL, page 13

Section 105 -Control of Materials

105.01 All materials shall be transported and handled to preserve their, Handling Materials quality and fitness for the work. Aggregates shall be stockpiled, .'\ loaded, and transported in a manner that will preserve specified °, gradation and avoid contamination. Stockpiles of aggregate having different gradations shall not be intermingled.

105.02 When the measurement is by weight, the contractor shall Weighing Devices provide weigh scales, and shall transport the materials so they can be weighed. All weighing shall be done by the contractor.

(a) Platform ScaJes. Platform scales shall be of sufficient length and capacity to permit simultaneous weighing of all axle loads of each hauling unit.

The scales shall be accurate to within 1 percent of the correct weight throughout the range of use. Before using the scales and as frequently thereafter as the Engineer determines necessary to ensure accuracy, the contractor shall have the scales checked, adjusted, and certified by a representative of the State agency responsible for weights and measures or by a qualified manufacturer's representative. The contractor shall maintain the scales to the required accuracy.

The contractor shall provide the Government with copies of weight tickets from a certified scale.

The contractor may have the material weighed on other certified scales without additional compensation and shall furnish certified weight tickets for all material delivered to the project. The contractor shall guarantee permission for a Government representatjve to periodically check the weighing procedure and

~records.

(b) Belt Conveyor Scales. Belt conveyor weighing will be " accepted in lieu of platform scales, provided this method or .

device meets the requirements specified below and is compatible with the provisions of measurement and payment in ~he applicable

) specifications.

: The belt conveyor scale shall meet the design, marking, installation, and tolerance requirements of the National Bureau of Standards Handbook No. 44, and shall be certified by a copy of a National Bureau of Standards Prototype Examination Report of Test.

The wejghing mechanism shall contain a weight totalizer and a self-printing device that legibly imprints the load-out weight on appropriate serially numbered and time-dated tickets. The time dating may be done ~ither by an automatic printing device or manually. Each ticket shall be delivered to the Government representative at job site or point of use. The totalizer calibration adjustment and ticket imprinter shall be furnished with a security lock and key.

Under observation of the Engineer or of a designated Government ~: representative, the contractor shall run a daily zero-load test in

;ft~:\~ accordance with National Bureau of Standards Handbook No. 44.

c

105.03 For contractor-furnished sources (see Section 105.06), the Sampling contractor shall submit test results and a Certificate of & Testing Compliance that states that the aggregate meets the contract

: requirements. For designated sources (see Section 105.06), the , contractor shall submit test results for aggregate gradation and a

Certificate of Compliance that states gradation meets contract requirements. Crushing, screening, and mixing plants shall be equipped with sampling devices. The contractor shall take additional samples as required to validate the certification. ~ c'

EM 7720-100LL, page 14

Sampling and testing of the material before incorporation into the work shall be in accordance with AASHTO requirements and shall occur as follows:

(a) For onsite produced materials at crushing or screening plants: after additions of any necessary blending material.

(b) For commercially produced aggregates: at the producer's, plant or stockpile.

(c) For gradation of combined aggregate in bituminous plant mixtures: either before or after introduction of bituminous material.

These test results shall not preclude later sampling and testing for final acceptance after final processing of the material.

105.04 (a) ~~~t~!i;a~~on w~th.~ipme~t~. When each load of bitu.inous Certification & materIal IS delIvered, the contractor shall furnish the Engineer Sampling of with one copy of the Bill of Lading and a fully executed Bituminous Materials Certificate of Compliance conforming to the format below (see figure 105-1). A separate Certificate of Compliance will not be required if the standard Bill of Lading contains the essential information required by the certificate.

(b) Sampling. Sampling of bituminous material may be required to validate certifications furnished by the contractor. When sampling is directed by the Government, the actual samples shall be obtained by the contractor in the presence of the Engineer.

All delivery and plant equipment shall be constructed to permit sampling in conformance with AASHTO T 40 test procedure.

Consignee Designation Contract Number Date Identification (truck no.. car no.. etc.

