BogLoopAOPs_AG1484S150003_Pre-BidNotes.docx
DOCX document 20 KB Posted
- Attached to
- Bog Dam Loop Road-Stream Crossings Replacement Federal contract opportunity
- Solicitation number
- AG-1484-S-15-0003
About this file
BogLoopAOPs_AG1484S150003_Pre-BidNotes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EBUAmmo_Geotech_Report_REVISED_07-03-15.pdf | ||
| Stony_Brook_Geotech_Report_REVISED_07-03-15.pdf | ||
| Spruce_Brook_Geotech_Report_REVISED_07-03-15.pdf | ||
| Bog_Dam_Loop_Crossing_Q-A.docx | DOCX document | |
| AG-1484-S-15-0003-000001.pdf | ||
| Stony_Brook_C0.02_General_Notes_ _Quantities.pdf | ||
| EBUA_C0.02_General_Notes_ _Quantities.pdf | ||
| Spruce_Brook_C0.02_General_Notes_ _Quantities.pdf | ||
| Attch_7_Govt_Provided_Technical_Proposal_Forms.docx | DOCX document | |
| Attch_2_Spruce_Brook_Final_Design_Plans_9-12-14.pdf | ||
| Attch_4_FSSuplementSpecs.pdf | ||
| AG-1484-S-15-0003.pdf | ||
| Attch_5_208.06_Modified_Supplmental_Spec.pdf | ||
| Attch_1_EBU_Final_Design_Plans_9-12-14_rev_01-30-15.pdf | ||
| Attch_6_DBWD_NH150028_010215__NH28_Highway_Coos.pdf | ||
| Attch_3_Stony_Brook_Final_Design_Plans_9-12-14.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bog Dam Loop Road-Stream Crossings Replacement --- AG-24H8-S-15-0003 Notes, and clarification --- 06/18/2015
Questions from email - Is work onsite restricted to begin after Aug., 2016? >> Work may be scheduled to meet contractor’s operational needs, and within activity windows stated. See Sections c-1 and c-5, for information.
Questions from Pre-Bid; 06/17/2015 The existing access route has load restrictions; will waivers be provided? >> Operations must be conducted within the posted load restrictions. Refined analysis of the current load restrictions are pending from other sources; and results are likely not available prior to bid due-date of this project. If at future times the access route is found to alter from currently-known information, discussions will be held for this project related to differing site conditions as applicable.
Clarify the work schedule? >> See Sections C-1, and C-5, and related provisions for scheduling and submittal requirements. The intent is to conduct preconstruction activities over the remainder of the current season, such as planning schedules and logistics, obtaining shop drawings and manufacture’s calculations / certifications; layout of work and clearing to be completed within Tree Cutting Window; ordering and fabrication of components; site work, assembly, and installations to be completed over the next work season. The successful Contractor shall provide detailed schedules after Award.
Verify the abutment designs? >> Work is to be planned and conducted as provided for in the approved designs. Alterations will be considered as a course of discussion regarding discovery of differing site conditions as applicable.
What is method of dewatering? >> Dewatering must be designed and installed by the Contractor, with work confined to approved areas and temporary disturbances repaired.
Are there special concerns downstream of sites? >> The sites are tributary to municipal water supplies.
Are permits available? >> The Government has obtained watershed impact permits, from NH-DES. Contractor shall obtain additional permits or amend existing permits as needed for their operations.