CPER_Fence_Maps_Plans_Photos_2017_Project_20161220.pdf
PDF 1 MB Posted
- Attached to
- Install 6 miles of 4-Wire Fence
- Solicitation number
- AG-32SD-S-17-0007
About this file
CPER Fence Maps Plans Photos 2017 Project 20161220
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C o u n ty R o ad
County Road 114
CPER
HQ.
Fence 1
Fence 4
Fence 3
Fence 6Fence 5
Fence 2
N
Fence 1: South side of Section 7 – 1 mile
C o u n ty
R o ad
H H H PPP H
ca tt le g u ar d ga te
From West:
H = construct 2 post H-brace (terminal) at existing fence P = set 10’ post at ¼ mile H = construct 2 post H-brace at ½ mile (in line) P = set 10’ post at ¾ mile H = construct 2 post H-brace at west edge of existing cattle guard (terminal) H = construct 2 post H-brace with 16’ gate opening at east edge of existing cattle guard (terminal) P = set 10’ post to hang gate in existing fence
Ex is ti n g p ip e fe n ce
Fence 2: North side of Section 17 – 1 mile
H H H P
H H gate
From West:
Fence 2a:
H = construct 2 post H-brace starting at section marker even with existing fence A (terminal) H = construct 2 post H-brace at ¼ mile even with existing fence B (terminal)
Fence 2b:
H = construct 2 post H-brace with 16’ gate opening from existing fence B (Note offset from Fence 2a) (terminal) H = construct 2 post H-brace at west side of pond (terminal) H = construct 2 post H-brace at east side of pond (terminal) H = construct 2 post H-brace even with existing fence C (terminal)) H = construct 2 post H-brace with 16’ gate opening at ½ mile (east side of existing fence C) (terminal)) P = set 10’ post at ¾ mile H = construct 2 post H-brace with 16’ gate opening at 1 mile (terminal) P = set 10’ post to hang gate in existing fence D
Ex is ti n g fe n ce
A
Ex is ti n g fe n ce
C
Ex is ti n g fe n ce
B ga te ga teHH H
P o n d gate
Ex is ti n g fe n ce
D
P
|------------2a---------------| |-----------------------------------------------2b-------------------------------------------------| ga te
Fence 3 – Divide sections 18 and 17 – 1 mile
H H
H P
P gate cattle guard
From North:
H = construct 2 post H-brace with 16’ gate opening on north side of cattle guard (terminal) H = construct 2 post H-brace on south side of cattle guard (terminal) P = set 10’ post at ¼ mile H = construct 2 post H-brace with 16’ gate opening north of existing fence (terminal) H = construct 2 post H-brace with 16’ gate opening south of existing fence P = set 10’ post at ¾ mile H = construct 2 post H-brace on north side of cattle guard (terminal) H = construct 2 post H-brace with 16’ gate opening on south side of cattle guard (terminal) corrals
H
Existing fence
H cattle guard gate
H
Existing fence gate gate
Fence 4 – Divide sections 19 and 20 – 1 mile
H H
H P
P gate
From North:
H = construct 2 post H-brace with 16’ gate opening on north side of cattle guard (terminal) H = construct 2 post H-brace on south side of cattle guard (terminal) P = set 10’ post at ¼ mile H = construct 2 post H-brace with 16’ gate opening at ½ mile (to enter pasture north of existing fence) (terminal) H = construct 2 post H-brace at terminal end of existing fence (terminal) P = set 10’ post at ¾ mile H = construct 2 post H-brace with 16’ gate opening at 1 mile (terminal)
H
Existing fence
H cattle guard gate
Existing fence gate
Fence 5 Fence 6
County Road 114
Fence 5 – South side of section 19 – 1 mile
P P HHH*
gate
From West:
H* = tie to existing H-brace on corner P = set 10’ post at ¼ mile H = construct 2 post H-brace at ½ mile (in line) P = set 10’ post at ¾ mile H = construct 2 post H-brace at 1 mile (terminal)
Fe n ce
C o u n ty R o ad
Fence 6 – South side of section 20 – 1 mile
P P HHga te
From West:
P = set 10’ post at west side of cattle guard (16’ from Fence 5) H = construct 2 post H-brace east of cattle guard (terminal) *Note – If cattle guard not installed make opening 12’ wide.
P = set 10’ post at ¼ mile H = construct 2 post H-brace at ½ mile (in line) P = set 10’ post at ¾ mile H = construct 2 post H-brace with 16’ gate opening at 1 mile (terminal)
Fe n ce ga te
HP
ca tt le g u ar d
Fence 5
Terminal H-brace, note screw in anchor dead-man
H on diagrams
In-line H-brace, note 2 dead-men and wire tied to far postsIn-line 10’ post with wire tied off
P on diagrams H on diagrams
In-line double terminal brace assembly for 16’ gate Opening large enough for gate to swing fully through
H with gate on diagrams
Steel post driven deep to hold fence down in low area
Line post - note staples loosely hold wire
Other features
File details come from the government source that posted it. Updated .