AG-32SD-S-17-0041_0001.pdf
PDF 94 KB Posted
- Attached to
- Replace Windows Office-Lab Federal contract opportunity
- Solicitation number
- AG-32SD-S-17-0041
About this file
Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CRL_Window_Schedule_20170508.pdf | ||
| usdaseedbuildingwindowsamplesreport20170508.pdf | ||
| Glazing_Spec_20170214.pdf | ||
| RFI_FORM.pdf | ||
| Wage_Determination_CO170034_04-07-2017__CO34.pdf | ||
| ars372.pdf | ||
| CRL_Window_Schedule_20170209.pdf | ||
| Contractor_Certification_Regarding_EMR.pdf | ||
| ars371.pdf | ||
| 1967_Details_20170209.pdf | ||
| Calculation_of_Self_Performed_Work.pdf | ||
| Floor_Plan_Lab_Office_2004_USDA013_(2)v2_20170209.pdf | ||
| Window_spec_20170403.pdf | ||
| FCco_CRL_Office_Windows_SOW_-__20170406.pdf | ||
| AG-32SD-S-17-0041.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-32SD-S-17-0041
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
FORT COLLINS CO 80526
ARS-NPA-5402-04
1701 CENTRE AVE
SUGAR BEET RESEARCH UNIT
USDA ARS CROPS RESEARCH LABORATORY
CRL, SUGAR BEET RESEARCH UNIT
ARS-WBSC-0330-05-T
Peoria IL 61604 1815 N University St ARS WBSC Contracting, Acquisition, ARS WBSC Contracting, Acquisition, 04/18/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/18/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide answers to questions, a revised window schedule and an asbestos report.
Q.1. The currently installed (existing) windows are caulked in. Does this caulk contain asbestos? For bidding purposes, please advise if the contractor is to include funds for asbestos removal.
A.1. Type of caulk is unknown, original installation was done in the 1960s, so the
Government contracted with Front Range Environmental Testing Service for an Asbestos Survey
Report on the caulking. No asbestos was detected in the attached report "usdaseedbuilding windowsamplesreport20170508.pdf" Therefore the contractor should not include funds for
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JEFFERY A. RIDENOUR
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-32SD-S-17-0041/000001
asbestos removal.
Q.2. Please advise if the government will be removing window coverings and items away from windows so the contractor will have access to the windows on the interior.
A.2. Window covering will be removed prior to work starting
Q.3. Who is responsible for disposal of the windows being removed from the building?
A.3. The Contractor is responsible for removal of all debris
Q.4. During the site visit it was mentioned that the bathrooms inside the building would be available to the contractor replacing the windows
(no Port-O-Potty required). Please confirm.
A.4. Yes
Q.5. There is currently Ivy growing on the side of the building (near the Vestibule #358 stairs).
It was stated during the site walk that the government would remove the ivy before the project begins. Please confirm.
A.5. Yes
Q.6. During the site visit, the existing windows to be replaced are fixed, while in the schedule of windows document "CRL Window Schedule
20170209.pdf" the windows style is "Casement".
Please confirm that the new windows shall be fixed similar to the existing ones which need to be replaced.
A.6. The file was incorrect, it has now been corrected to show the Window Style to be Fixed.
The file is to be replaced with "CRL Window
Schedule 20170508.pdf" as part of this amendment.
Q.7. The existing windows has single pane ¼" glass according to the details in document
"1967_Details_20170209", Please confirm that the new windows shall have double pane glazing insulated with Argon.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-32SD-S-17-0041/000001
A.7. The Project Statement of Work in file "FCco
CRL Office Windows SOW - 20170406.docx", under
Item 4. Relevant Documents included the "Glazing
Spec 20170214.pdf". That Section 088000 -
Glazing, at item 1.8 Insulating Glass. A. Glass
Type : Low-E-coated, tinted insulating glass. 1.
Outdoor Lite: Tinted heat strengthened float glass. Tint to match existing. 2. Indoor Lite:
Clear laminated glass with two plies of annealed float glass. 3. Argon filled.
Q.8. In section 088000 and under 1.4-A the performance requirement is engineering design of glass by contractor; please confirm that meeting minimum performance class and grade of F-HC
100/F-AW 100 called for in section 085113/1.2/A/1 is acceptable for the engineering design process of glass.
A.8. The Government anticipates the glazing specification and the window performance product standards will both be met. If a contractor or supplier cannot meet both of these requirements, a question should have been asked about the specific part that cannot be met.
Q.9. Please confirm that the field testing is for air infiltration and water resistance only, the other performance requirements should be certified by the manufacturer.
A.9. Specification Section 085113 - Aluminum
Windows Item 1.4 Field Quality Control. A.
Testing: By Contractor-engaged agency. Does not specify which field tests are required, but air infiltration and water resistance would be the anticipated field tests with the other tests performed by the manufacturer.
Q.10. Section 5/E under Statement of Work, the option to replace 28 window with installing insulated spandrel panel at the lower part of the window with 1" insulated metal interior panel, while in glazing specification sec 088000/1.9, the insulating spandrel panel made of double pane glass and Argon filled. Please provide more clarification on the insulated spandrel panel for the option bid.
A.10 A commercially acceptable dark colored
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-32SD-S-17-0041/000001
spandrel panel for this type of installation, near floor, would be acceptable.
Q.11. Please confirm that the basis of design product Kawneer 8225TL is for reference only, any other manufacturer that meets the minimum requirement is acceptable.
A.11. Kawneer 8225TL was used as a design reference only and any other manufacturer that meets the minimum requirements will be acceptable.
LIST OF CHANGES:
All terms and conditions remain unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
File details come from the government source that posted it. Updated .