Appendix_I_-_Asbestos_Sample_Analysis_Summary.pdf

PDF 44 KB Posted

Attached to
Demolition of two residential structures Federal contract opportunity
Solicitation number
AG-32SC-S-16-1000JD
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

Appendix I - Asbestos Sample Analysis Summary

View the file

Other files for this federal contract opportunity

Other files attached to Demolition of two residential structures, newest first.
File Type Posted
Q A.pdf PDF
Appendix_V_-_Photographs.pdf PDF
Enclosure_1_-_Building_Footprints.pdf PDF
SOW.pdf PDF
Appendix_III_-_Accreditations.pdf PDF
Appendix_II_-_Laboratory_Results_ _Chain_of_Custody_Forms.pdf PDF
Enclosure_4_-_Hazardous_Materials_Assessment.pdf PDF
Past_Performance.pdf PDF
Enclosure_3_-_Asbestos.pdf PDF
Enclosure_2_-_General_Requirements.pdf PDF
Wage_Determination.pdf PDF
Appendix_IV_-_Site_Plan.pdf PDF
Appendix_VI_-_FDEP_Memorandum.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX I

ASBESTOS SAMPLE ANALYSIS SUMMARY

ANALYSIS SUMMARY

No. HA Material Description Asbestos Type/Percent Notes:

1 Main House - Roof Shingle None

2 Main House - Roof Shingle None

3 Main House - Roof Shingle None

4 Main House - Transite Siding 15% Chrysotile

5 Main House - Transite Siding 15% Chrysotile

6 Main House - Transite Siding 15% Chrysotile

7 Main House - Wallboard None

8 Main House - Wallboard None

9 Main House - Wallboard None

10 Main House - Rope Window Trim None

11 Main House - Rope Window Trim None

12 Main House - Rope Window Trim None

13 Main House - Kitchen - Resilient Flooring 15% Chrysotile Bottom layer of 2

14 Main House - Kitchen - Resilient Flooring 15% Chrysotile Bottom layer of 2

15 Main House - Kitchen - Resilient Flooring 20% Chrysotile Bottom layer of 2

16 Sewer pipe joint seal - Main House None

17 Roof shingle - Back house None

18 Roof shingle - Back house None

19 Roof shingle - Back house None

20 Transite siding - Back house 15% Chrysotile

21 Transite siding - Back house 15% Chrysotile

22 Transite siding - Back house 15% Chrysotile

23 Wallboard - Back house None

24 Wallboard - Back house None

25 Wallboard - Back house None

26 9" x 9" vinyl floor tile w/ mastic - back house 3-10% Chrysotile 10% for tile, 3-5% for mastic

27 9" x 9" vinyl floor tile w/ mastic - back house 3-10% Chrysotile 10% for tile, 3-5% for mastic

28 9" x 9" vinyl floor tile w/ mastic - back house 3-10% Chrysotile 10% for tile, 3-5% for mastic

SOW, Demolish Two Residential Structures, Canal Point, FL
Div 1, Demolish Two Residential Structures, Canal Point, FL
ENCLOSURE 3
Specification 02 08 10 Asbestos, Demolish Two Residential Structures, Canal Point, FL
A. Description of Work
A. Perform asbestos related work in accordance with 29 CFR 1926.1101, 40 CFR 61-SUBPART M, and as indicated in the approved asbestos hazard abatement plan.
ENCLOSURE 4
Hazardous Assessment, Demolish Two Residential Structures, Canal Point, FL

File details come from the government source that posted it. Updated .