Solicitation AG-1484-S-15-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EBUAmmo_Geotech_Report_REVISED_07-03-15.pdf | ||
| Spruce_Brook_Geotech_Report_REVISED_07-03-15.pdf | ||
| Stony_Brook_Geotech_Report_REVISED_07-03-15.pdf | ||
| Bog_Dam_Loop_Crossing_Q-A.docx | DOCX document | |
| AG-1484-S-15-0003-000001.pdf | ||
| Stony_Brook_C0.02_General_Notes_ _Quantities.pdf | ||
| EBUA_C0.02_General_Notes_ _Quantities.pdf | ||
| Spruce_Brook_C0.02_General_Notes_ _Quantities.pdf | ||
| BogLoopAOPs_AG1484S150003_Pre-BidNotes.docx | DOCX document | |
| Attch_7_Govt_Provided_Technical_Proposal_Forms.docx | DOCX document | |
| Attch_2_Spruce_Brook_Final_Design_Plans_9-12-14.pdf | ||
| Attch_4_FSSuplementSpecs.pdf | ||
| Attch_1_EBU_Final_Design_Plans_9-12-14_rev_01-30-15.pdf | ||
| Attch_6_DBWD_NH150028_010215__NH28_Highway_Coos.pdf | ||
| Attch_3_Stony_Brook_Final_Design_Plans_9-12-14.pdf | ||
| Attch_5_208.06_Modified_Supplmental_Spec.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
USDA FOREST SERVICE
ALLEGHENY NATIONAL FOREST
4 FARM COLONY DRIVE
WARREN PA 16365
24H8
ALAN ZERO 814-728-6288
1x 05/01/2015
AG-1484-S-15-0003
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
PROJECT TITLE: Bog Dam Loop Road Bridge over the East Branch Upper Ammonoosuc River
The magnitude of this project is between $250,000 and $500,000.
This is a 100% small business set-aside per FAR 19.502-2
The statement of work is included in this solicitation and will be included in the award document.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 460 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
07/02/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
ALLEGHENY NATIONAL FOREST
4 FARM COLONY DRIVE
WARREN PA 16365
24H8
ALAN J. ZERO
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
azero Typewritten Text
DUNS#__________________________
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 44
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
AG-1484-S-15-0003
IGF::OT::IGF
Bog Dam Loop Road Bridge over the East Branch Upper Ammonoosuc River
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
CONSTRUCTION RFP SOL NO AG-1484-S-15-0003
UNIT White Mountain National Forest
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
PART I – SCHEDULE OF ITEMS
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
B-1.1 SCHEDULE OF BASE ITEMS 1:
(East Branch Upper Ammonoosuc, mile marker7.5)
ITEM
NO. DESCRIPTION
METH.
OF
MEAS.*
PAY
UNIT
EST.
QTY.
UNIT
PRICE
SUBTOTAL
PRICE
1-15101 Mobilization LSQ Lump Sum All $__XXX__ $________
1-15702 Silt Fence AQ LF 250 $_______ $________
1-15713 Soil Erosion and Pollution Control LSQ Lump Sum All $__XXX__ $________
1-20101 Clearing and Grubbing CQ Acre 0.10 $_______ $________
1-20305 Removal of Structures and Obstructions LSQ Lump Sum All $__XXX__ $________
1-20401 Roadway Excavation, compaction method A, finishing method A CQ CY 80 $_______ $________
1-20701 Earthwork Geotextile CQ SY 135 $_______ $________ 1-20802 Foundation Fill (material #70401) CQ CY 20 $_______ $________ 1-20803 Structural Backfill CQ CY 250 $_______ $________
1-20805 Cofferdams LSQ Lump Sum All $__XXX__ $________
1-20806 Structure Excavation CQ CY 420 $_______ $________
1-21202 Linear Grading LSQ Lump Sum All $__XXX__ $________
1-25101 Placed Riprap, class 4 CQ CY 85 $_______ $________
1-30103 Aggregate Base, grading B, compaction method F CQ CY 85 $_______ $________
1-30111 Aggregate Base, grading C, compaction method F CQ CY 60 $_______ $________
1-30502 Aggregate Topsoil Course CQ CY 35 $_______ $________ 1-30805 Bedding & Backfill Aggregate CQ CY 75 $_______ $________
1-40301b Hot Asphalt Concrete Pavement, class B, grading B CQ Ton 30 $_______ $________
1-40301f Hot Asphalt Concrete Pavement, class B, grading F CQ Ton 15 $_______ $________
1-55901 Waterproofing Membrane CQ SY 30 $_______ $________
1-57101 Prefabricated Bridge Structure: Design, Fabricate, Deliver, and Install LSQ Lump
Sum All $__XXX__ $________
1-55601 Bridge Rail LSQ Lump Sum All $__XXX__ $________
1-61701 Guardrail System, G2, type 1, class A LSQ Lump Sum All $__XXX__ $________
1-61702 Terminal Section, type flared CQ Each 4 $_______ $________ 1-62521 Turf Establishment CQ Acre 0.10 $_______ $________
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
ITEM
NO. DESCRIPTION
METH.