Type and Grade W1th Addlt1ve (percent and brand) Loading Temp. Net Weight Net Gallons Specific Gravlty

This shipment of bituminous material identified above and covered by this Bill of Lading complies with Forest Service STANDARD SPECIFICATIONS as modified by SPECIAL PROJECT SPECIFICATIONS applicable to this project.

Producer Signed

Producer's Representative

Figure lO5-1.--Sample Bill of Lading and Certificate of Compliance.

105.05 (a) The contractor, with the written approval of the Contracting Rights in & Use of Officer, may use on the project suitable stone, gravel, sand, or Materials Found or other material found in the excavation. Payment will be made Produced on the Work both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The contractor shall replace, without additional compensation, sufficient suitable materials to complete the portion of the work that was originally contemplated to be constructed with such material.

(b) Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to reimburse the contractor for the cost of their production.

EM 7720-100LL, page 15

105.06 (a) Designated Sources. Sources of local materials designated in Material SOurces the SPECIAL PROJECT SPECIFICATIONS or SHOWN ON THE DRAWINGS are guaranteed by the Government for the quality and quantity of material in the source. The contractor shall determine the ~ equipment and work required to produce the specified product. The ~ contractor shall submit test results and a Certificate of ,?

Compliance that states that the gradation of the aggregate meets the contract requirements.

The contractor shall utilize all suitable material in the source.

The designation of a source will include the right of the contractor to use areas SHOWN ON DRAWINGS for the purposes designated (that is, plant sites, stockpiles, haul roads). Unless otherwise indicated or approved, no additional operating area will be allowed, and the contractor will be required to operate in the confines of the area(s) designated.

The weight/volume relationship used for determination of designed quantities of material in designated sources subject to weight measurement are SHOWN ON THE DRAWINGS.

Should the designated source, due to causes beyond the control of the contractor, contain insufficient suitable material, the Government will provide another source with an adjustment in contract price.

(b) Contractor-Furnished Sources. When the material sources are,. not desIgnated as provIded above, or the contractor elects not to use designated sources, the contractor shall be responsible for furnishing material that produces an end product equivalent in performance to that originally designated. An adjustment in contract price will be made where the weight/volume relationship differences between designated source material and

: contractor-furnished source material results in a financial ~ disadvantage to the Government. The contractor shall be : responsible for completing any pit development specified for a designated source, even though the contractor does not choose to ~obtain material from the source if such a statement is SHOWN ON '

: THE DRAWINGS.

.; Quality testing in conformance with applicable requirements and : acceptable to the Engineer to establish the equivalency of the end , product shall be the responsibility of the contractor. Test results shall be furnished to the Engineer.

EM 7720-l00LL, page 16

Section 106 -Measurement & Payment

106.01 Measurement and payment for contract work will be made only for and Measurement & under those pay items included in the SCHEDULE OF ITEMS. All other Payment work and materials will be considered as included in the payment for items shown.

When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any pay item, suffixes will be added to the item number to differentiate between the items.

106.02 The following measurements and calculations are used to determine Determination of contract quantities.

Quantities

For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified.

Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding will be along slope lines.

The average end area method will be used to compute volumes of excavation or embankment. However, if in the judgment of the Engineer, the average end area method is impractical, measurement will be made by volume in hauling vehicles or by other three dimensional methods.

Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered by the Engineer in writing to fit field conditions.

.\ For items that are measured by the ]inear foot, such as pipe culverts, fencing, guardrail, and underdrains, measurements will be made parallel to the base or foundation upon which the structures are placed. Pipe and pipe arch culverts shall be measured a]ong center of invert and arches shall be measured at

: spring line.

For aggregates weighed for payment, the tonnage will not be adjusted for moisture content, unless otherwise provided in SPECIAL

PROJECT SPECIFICATIONS.

For bituminous material, vo]umes will be measured at 60 of or wjll be corrected to the volume at 60 of by using ASTM D 1250 for asphalts. Emulsjfied asphalt will be measured at 60 of or measured by converting the gallonage at another temperature to gallonage at 60 of by means of the following formula:

Gallons at 60 of = Gallons at A of 1 + 0.00025 (A of -60 'F) in which A of is the Fahrenheit temperature of the material at the time the gallonage is measured.

