Enclosure 3 - Asbestos

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of two residential structures, newest first.
File Type Posted
Q A.pdf PDF
Appendix_V_-_Photographs.pdf PDF
Enclosure_1_-_Building_Footprints.pdf PDF
SOW.pdf PDF
Appendix_III_-_Accreditations.pdf PDF
Appendix_II_-_Laboratory_Results_ _Chain_of_Custody_Forms.pdf PDF
Appendix_I_-_Asbestos_Sample_Analysis_Summary.pdf PDF
Wage_Determination.pdf PDF
Appendix_IV_-_Site_Plan.pdf PDF
Appendix_VI_-_FDEP_Memorandum.pdf PDF
Enclosure_4_-_Hazardous_Materials_Assessment.pdf PDF
Past_Performance.pdf PDF
Enclosure_2_-_General_Requirements.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENCLOSURE 3

02081−1

SECTION 02 08 10

ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS

PART 1 GENERAL

1.01 REFERENCES

The publications listed below form a part of this specification. This list is not all inclusive; state and local regulations may have applicable requirements not identified. The publications are referred to in the text by the basic designation only.

A. Code of Federal Regulations (CFR)

29 CFR 1910.134 Respiratory Protection

29 CFR 1910.141 Sanitation

29 CFR 1910.145 Accident Prevention Signs and Tags

29 CFR 1926.1101 Asbestos, Tremolite, Anthophyllite, Actinolite

29 CFR 1926.59 Hazard Communication

40 CFR 61-SUBPART A General Provisions

40 CFR 61-SUBPART M National Emission Standard for Hazardous Air Pollutants (NESHAP) for Asbestos

1.02 REQUIREMENTS

A. Description of Work

The contractor shall be licensed for asbestos abatement planning and asbestos abatement in Florida. The asbestos work includes the removal and disposal of approximately 5,000 sf of transite siding, 150 sf of resilient flooring, 100 sf of 9”x9” vinyl floor tile, 100 sf of vinyl floor tile mastic, and 375 sf presumably asbestos-containing ceiling tile.

The quantities listed are total for the entire project. Reference pages 4 and5 of the Hazardous Assessment for specifics. Should additional ACM be identified during the demolition process, the contractor shall stop all work until CO approves additional actions.

Contractor shall obtain all permits and make all required notifications to the State and or

02081−2

County. Contractor shall provide all postings as required during the demolition and pay all associated fees for permitting and disposal.

1.03 SUBMITTALS

Submit the following:

A. Statements

1. Asbestos hazard abatement plan

2. Testing laboratory

3. Private qualified person documentation

4. Landfill approval

5. Employee training records for ACM workers and persons on the property

6. Medical certification requirements

7. Copies of permits

B. Respiratory Protection Program

C. Hazardous waste manifest

E. Asbestos Hazard Abatement Plan

Submit a detailed plan of the safety precautions including equipment and work procedures to be used in the removal and demolition of materials containing asbestos. The plan shall be prepared, signed, and sealed by the Private Qualified Person (PQP). Such plan shall include but not be limited to the precise personal protective equipment to be used, the location of asbestos control areas, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan shall also include (both fire and medical emergency) response plans. The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification.

F. Testing Laboratory

Submit the name, address, and telephone number of the testing laboratory selected for the sampling, analysis, and reporting of airborne concentrations of asbestos fibers along with evidence that the laboratory selected holds the appropriate Florida state licenses and/or permits and certification that the laboratory is American Industrial Hygiene Association

02081−3

(AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry (AAR) and successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program.

G. Private Qualified Person Documentation

Submit the name, address, and telephone number of the Private Qualified Person (PQP) selected to prepare the Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully completed training in and is certified as a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer as required by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The PQP shall be appropriately licensed in the State of Florida as an asbestos supervisor and designer.

H. Landfill Approval

Submit written evidence that the landfill for disposal is approved for asbestos disposal by the U. S. Environmental Protection Agency and state and local regulatory agency(s). Submit to the Contracting Officer, waste shipment records and hazardous waste manifest, prepared in accordance with federal regulations, signed and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill, within 3 days after delivery. Final payment will not be made until the completed manifest from the landfill has been received by the Government.

I. Notifications

Notify the Contracting Officer and other appropriate Government agencies in writing 10 working days prior to the start of asbestos work as indicated in applicable laws, ordinances, criteria, rules, and regulations.

PART 2 PRODUCTS

(Not Used)

PART 3 EXECUTION

3.01 WORK PROCEDURE

A. Perform asbestos related work in accordance with 29 CFR 1926.1101, 40 CFR

61-SUBPART M, and as indicated in the approved asbestos hazard abatement plan.

END OF SECTION 02081

SOW, Demolish Two Residential Structures, Canal Point, FL
Div 1, Demolish Two Residential Structures, Canal Point, FL
ENCLOSURE 3
Specification 02 08 10 Asbestos, Demolish Two Residential Structures, Canal Point, FL
A. Description of Work
A. Perform asbestos related work in accordance with 29 CFR 1926.1101, 40 CFR 61-SUBPART M, and as indicated in the approved asbestos hazard abatement plan.
ENCLOSURE 4
Hazardous Assessment, Demolish Two Residential Structures, Canal Point, FL