OF
MEAS.*
PAY
UNIT
EST.
QTY.
UNIT
PRICE
SUBTOTAL
PRICE
1-62901 Rolled Erosion Control Products, type C CQ SY 250 $_______ $________
1-63501 Temporary Traffic Control LSQ Lump Sum All $__XXX__ $________
1-64804 Placed Streambed Simulation Rock, method A CQ CY 25 $_______ $________
1-64806 Streambed Fill (material #70401) CQ CY 20 $_______ $________
SUBTOTAL BID PRICE
BASE ITEM 1 $________
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
B-1.2 SCHEDULE OF BASE ITEMS 2:
(Stony Brook, mile marker 10.3)
ITEM
NO. DESCRIPTION
METH.
OF
MEAS.*
PAY
UNIT
EST.
QTY.
UNIT
PRICE
SUBTOTAL
PRICE
3-15101 Mobilization LSQ Lump Sum All $__XXX__ $________
3-15702 Silt Fence AQ LF 220 $_______ $________
3-15713 Soil Erosion and Pollution Control LSQ Lump Sum All $__XXX__ $________
3-20101 Clearing and Grubbing CQ Acre 0.10 $_______ $________
3-20305 Removal of Structures and Obstructions LSQ Lump Sum All $__XXX__ $________
3-20401 Roadway Excavation, compaction method A, finishing method A CQ CY 215 $_______ $________
3-20701 Earthwork Geotextile CQ SY 200 $_______ $________ 3-20802 Foundation Fill (material #70401) CQ CY 20 $_______ $________ 3-20803 Structural Backfill CQ CY 250 $_______ $________
3-20805 Cofferdams LSQ Lump Sum All $__XXX__ $________
3-20806 Structure Excavation CQ CY 470 $_______ $________
3-21202 Linear Grading LSQ Lump Sum All $__XXX__ $________
3-25101 Placed Riprap, class 4 CQ CY 130 $_______ $________
3-30103 Aggregate Base, grading B, compaction method F CQ CY 100 $_______ $________
3-30111 Aggregate Base, grading C, compaction method F CQ CY 55 $_______ $________
3-30502 Aggregate Topsoil Course CQ CY 35 $_______ $________ 3-30805 Bedding & Backfill Aggregate CQ CY 50 $_______ $________
3-40301b Hot Asphalt Concrete Pavement, class B, grading B CQ Ton 30 $_______ $________
3-40301f Hot Asphalt Concrete Pavement, class B, grading F CQ Ton 15 $_______ $________
3-55901 Waterproofing Membrane CQ SY 30 $_______ $________
3-57101 Prefabricated Bridge Structure: Design, Fabricate, Deliver, and Install LSQ Lump
Sum All $__XXX__ $________
3-55601 Bridge Rail LSQ Lump Sum All $__XXX__ $________
3-60201 36”dia. HDPE Pipe Culvert AQ LF 50 $_______ $________
3-61701 Guardrail System, G2, type 1, class A LSQ Lump Sum All $__XXX__ $________
3-61702 Terminal Section, type flared CQ Each 4 $_______ $________ 3-62521 Turf Establishment CQ Acre 0.10 $_______ $________ 3-62901 Rolled Erosion Control Products, type C CQ SY 100 $_______ $________
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
METH.
OF
MEAS.*
PAY
UNIT
EST.
QTY.
UNIT
PRICE
SUBTOTAL
PRICE
3-63501 Temporary Traffic Control LSQ Lump Sum All $__XXX__ $________
3-64804 Placed Streambed Simulation Rock, method A CQ CY 25 $_______ $________
3-64806 Streambed Fill (material #70401) CQ CY 30 $_______ $________
BASE ITEM 2 $________
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
B-1.3 SCHEDULE OF BASE ITEMS 3:
(Spruce Brook, mile marker 10.8)
ITEM
NO. DESCRIPTION
METH.
OF
MEAS.*
PAY
UNIT
EST.
QTY.
UNIT
PRICE
SUBTOTAL
PRICE
2-15101 Mobilization LSQ Lump Sum All $__XXX__ $________
2-15702 Silt Fence AQ LF 270 $_______ $________
2-15713 Soil Erosion and Pollution Control LSQ Lump Sum All $__XXX__ $________
2-20101 Clearing and Grubbing CQ Acre 0.10 $_______ $________
2-20305 Removal of Structures and Obstructions LSQ Lump Sum All $__XXX__ $________
2-20401 Roadway Excavation, compaction method A, finishing method A CQ CY 195 $_______ $________
2-20701 Earthwork Geotextile CQ SY 145 $_______ $________ 2-20802 Foundation Fill (material #70401) CQ CY 20 $_______ $________ 2-20803 Structural Backfill CQ CY 260 $_______ $________
2-20805 Cofferdams LSQ Lump Sum All $__XXX__ $________
2-20806 Structure Excavation CQ CY 400 $_______ $________
2-21202 Linear Grading LSQ Lump Sum All $__XXX__ $________
2-25101 Placed Riprap, class 4 CQ CY 100 $_______ $________
2-30103 Aggregate Base, grading B, compaction method F CQ CY 100 $_______ $________
2-30111 Aggregate Base, grading C, compaction method F CQ CY 55 $_______ $________
2-30502 Aggregate Topsoil Course CQ CY 35 $_______ $________ 2-30805 Bedding & Backfill Aggregate CQ CY 35 $_______ $________
2-40301b Hot Asphalt Concrete Pavement, class B, grading B CQ Ton 30 $_______ $________
2-40301f Hot Asphalt Concrete Pavement, class B, grading F CQ Ton 15 $_______ $________
2-55901 Waterproofing Membrane CQ SY 30 $_______ $________
2-57101 Prefabricated Bridge Structure: Design, Fabricate, Deliver, and Install LSQ Lump
Sum All $__XXX__ $________
2-55601 Bridge Rail LSQ Lump Sum All $__XXX__ $________
2-61701 Guardrail System, G2, type 1, class A LSQ Lump Sum All $__XXX__ $________
2-61702 Terminal Section, type flared CQ Each 4 $_______ $________ 2-62521 Turf Establishment CQ Acre 0.10 $_______ $________ 2-62901 Rolled Erosion Control Products, type C CQ SY 290 $_______ $________
2-63501 Temporary Traffic Control LSQ Lump Sum All $__XXX__ $________
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
METH.
OF
MEAS.*
PAY
UNIT
EST.
QTY.
UNIT
PRICE
SUBTOTAL
PRICE
2-64804 Placed Streambed Simulation Rock, method A CQ CY 35 $_______ $________
2-64806 Streambed Fill (material #70401) CQ CY 25 $_______ $________
BASE ITEM 3 $________
TOTAL BID PRICE
ITEMS 1, 2, 3
* Designated Method of Measurement AQ – Actual Quantity CQ – Contract Quantity LSQ – Lump Sum Quantity
B-2 NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall be incidental to the contract price. Include bond payments under Mobilization.
B-3 BIDS: The Bidder must bid on all items. Where extended unit prices do not agree with totals or subtotals shown by the Bidder, the unit price governs except as provided under Federal Acquisition Regulations (FAR) 14.406, Mistakes in Bids. Unit prices and extended prices shall be rounded to the nearest one cent.
B-4 BASIS OF AWARD: One contract will be awarded to the technically-preferable responsive and responsible bid, providing best value to the Government. See also, separately attached evaluation factors.
B-5 ITEM SELECTION: One, multiple, or all item schedules may be selected for award under single contract, subject to availability of funds and to best meet the interest of the Government.
