AG-32SC-S-16-0017
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Athens GA 30605
ARS-EBSC-0325-05-Q
Attn: Brenda L Owens 950 College Station Rd ARS EBSC Contracting, Acquisition, ARS EBSC Contracting, Acquisition, 05/18/2016000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/22/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Beltsville Area Research Center (BARC) Steam System Repair
A. This amendment is written to change the proposal due date to May 25, 2016, at 1400 ET
(2:00 pm ET)
B. Contract Line Item 0012 (Option 10) is added: Cost per foot of Asbestos Abatement for additional quantity found above that prescribed in the specifications and drawings shall be covered under this item. This CLIN will not be considered in the overall total price for
Lowest Price Technically Acceptable.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
BRENDA L. OWENS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
05/18/2016
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-32SC-S-16-0017/000002
C. The specifications are changed to Include revised Appendix A, attached.
D. The drawings and specifications are changed as follows:
a. All insulation on the project encountered by the contractor is assumed to be asbestos as stated on the plans.
b. SECTION 01 30 00 (Page 1)
1.2.3 Subcontractor Special Requirements
1.2.3.1 Asbestos Containing Material
Delete: See Appendix A.
c. Specification SECTION 01 35 26 (Page 8) Lead Compliance Plan. The safety and health aspects of lead work, Delete: "prepared in accordance with
Section 02 83 13.00 20 LEAD IN CONSTRUCTION."
Asbestos Hazard Abatement Plan. The safety and health aspects of asbestos work, Delete: "prepared in accordance with
Appendix A Section 02 82 14 ASBESTOS ABATEMENT."
E. Period of Performance is negotiable, contractors are advised to include any proposed changes in their pricing offer on the SF 1442 with each contract line item.
F. Acknowledgement of this and all amendments must be submitted with proposals.
G. All other terms and conditions remain unchanged.
Delivery: 90 Days After Notice to Proceed
Delivery Location Code: ARS-EBSC-0325-05-Q
ARS EBSC Contracting, Acquisition, ARS EBSC Contracting, Acquisition, 950 College Station Rd
Athens GA 30605 US
FOB: Destination
Option 10
012 Asbestos Abatement 1 FT
IAW: Appendix A, Specification Section 01 30 00 and Specification SECTION 01 35 26
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-32SC-S-16-0017/000002
Provide a cost per foot for remediation in the same method and manor of asbestos abatement exceeding that specified in the plans based on over and above the required "minimum of six linear feet of asbestos pipe insulation to be abated, packaged, transported and disposed of in accordance with Local, State and Federal regulations.¿
(Option Line Item)
09/30/2016
Product/Service Code: Z1NB
Product/Service Description: MAINTENANCE OF
HEATING AND COOLING PLANTS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA