Revised_Nelli_Schedule_of_Items.pdf
PDF 278 KB Posted
- Attached to
- Nelli Stewardship Federal contract opportunity
- Solicitation number
- AG-05GG-S-14-9001
About this file
Revised Nelli Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Nelli_Amendment_0002.pdf | ||
| Nelli_Stew_amendment_001.pdf | ||
| Attachment_2_NelliStewardshipContractAreaMap.pdf | ||
| Attachment_4_Construction_General_Decision_WA1.txt | TXT text file | |
| Attachment_1_Nelli_Stew_Appendix_A.docx | DOCX document | |
| Attachment_4_Service_Wage_Determination_77-0209.txt | TXT text file | |
| Attachment_1_Nelli_Stew_Appendix_C.docx | DOCX document | |
| Attachment_1_Nelli_Stew_Appendix_D.pdf | ||
| Attachment_1_Nelli_Stew_Appendix_B_Tree_Measurement.docx | DOCX document | |
| Attachment_3_fire_clauses_r6-fs-6300-52.doc | DOC document | |
| Nelli_IRSC_RFP_Construction.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nelli Stewardship AG-05GG-S-14-9001 Page 1 of 6
PART I – THE SCHEDULE
SECTION B – SERVICES AND PRICES
** REVISED SCHEDULE OF ITEMS **
Nelli Stewardship
B.1 REVISED SCHEDULE OF SERVICE ITEMS:
NON –PAY ITEMS
Contractor Name:
ITEM
NO.
DESCRIPTION
BASE WORK ACTIVITIES ACRES
B.1.1
Commercial Harvest Units Includes: felling, skidding, watering and blading and temporary road construction
B.1.1-1 UNIT 1 340
B.1.1-2 UNIT 2 107
B.1.1-3 UNIT 3 24
B.1.1-4 UNIT 4 56
B.1.1-5 UNIT 5 260
B.1.1-6 UNIT 6 28
B.1.1-7 UNIT 7 76
B.1.1-8 UNIT 8 80
B.1.1-9 UNIT 9 4
B.1.1-10 UNIT 10 4
B.1.1-11 UNIT 11 23
B.1.1-12 UNIT 12 73
B.1.1-13 UNIT 13 368
B.1.1-14 UNIT 14 11
B.1.1-15 UNIT 15 10
B.1.1-16 UNIT 16 20
B.1.1-17 UNIT 17 6
B.1.1-18 UNIT 18 13
B.1.1-19 UNIT 19 6
NOTE: Refer to Appendix C for Road Maintenance requirements and specifications for watering and blading.
NOTE: Approximately 0.38 miles of new temporary road construction, and 1.02 miles of existing temporary road opening have been proposed for access to commercial harvest units.
Nelli Stewardship AG-05GG-S-14-9001 Page 2 of 6
B.1 REVISED SCHEDULE OF SERVICE ITEMS CONTINUED:
Contractor Name: _________________________________
Item
No.
Description
Base work activities Unit
Estimated
Quantity
Unit
Price Total
Specified Road Reconstruction
(Davis Bacon)(Credit Earning)
15101 Mobilization
Lump
Sum 1
20104
Clearing and grubbing, disposal of tops and limbs, logs, stumps Acre 4.43
20301 Removal of 18" CMP Each 1
20402
Roadway excavation, compaction method (d), finishing method A Mile 0.06
20420a
Drainage excavation, type rolling dip Each 4
20420b
Drainage excavation, type drain dip Each 6
20429 End Haul
Cubic
Yard 20
25101 Placed riprap, class 1
Yard 20
30304 Road reconditioning, ditch Mile 6.97
30318
Road reconditioning, roadbed, compaction method A Mile 12.31
32203
Aggregate base, grading N, compaction B
Yard 60
60201 18 inch pipe culvert Foot 36
60708 Cleaning culverts in place Each 47
Total Specified Road Reconstruction Cost $
Nelli Stewardship AG-05GG-S-14-9001 Page 3 of 6
B.1 REVISED SCHEDULE OF SERVICE ITEMS CONTINUED:
Contractor Name: _____________________________________
OPTION ITEMS Note: Not all option items will be awarded.
OPTION
ITEM
NO.
DESCRIPTION
BASE WORK ACTIVITIES
UNIT
ESTIMATED
QUANTITY
UNIT
PRICE TOTAL
Hauling of Included
Timber (Service Contract
Act)(Appropriated Dollars)
Hauling Options are identified 00X where X is option number
(Option 1 Saw
Logs)
Hauling of saw log Timber to processing facility located within 50-100 mile radius of
Contract Area. Please list facility where logs will be delivered:
Load 2,016 (Estimated number of saw log loads based on cruise data)
(Option 2
Saw Logs)
Hauling of saw log Timber to processing facility located within 101-150 mile radius of
Contract Area. Please list facility where logs will be delivered:
Load 2,016 (Estimated number of
(Option 3
Saw Logs)
Hauling of saw log Timber to processing facility located within 151-200 mile radius of
Contract Area. Please list facility where logs will be delivered:
Load 2,016 (Estimated number of
(Option 4
Saw Logs)
Hauling of saw log Timber to processing facility located within 201-250 mile radius of
Contract Area. Please list facility where logs will be delivered:
Load 2,016 (Estimated number of
(Option 5
Grn. Bio. Cv.)
Hauling of Green Biomass
Convertible to processing facility located within 50-100 mile radius of Contract Area.
Please list facility where logs will be delivered:
Load 182 (Estimated number of
Grn. Bio. Cv. loads based on cruise data)
(Option 6
Grn. Bio. Cv.)
Hauling of Green Biomass
Convertible to processing facility located within 101-150 mile radius of Contract Area.
Please list facility where logs will be delivered:
Load 182 (Estimated number of
Nelli Stewardship AG-05GG-S-14-9001 Page 4 of 6
B.1 REVISED SCHEDULE OF SERVICE ITEMS:
SERVICES AND PRICES (continued)
Contractor Name
Hauling Options Continued
ITEM
NO.
DESCRIPTION
BASE WORK ACTIVITIES UNIT
ESTIMATED
QUANTITY
UNIT
PRICE TOTAL
Hauling of Included
Timber (Service Contract
Act)(Appropriated Dollars)
(Option 7
Grn. Bio.
Cv.)
Hauling of Green Biomass
Convertible to processing facility located within 151-
200 mile radius of Contract
Area. Please list facility where logs will be delivered:
(Option 8
Grn. Bio.
Cv.)
Hauling of Green Biomass
Convertible to processing facility located within 201-
250 mile radius of Contract
Area. Please list facility where logs will be delivered:
2A Hauling of all Included
Timber from helicopter
Payment Units.
Acre 892 Acres
Lump Sum Cost
2B Hauling of all Included
Timber from ground based
Payment Units.
Acre 617 Acres
Lump Sum Cost
Total AVERAGE Hauling Option Saw Log (001 to 004) Cost $
Total AVERAGE Hauling Option Grn Bio CV (005 to 008) Cost $
Total Option Item 2 A $
Total Option Item 2 B $
Nelli Stewardship AG-05GG-S-14-9001 Page 5 of 6
ITEM
NO.
DESCRIPTION
BASE WORK ACTIVITIES
UNIT
ESTIMATED
UNIT
PRICE TOTAL
Erosion Control (Ripping & Seeding of landings, temporary roads, and skid trails)(Service Contract
Act)(Credit Earning)
3.1
Temporary Roads, 1.4 miles of
Ripping (2 passes) Mile 2.8
3.2 Skid Trails, 6.0 miles of ripping Mile 6.0
3.3 Landings, Ripping Acres 21
3.4
Temporary Roads, 1.4 miles of seeding Mile 1.4
3.5 Skid Trails, 6.0 miles of seeding Mile 6.0
3.6 Landings, Seeding Acres 12
Total Erosion Control $
TOTAL ALL SERVICE ITEMS
(Including average of Option for Saw Logs and average of Grn Bio CV)
NOTE: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.
NOTE: Rates submitted for Item B.2 are not subject to escalation.
NOTE: Price Proposals MUST be provided on ALL Items in Schedules B.1, Base Work Activities and
B.2, Timber Products Price Schedule.
NOTE: Option Item(s) will be evaluated and considered at the time of award. See Section M for additional information on the Evaluation of Options. Option Item(s) shall be awarded based on the availability of funding. Options Item(s) for haul may be exercised on a timber operating season basis, B.2 TIMBER PRODUCT PRICE SCHEDULE:
SPECIES
PRODUCT
UNIT OF
MEASURE
MINIMUM
ACCEPTAB
LE OFFER
OFFER
(FLAT)
TOTAL
OFFER
Douglas Fir and other
Coniferous
Species
Sawtimber 19,735 CCF $15.91 $ $
All
Green
Biomass
Convertible
50 CCF $0.25 $ $
TOTAL TIMBER/PRODUCT PRICE $
Nelli Stewardship AG-05GG-S-14-9001 Page 6 of 6 dependent on market conditions. Contractor and Government shall mutually agree on haul location each timber operating season through modification. Offerors shall submit a unit price for all units listed, including option items, to be considered responsive. Prices for option items shall be fixed at the time of contract award, but haul locations may change each timber operating season as mutually agreed upon. The unit prices as quoted in the Schedule of Items will be used in exercising any of the option items.
NOTE: Option Items 2, 2A and 2B shall be considered at the time of award in conjunction with haul proposal. One option item or combinations of different options items shall be considered. Award may be based on only one option item, or a combination of option items depending on available funding and best value to the Government.
File details come from the government source that posted it. Updated .