Bidder’s Name
Bidder’s Signature
Contractor Notes:
1. Contractor must be registered in www.sam.gov in order to submit an offer on this project. THIS IS A FREE
REGISTRATION.
2. There is a pre-bid meeting at the site on 06/17/2015 at 10:00 am EST.
Directions to site: Meet at the junction of York Pond road and Bog Dam Loop Roads http://www.sam.gov/
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 - PROJECT DESCRIPTION
a) Introduction – The Forest Service (FS) is soliciting bids for the removal and replacement of several road-stream crossings, in Berlin, NH within the White Mountain National Forest, Androscoggin Ranger District.
The contractor shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits (as applicable), coordination with utilities, transportation, and incidentals necessary to complete the work described. The desired outcome is completed installation per the standards attached to this solicitation, and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract. Work shall be completed as shown in the drawings, maps, specifications, and exhibits as referenced or included in this contract; and in accordance with applicable federal state and local regulations.
b) Description of Work – Work includes the removal of existing culverts, and installation of new precast concrete frame structures; including stream dewatering, excavations, furnish and place structures, constructing roadway embankments and structural backfill, furnish and place aggregate and asphalt surfacing, regrading of streams, and furnish and install bridge rails and related roadway appurtenances.
c) Project Location – Bog Dam Loop Road, NFSR #15 is located off of the York Pond Road, accessed from Highway 110 in Milan, New Hampshire approximately 10 miles north of Berlin, NH See also, vicinity maps on enclosed Plans.
d) Price Range – Between $250,000 and $500,000
e) Pre-bid Tour – A pre-bid tour is proposed on June 17, 2015. No additional pre-bid tour is planned.
Prospective bidders wishing to visit the site on their own may obtain directional information by contacting Scott Lees at the Forest Supervisor's Office, White Mountain National Forest, Campton, New Hampshire, telephone (603) 536-6252, or can call the Androscoggin District Office, Gorham, New Hampshire, telephone
(603) 466-2713.
f) Start Work – It is estimated that work will begin around August 10, 2015. Site disturbing activities shall be performed consistent with the periods of restriction noted in Plans, Permits, or other instruction.
g) Period of Performance – Work shall be completed by November 12, 2016. The Period of Performance includes pre-construction and construction activities such as: obtaining permit approvals, submittal of fabrication and manufacturing proposals, ordering and delivery of materials; and performance of the work.
h) Government Furnished Materials – None.
i) Use of Environmentally-Preferable Materials – Contractor shall use in the work, and incorporate into finished product, bio-preferred materials and supplies whenever available and practical. Submit to the CO for approval prior to ordering materials, product sheets and manufacturer’s information, indicating environmentally-preferable content.
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
C-2 - PROJECT OPERATIONS
C2-a) Permits – The Government has obtained permits for instream construction activities, as referenced in the solicitation. The Contractor shall obtain additional permits as necessary for the operations; such as transportation of heavy loads or hazardous materials, disposal of materials, crossing of railways, or similar, as required by local, state, and federal jurisdictions.
C2-b) Staging Area – The Contractor shall coordinate with the CO on a staging area location(s). The Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing roads, parking lots, and landscaping.
C2-c) Landscape Preservation – The Contractor shall confine operations to within the clearing limits designated, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside these limits.
Equipment shall be clean and properly-maintained. Leaking or faulty equipment shall be repaired or removed.
Refueling, greasing, or servicing of equipment shall be in controlled areas away from surface waters. Fording of streams or rivers with mechanized equipment shall not be allowed.
If, prior to or during excavation work, items of archaeological, paleontological, or historic value are reported or discovered, or an unknown deposit of such items is disturbed, the Contractor shall immediately cease excavation in the area so affected. Contractor will then notify the Forest Service and will not resume excavation until written approval is given by the authorized officer.
C2-d) Erosion Control – The Contractor is responsible for implementing temporary erosion control. Establish erosion protection and dewatering methods prior to conducting excavations. Maintain erosion control measures, and improve and replace immediately any non-functioning measures, throughout the course of the project and until site stabilization has been reestablished.
Schedule and conduct operations to minimize erosion of soils and to prevent silting or muddying of stream, rivers, irrigations systems, or impoundments.
C2-e) Dewatering – The Contractor is responsible for all dewatering activities. Conduct dewatering suitable to protect the landscape from the activities, and as needed to isolate the work from streams and protect the work from damage.
