Attch_5_Sample_Task_Order_Work_Descriptions.docx

DOCX document 24 KB Posted

Attached to
Marienville RD ATV Heavy Maintenance
Solicitation number
AG-24H8-S-16-0009
Issued by

About this file

Attch 5 Sample Task Order Work Descriptions

View the file

Other files

File Type Posted
Questions-Answers_041216.docx DOCX document
Questions-Answers_040416.docx DOCX document
Attch_1_Specifications.docx DOCX document
Attch_3_Timberline_Map.pdf PDF
Attch_6_GovtProvidedTechnicalProposalForms.docx DOCX document
Attch_4_DBWD_PA160004_021216_PA4_Heavy_and_Highway_McKean.docx DOCX document
AG-24H8-S-16-0009_Complete.pdf PDF
Attch_2_Marienville_Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Marienville Trail Heavy Maintenance Marienville ATV Trail Rehab Allegheny National Forest

Trail Log - Work Descriptions

Marienville ATV and Timberline ATV Trail Repair Sites

SPECIFIED WORK

a. Description of Work:

Placement of specified stone to 1 site on Marienville ATV Trails and 2 sites on Timberline ATV trails for repairs.

Marienville ATV Trail

Station Trail Log/Work Description

67+00 – 74+00 Trail Reconstruction, dewater deep holes, apply R4 as a base (184 tons) and apply PA2A surfacing (23 tons) This stone is furnished and stockpiled at the stone pit at the end of FR 396.

Timberline ATV Trail “A” Loop

Station Trail Log/Work Description

395+00 – 397+00 Apply 4” PA 2A surfacing (46 tons) This stone is furnished and stockpiled at the end of FR 338A (Sta. 431+55)

396+00 Install 16” x 16’ steel casing, apply 11.5 Tons PA 2A (Stone furnished and stockpiled at the end of FR 338A (Sta. 431+55)

403+60 – 405+60 Apply 4” PA 2A surfacing (46 tons) This stone is furnished and stockpiled at the end of FR 338A (Sta. 431+55)

410+60 – 412+60 Trail Reconstruction in new location, apply R4 as base (46 Tons) and apply PA 2A surfacing (34.5 Tons). Decommission the existing trail. This stone is furnished and stockpiled at the end of FR 338A (Sta. 431+55)

422+00 – 424+00 Apply 4” PA 2A surfacing (46 tons) This stone is furnished and stockpiled at the end of FR 338A (Sta. 431+55)

Timberline ATV Trail “D” Loop

Station Trail Log/Work Description

180+10 – 181+10 Apply 4” PA 2A surfacing (23 tons) This stone is furnished and stockpiled at the intersection of trail and FR 339 (Sta. 180+00)

188+30 – 192+30 Trail Reconstruction,dewater deep holes, apply R4 as base (46 Tons) and apply PA 2A surfacing (92 Tons) This stone is furnished and stockpiled at the intersection of trail and FR 339 (Sta. 180+00)