For vehicular shipments, net certified scale weights or weights based on certified volumes will be used as a basis of

: measurement. Measurements will be adjusted when bituminous ': material has been lost from the vehicle or from the distributor, has been wasted, or has otherwise not been incorporated into the work. Determining true weights of hauling vehicles shall be made by weighing the empty vehicles at least once a day at the times the Engineer directs. Each vehicle shall bear a plainly legible identification mark.

When bituminous materia]s are shipped, net certified weights, or volume corrected for loss of foaming, can be used for computing quantities.

For standard manufactured items--such as fence, wire, plates, rolled shapes, pipe conduits--identified by gauge, weight, section

EM 7720-100LL, page 17 dimensions. and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted. ')

"106.03 Payment will be by units defined and determined according to U.S. ' Units of Measurement Standard measure and by the following:

(a) ~ubic Yar~. A measurement computed by one of the following methods:

(1) Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

II""

"~:r;\,,: (2) M~terial i~ Pla,;e or Stockp~le. The measl;lrement ;7~i'r:~~ computed uslng the dlmenslons of the In-place materlal.

(3) Material in the Del:ivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

(b) Cubic Yard Mile. A combination of linear and volumetric : measurement meaning the movement of a cubic yard of material

1 mi Ie.

(c) Each. One complete unit, which may consist of one or more parts:--

(d) MFBM. One thousand feet board measure based on nominal width~hicknesses, and extreme usable length of each piece of lumber or timber actually incorporated in the job.

, (e) Station. One hundred linear feet measured horizontally. "., :J(f) Station Yard. A combination of linear and volmetric -" measurement meaning the movement of a cubic yard of material one station.

(g) Thousand GaJlons Mile. A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material 1 mile.

(h) ~. Short ton consisting of 2,000 pounds.

(i) Ton Mile. A combination of linear and weight measurement meani ng the movement of ], ton of material 1 mi Ie.

106.04 One of the following methods of measurement for determining final Methods of payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:

., Measurement

(a) Designed Quantities JJ5il. These quantities denote the final number or units to be paid for under the terms of the contract.

They are based upon the origin~l design data available prior to

, advertising the project. Original design data include the

\~~~~~;:;" preliminary survey information, design assumptions, calculations," .,..~,.: drawings, and the presentation in the contract. Changes in the

,-'.- number of units SHOWN in the SCHEDULE OF ITEMS may be authorized ., under any of the following conditions;

(1) As a result of changes in the work authorized by the Contracting Officer.

(2) As a result of the Contracting Officer determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

EM 7720-l00LL, page 18

(3) As a result of the contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design that Gause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is beiieved to be in error.

(b) Staked Quantities (SQ). These quantities are determined from staked measurements prIor to constructIon.

(c) Actual Quantities (AQ). These quantities are determined from : measurements of completed~ork.

(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles:

(e) ~g~P--~~~ ~~a~!i~i~~(LSQ!. These quantities denote one complete unIt of work as requIred by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

106.05 Bituminous materials are defined as all types and grades of asphalt Price Adjustment cement, liquid asphalt, emulsified asphalt, and dust oil.

for Out-of- Specification If bituminous materia] fails one or more test requirements, and the Bituminous Materials Contracting Officer determines it is in the public interest to accept the material at a reduced price, the price reduction shall : be based on the test results giving the largest percent price adjustment. The contractor may remove and replace the defective : material or accept the adjustment.

The price reduction shall apply to all pay items affected.

Price adjustment will be based on samples taken in duplicate in accordance with AASHTO T 40 under the supervision of the Engineer.

Sallples shall be sent to an authorized laboratory. The laboratory shall test one of each duplicate sample and retain the other.

; When any test result is not. within the specification limits, the, laboratory shall immediately notify the supplier and the i Engineer. The Engineer will then authorize check testing of the , retained sample.