C2-f) Spill Prevention – The Contractor shall prepare for approval, and adhere to, a Spill Prevention, Control, and Countermeasures Plan suitable to protect environment from the Contractor’s operations.
Pollutants such as fuels, lubricants, bitumens, sewage, hazardous, or otherwise harmful shall be controlled at the site and prevented from release to the environment. All contaminated soil, vegetation or debris resulting from Contractor’s operation shall be immediately contained and within 24 hours shall be removed from site and legally disposed.
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
Control the discharge of non-hazardous wash water through sufficient siltation treatments, such as filters, barriers, or settlements. Dispose of any materials containing hazardous-substances legally off national forest system lands.
C2-g) Electrical – There is no electrical service on this project.
C2-h) Services – Potable Water and Toilet Facilities are not available in this location. The Contractor is responsible for providing temporary sanitation facilities as necessary.
C2-i) Existing Utilities – The Contractor shall ensure locations of any utilities prior to excavation, trenching, or other ground disturbing activity. The Contractor shall be responsible for protecting or otherwise replacing utilities damaged by Contractor’s operations.
C2-j) Security and Protection – Security is the Contractor’s responsibility. Limit access to the construction area to persons involved in the work. Provide secure storage for materials that are stored on site. Secure completed work as required to prevent loss.
Barricades, warning signs, and lights shall comply with standards and code requirements for erection of structurally adequate barricades. All road warning signs, barricades, and traffic control devices shall conform to MUTCD. Where appropriate and needed, provide lighting, including flashing red or amber warning lights.
The Contractor shall barricade and block all access to holes with orange plastic fence, flashing amber lights, or warning signs. Holes or trenches shall not be left open more than 24 hours unless approved by the CO.
C2-k) Maintenance of Traffic – The Contractor shall have all temporary construction signs and traffic control measures in place prior to beginning work. The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to limitations and authorizations shown on the Plans or specified under this contract, when such use will not damage the roads or National Forest resources, and when traffic can be accommodated safely.
The roads shall remain open and maintained for public travel; except closure of the work locations, to minimum extent needed to conduct the work.
Any emergency vehicle shall be allowed immediate reasonable passage.
C2-l) Protection of Improvements – The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.
Contractor shall replace, or repair, as approved by the CO any improvements, covered under this contract or already existing, damaged by contractors operations.
Before shutting down operations, take all necessary precautions to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections; and provide for protection of surface drainage and minimization of erosion and prevention of spills.
C2-m) Site Cleanup – The Contractor shall be responsible for solid waste disposal and personnel sanitation.
The Contractor shall at all times keep the area in a clean, neat, and orderly condition. Construction related debris including, but not limited; to used motor oil, oil cans, grease cartridges and refuse shall be removed
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire promptly from the site and disposed of in a lawful manner off National Forest System lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge.
C2-n) Other Operations – The contractor shall avoid interference with the operations of other contractors or projects in the area.
The Forest Service intends to complete the removal and replacement of the road-stream crossing at Brandy Brook, approximate mile marker 12.2, on the same road as this project. The Brandy Brook work site may be closed and impassable at various times during performance of this project.
C-3- SPECIFICATIONS
This project uses the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03), U.S. Customary Units; available by reference and download from http://flh.fhwa.dot.gov/resources/pse/specs/fp-03/fp-03usc.pdf
Supplemental specifications are included with this project as attached, see Section J.
C-4 - DRAWINGS
The following drawings are applicable to this project and included as attached, see Section J.
SHEET NO. TITLE
East Branch Upper Ammonoosuc
1-15 General Layouts, Work Descriptions, and Details Stony Brook
1-15 General Layouts, Work Descriptions, and Details Spruce Brook
1-15 General Layouts, Work Descriptions, and Details
C-5 – PROSECUTION OF WORK
The Contractor shall conduct work within the work periods shown below, and in accordance with applicable permits or regulations. Activities not otherwise restricted may be scheduled at contractor’s preference, when consistent with material limitations, manufacturer’s instructions, and in accordance with approved work schedule and suitable advance notification as required. Work shall be conducted safely, performed diligently, in a workmanlike manner adhering to Plans and Specifications and instructions, and be completed promptly. Contractor shall not suspend work area prior to implementing appropriate stabilization and site protection measures, and without approval of COR.
