CPER_Fence_Maps_Plans_Photos_2017_Project_20161220.pdf

PDF 1 MB Posted

Attached to
Install 6 miles of 4-Wire Fence
Solicitation number
AG-32SD-S-17-0007
Issued by

About this file

CPER Fence Maps Plans Photos 2017 Project 20161220

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C o u n ty R o ad

County Road 114

CPER

HQ.

Fence 1

Fence 4

Fence 3

Fence 6Fence 5

Fence 2

N

Fence 1: South side of Section 7 – 1 mile

C o u n ty

R o ad

H H H PPP H

ca tt le g u ar d ga te

From West:

H = construct 2 post H-brace (terminal) at existing fence P = set 10’ post at ¼ mile H = construct 2 post H-brace at ½ mile (in line) P = set 10’ post at ¾ mile H = construct 2 post H-brace at west edge of existing cattle guard (terminal) H = construct 2 post H-brace with 16’ gate opening at east edge of existing cattle guard (terminal) P = set 10’ post to hang gate in existing fence

Ex is ti n g p ip e fe n ce

Fence 2: North side of Section 17 – 1 mile

H H H P

H H gate

From West:

Fence 2a:

H = construct 2 post H-brace starting at section marker even with existing fence A (terminal) H = construct 2 post H-brace at ¼ mile even with existing fence B (terminal)

Fence 2b:

H = construct 2 post H-brace with 16’ gate opening from existing fence B (Note offset from Fence 2a) (terminal) H = construct 2 post H-brace at west side of pond (terminal) H = construct 2 post H-brace at east side of pond (terminal) H = construct 2 post H-brace even with existing fence C (terminal)) H = construct 2 post H-brace with 16’ gate opening at ½ mile (east side of existing fence C) (terminal)) P = set 10’ post at ¾ mile H = construct 2 post H-brace with 16’ gate opening at 1 mile (terminal) P = set 10’ post to hang gate in existing fence D

Ex is ti n g fe n ce

A

Ex is ti n g fe n ce

C

Ex is ti n g fe n ce

B ga te ga teHH H

P o n d gate

Ex is ti n g fe n ce

D

P

|------------2a---------------| |-----------------------------------------------2b-------------------------------------------------| ga te

Fence 3 – Divide sections 18 and 17 – 1 mile

H H

H P

P gate cattle guard

From North:

H = construct 2 post H-brace with 16’ gate opening on north side of cattle guard (terminal) H = construct 2 post H-brace on south side of cattle guard (terminal) P = set 10’ post at ¼ mile H = construct 2 post H-brace with 16’ gate opening north of existing fence (terminal) H = construct 2 post H-brace with 16’ gate opening south of existing fence P = set 10’ post at ¾ mile H = construct 2 post H-brace on north side of cattle guard (terminal) H = construct 2 post H-brace with 16’ gate opening on south side of cattle guard (terminal) corrals

H

Existing fence

H cattle guard gate

H

Existing fence gate gate

Fence 4 – Divide sections 19 and 20 – 1 mile

H H

H P

P gate

From North:

H = construct 2 post H-brace with 16’ gate opening on north side of cattle guard (terminal) H = construct 2 post H-brace on south side of cattle guard (terminal) P = set 10’ post at ¼ mile H = construct 2 post H-brace with 16’ gate opening at ½ mile (to enter pasture north of existing fence) (terminal) H = construct 2 post H-brace at terminal end of existing fence (terminal) P = set 10’ post at ¾ mile H = construct 2 post H-brace with 16’ gate opening at 1 mile (terminal)

H

Existing fence

H cattle guard gate

Existing fence gate

Fence 5 Fence 6

County Road 114

Fence 5 – South side of section 19 – 1 mile

P P HHH*

gate

From West:

H* = tie to existing H-brace on corner P = set 10’ post at ¼ mile H = construct 2 post H-brace at ½ mile (in line) P = set 10’ post at ¾ mile H = construct 2 post H-brace at 1 mile (terminal)

Fe n ce

C o u n ty R o ad

Fence 6 – South side of section 20 – 1 mile

P P HHga te

From West:

P = set 10’ post at west side of cattle guard (16’ from Fence 5) H = construct 2 post H-brace east of cattle guard (terminal) *Note – If cattle guard not installed make opening 12’ wide.

P = set 10’ post at ¼ mile H = construct 2 post H-brace at ½ mile (in line) P = set 10’ post at ¾ mile H = construct 2 post H-brace with 16’ gate opening at 1 mile (terminal)

Fe n ce ga te

HP

ca tt le g u ar d

Fence 5

Terminal H-brace, note screw in anchor dead-man

H on diagrams

In-line H-brace, note 2 dead-men and wire tied to far postsIn-line 10’ post with wire tied off

P on diagrams H on diagrams

In-line double terminal brace assembly for 16’ gate Opening large enough for gate to swing fully through

H with gate on diagrams

Steel post driven deep to hold fence down in low area

Line post - note staples loosely hold wire

Other features

File details come from the government source that posted it. Updated .