, If the retained sample tests satisfactorily, the material will be accepted. If the retained sample also fails, the following schedule of price adjustments shall apply. The average of test values for the two samples will determine the basis for price adjustment, except when test results on the samp]es differ by more than the applicable AASHTO or ASTM Repeatability Unit: then, the test result numerically nearest the specification requirellent will be used. (A repeatability unit is defined as D2S or D2S% limit for single operator precision described in ASTM recommended practice C 670.)

The schedule of price adjustments snaIl not apply to the following tests:

~ AASHTO Test Method

.Spot Test T 102 Particle Charge T 59 Ductility T 51

: Bituminous materials failing to meet specifications for these

.tests shall be removed and replaced.

See Table 106-1 for the schedule of price adjustments for bituminous materials that do not meet specifications.

EM 7720-100LL, page 19 April 1, 1985 .

-I Table lO6-l.--Schedule of price adjustments for out-of-specification bituminous materials.

!'leviation from Specification limit ] .

Measured in Reproducibility Unitsa -," Application

I, but 2, but less than less than less than 3 or

1 2 3 greater

Price reduction applicable to bituminous base course and pavement mixture or to seal coat and bituminous Remove & surface treatMent aggregate. 0% 5% 25% Replace

Price reduction applicable to bituminous material paid Remove & for as a separate item. 0% 10% 25% Replace aA reproducibility unit is defined as 02S or D2SA limit for multi-laboratory precision described in ASTM recommended practice C 670.

The Sieve Test (AASHTO T59) results may be exempt from the schedule of price adjustments provided the contractor's quality assurance program includes checking the uniformity of bituminous spread rates in increments no greater than 1 foot over the width of the spray bar and variation between increments is no greater than 5 percent.

106.06 Adjustments of horizontal or vertical alignment. within the Earthwork Tolerances tolerances specified in this contract. or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed roadway section and to balance earthwork.

Such adjustments shall not be considered as "Changes.""'

EM 7720-l00LL. page 20 April 1. 1985

SECTION 150-199 ENGINEERING

EM 7720-100LL, page 21 April 1, 1985 , ';t t..

:~~~::~~i'."".", Section 160 -Quality Control & Quantity Measurement

DESCRIPTION

160.01 This work shall consist of providing quality control in conformance Work with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.

CONSTRUCTION

160.02 The contractor shall provide and maintain a quality control system Quality Control that will ensure that all services, supplies, and construction & Quantity required under this contract conform to the contract requirements.

Measurement The contractor shall perform, or cause to be performed, the System sampling, inspection, and testing required to substantiate that all supplies, services, and construction conform to the contract requirements.

The contractor shall also perform, or cause to be performed, all measurement of quantities of materials incorporated into the work or work processes that are to be measured under the provisions of the contract.

(a) Quality Control Plan. The contractor shall submit in writing the following:

(1) Authorities and responsibilities of inspection and testing personnel.

(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.

(b) Approval of Quality Control Plan. The contractor's proposed quality cont~ol plan for all items requiring quality control shall be submitted to the Engineer for review prior to the contractor commencing work. Within 5 days of receipt of plan, the Engineer shall notify the contractor whether the plan adequately covers quality control requirements. Construction work shal] not be performed prior to contractor's receipt of written approval of the proposed plan. The contractor shall submit to the Engineer, in writing, any proposed changes in the approved quality control plan. proposed changes shall not be put into effect until approved in writing by the Engineer.

160.03 The contractor shall provide and maintain appropriate measuring and Sampling, testing devices, equipment, and supplies to accomplish the required Testing, measurement, testing, and inspection in a timely manner. Tests, Inspection, & measurements, and certifications shall be made as required by the Measurement of drawings and specifications. The contractor shall take samples and Quantities perform inspections and tests necessary to achieve the quality of

C construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be SHOWN ON THE DRAWINGS or in a SPECIAL PROJECT SPECIFICATION.