ACTIVITY WORK WINDOWS (dates allowed)
START END
Road Closure 06/01 10/15
Stream Disturbance 06/30 09/16 Tree Cutting 08/01 03/31
C-6 – SUBMITTAL AND NOTIFICAITONS
http://flh.fhwa.dot.gov/resources/pse/specs/fp-03/fp-03usc.pdf
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
In addition to submittal of permits, bonds, and other forms required under the contract provisions; below is summary of key submittals and timeline, contractor shall refer to and adhere to applicable submittals and certifications noted in the Plans and Specifications for complete requirements.
Submittal Schedule:
ITEM TIMELINE
o Contractor’s Safety Plan and Traffic Control Plan Upon Issuance of Notice to Proceed o Contractor’s Spill Prevention ,Control, and
Countermeasures Plan Upon Issuance of Notice to Proceed o List of Subcontractors and Suppliers* Upon Issuance of Notice to Proceed o Contractor’s Quality-Control Plan Upon Issuance of Notice to Proceed o List of Emergency contact names, numbers and title of personnel.
2 weeks before mobilization o Manufacturer’s Fabrication Drawings and Design Calculations
21 days prior to production o Construction Schedule 2 weeks before mobilization o Designation of Contractor’s on-site superintendent 2 weeks before mobilization o Aggregate and stone screen reports Prior to hauling and placement o Delivery load slips; such as aggregate, borrow, concrete, and asphalt Upon Delivery o Manufacturing test results and Material Production certifications
As required o Quality control in-place test results As required o Manufacturer’s instructions, Warranty Information, and Supplemental Data Upon Delivery o As-built Drawings Upon Completion o Proper Invoices As required o Progress certifications and quantity measurements With Invoices o Certificates of Payment With Invoices o Certified Payroll Reports Weekly
* "List of Subs & Suppliers" assumes that an Item which meets Specifications as written is supplied. Evaluation of product substitution requires review and approval by the CO/COR, and may require longer schedule.
Notification Schedule:
The following events require an advance written notification to the COR. Notifications may be faxed, mailed, emailed, or hand delivered.
EVENT PRIOR NOTICE REQUIRED
o Change in Schedule As soon as identified o Change in Subcontractors or Suppliers As soon as identified o Intent to close site or alter public traffic 21 days o Intent to mobilize or to suspend 14 days o Intent to dewater or impact streams 14 days o Intent to start excavation 48 hours o Intent to deliver structural components 14 days o Intent to place structure or backfill against structure (including laying pipe) 48 hours o Intent to install incidental or ancillary items As progressing
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Green Products
The contractor must comply with Section 9002 of the Farm Security and Rural Investtment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Enviromental, Energy, and Transportation Management”, and the Federal Acquisition Regulations to provide green products. All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased, recycled content, energy star, and environmentally preferable products.
For more information regarding the Department of Agriculture Biobased Affirmative Procurement Program go to http://www.biopreferred.gov/bioPreferredCatalog/faces/jsp/catalogLanding.jsp
For more information regarding Environmental Protection Agency list of designated products to http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm
For more information regarding Energy Star products go to http://www.energystar.gov/ http://www.biopreferred.gov/bioPreferredCatalog/faces/jsp/catalogLanding.jsp http://www.epa.gov/epawaste/conserve/tools/cpg/products/index.htm http://www.energystar.gov/
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 460 calendar days after the contractor receives the Notice To Proceed. The time stated for completion include final cleanup of the premises.
52.211-12 Liquidated Damages—Construction. (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $490.76 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
http://farsite.hill.af.mil/
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
SECTION G--CONTRACT ADMINISTRATION DATA
AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within ___10___ days after the date of contract award. The conference will be held at __TBD_________.
DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE
The contracting Officer will designate a Contracting Officer's Representative(COR) at the time of award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
On all matters that pertain to the contract terms the contractor must communicate with the Contracting Officer.
Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the contracting officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal for a contract claim.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
Utility Services are available on site, Water & Electric; however the contractor is responsible to ensure reasonable use and to conserve all utilities to the maximum extent possible.
INVOICING
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices are to be submitted online via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Your company must register at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account in order to submit an invoice on this project.
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of
Whistleblower Rights (APR 2014) 52.204-7 System for Award Management (JUL 2013) 52.204-13 System for Award Management Maintenance (JUL 2013) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2013) 52.204-18 Commercial and Government Entity Code Maintenance (NOV 2014) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (DEC 2014) 52.215-2 Audit and Records -- Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (OCT 2014)
Alternate II (Oct 2014) 52.219-14 Limitations on Subcontracting (NOV 2011) 52.219-28 Post Award Small Business Program Rerepresentation (JUL 2013) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2014) 52.222-6 Construction Wage Rate Requirement (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) http://www.acquisition.gov/far/
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-35 Equal Opportunity for Veterans (JUL 2014) 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-54 Employment Eligibility Verification (AUG 2013) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2014) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (Jan 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-12 Refrigeration Equipment and Air Conditioners (May 1995) 52.223-15 Energy Efficiency in Energy Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (MAY
2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2011) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (APR 1984) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL 2013) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR
1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (AUG 1987) 52.244-5 Competition in Subcontracting (Dec 1996) 52.244-6 Subcontracts for Commercial Items (MAR 2015) 52.246-21 Warranty of Construction (MAR 1994)
Alternate I (APR 1984) 52.248-3 Value Engineering – Construction (OCT 2010) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate I (SEP
1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
(Applicable if contract is over $30,000) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011)
(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24 and Federal Information Processing Standards Publication (FIPS PUB) Number 201.
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
(b) The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:
(1) When no longer needed for contract performance.
(2) Upon completion of the Contractor employee’s employment.
(3) Upon contract completion or termination.
(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.
(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor’s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.
52.222-37 Employment Reports on Veterans (JUL 2014)
(a) Definitions. As used in this clause, “Armed Forces service medal veteran,” “disabled veteran,” “active duty wartime or campaign badge veteran,” and “recently separated veteran,” have the meanings given in
FAR 22.1301.
(b) Unless the Contractor is a State or local government agency, the Contractor shall report at least annually, as required by the Secretary of Labor, on—
(1) The total number of employees in the contractor’s workforce, by job category and hiring location, who are disabled veterans, other protected veterans (i.e., active duty wartime or campaign badge veterans), Armed Forces service medal veterans, and recently separated veterans;
(2) The total number of new employees hired during the period covered by the report, and of the total, the number of disabled veterans, other protected veterans (i.e., active duty wartime or campaign badge veterans), Armed Forces service medal veterans, and recently separated veterans; and
(3) The maximum number and minimum number of employees of the Contractor or subcontractor at each hiring location during the period covered by the report.
(c) The Contractor shall report the above items by completing the Form VETS-100A, entitled “Federal Contractor Veterans’ Employment Report (VETS-100A Report).”
(d) The Contractor shall submit VETS-100A Reports no later than September 30 of each year.
(e) The employment activity report required by paragraphs (b)(2) and (b)(3) of this clause shall reflect total new hires, and maximum and minimum number of employees, during the most recent 12–month period preceding the ending date selected for the report. Contractors may select an ending date—
(1) As of the end of any pay period between July 1 and August 31 of the year the report is due; or
(2) As of December 31, if the Contractor has prior written approval from the Equal Employment
Opportunity Commission to do so for purposes of submitting the Employer Information Report EEO-1 (Standard Form 100).
https://acquisition.gov/far/current/html/Subpart%2022_13.html%23wp1085590
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
(f) The number of veterans reported must be based on data known to the contractor when completing the VETS-100A. The contractor’s knowledge of veterans status may be obtained in a variety of ways, including an invitation to applicants to self-identify (in accordance with 41 CFR 60-300.42), voluntary self-disclosure by employees, or actual knowledge of veteran status by the contractor. This paragraph does not relieve an employer of liability for discrimination under 38 U.S.C. 4212.
(g) The Contractor shall insert the terms of this clause in subcontracts of $100,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor.
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
(SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+200+2++%2838%29%20%20AND%20%28%2838%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20
PROJ NAME Bog Dam Loop Road-Stream Crossings Replacement Androscoggin Ranger District
Berlin, New Hampshire
(a) Definitions. As used in this clause— “Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to R9 NEAT Contracting Officer complete in accordance with agency procedures].
FAR 52.225-9 Buy American Act-Construction Materials (MAY 2014)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or…