160.04 (a) ~nsp~ct~~n.and T;~tS. The contractor shall maintain current Records of records of all inspectIons and tests performed. The following Inspection, Tests, format or one containing the following information will be & Measurement acceptable to the Government:

EM 7720-100LL, page 23

Road No. Contract No.

Test By Pay Item No. ~ ~ Station Standard Results (Initials) "'(\

~The contract shall certify in writing that all inspections and ...

tests were performed in accordance with specifications.

(b) As-built Drawings. The contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Engineer.

': 160.05 (a) Offsite Produced Materials. The contractor shall furnish , Certifications & certificates executed by the manufacturer, supplier, or

Measurements vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of materia.l shall be certified by the contract?r.

(b) Quantity Measurements. The contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (00). The contractor shall compute the quantities for periodic progress payments: the Engineer will compute the quantities for the final payment based on measurements taken by the contractor. All contractor measurements are subject to verification. The contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

The following format or one containing the following information '~;

will be acceptable to the Government: ,"

Road No. Contract No.

Quantity or Measured By Pay Item No. ~ Station Measurement (Initials)

MEASUREMENT

160.06 There will be no separate measurement for this section.

Method '

PAYMENT

160.07 The accepted quantities will be paid for at the contract unit price Basis 'for each pay item shown in the SCHEDULE OF ITEMS. Otherwise, quality control and quantity measurement shall be incidental to other specified work.

Payment will be prorated on the percentage of work accomplished on the related pay item that meets specifications.

: : : .i .' j:"

.,:,""..," EM 7720-l00LL, page 24

".'::.: April 1, 1985

'0' .' , '. .

Section 161 -Quality Control & Quantity Mea~surement

161.01 This work shall consist of providing certification that the quality Work and quantity of construction conforms to the drawings, specifications, and requirements of the contract.

CONSTRUCTION

REQUIREMENTS

161.02 (a) Offsite Produced Materials. The contractor shall furnish Certifications & certificates executed by the manufacturer, supplier, or vendor, Measurements stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Each certificate shall apply to a single commodity or invoice. Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor.

(b) Quant~tY_Measurem~n~~. The contractor shall make all measurements for computatIon of quantities for all work items except those specified for payment by Designed Quantity (DO). The contractor shall compute the quantities for periodic progress payments~ the Engineer will compute the quantities for the final payment based on measurements taken by the contractor. All contractor measurements are subject to verification. The contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

The following format or one containing the following information will be acceptable to the Govern.ent:

Road No. Contract No.

Quantity or Measured By Pay Item No. ~~ Station Measurement (Initials)

161.03 As-built Drawings. The contractor shall maintain a set of the Records contract drawings depicting as-built conditions resulting from

Government-authorized changes. The drawings shall be maintained in a current condition. Changes from the original contract drawings shall be indicated in red on the drawings. At the completion of the contract work, as-built drawings shall be submitted to the Engineer.

MEASUREMENT

161.04 There will be no separate measurement for this item.

Method

PAYMENT

161.05 Payment will be considered incidental to other pay items in this Co' Basis contract.

EM 7720-100LL, page 25

""""" ,",'" I "'m1".-

Section 170 -Construction Staking, Transit L.-Line

DESCRIPTION ,

170.01 This work shall consist of the construction staking of a road ," Work project by the Transit L-line method in accordance with -the drawings and specifications. The work includes furnishing all labor, equipment, instruments, materials, transportation, and

': other incidentals necessary to complete the construction staking : in accordance with these specifications and acceptable engineering pra~tice. The work shall also include setting grade-finishing stakes and staking major structures when required.

...,\' Construction staking shall be accomplished under the direction 'of ,'",':' a registered professional engineer or land surveyor. The ':.~ professional engineer or land surveyor will be closely associated and familiar with the construction staking: periodic visits to the project site are required.

MATERIALS:

170.02 All stakes shall have the nominal dimensions SHOWN ON THE DRAWINGS Stakes or stated in the SPECIAL PROJECT SPECIFICATIONS. Identification stakes and hubs shall be of sufficient length to provide a solid set in the ground and to provide space for marking above ground when applicable.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .