Revised Nelli Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Nelli Stewardship, newest first.
File Type Posted
Nelli_Amendment_0002.pdf PDF
Nelli_Stew_amendment_001.pdf PDF
Attachment_2_NelliStewardshipContractAreaMap.pdf PDF
Attachment_4_Construction_General_Decision_WA1.txt TXT text file
Attachment_1_Nelli_Stew_Appendix_A.docx DOCX document
Attachment_4_Service_Wage_Determination_77-0209.txt TXT text file
Attachment_1_Nelli_Stew_Appendix_C.docx DOCX document
Attachment_1_Nelli_Stew_Appendix_D.pdf PDF
Attachment_1_Nelli_Stew_Appendix_B_Tree_Measurement.docx DOCX document
Attachment_3_fire_clauses_r6-fs-6300-52.doc DOC document
Nelli_IRSC_RFP_Construction.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nelli Stewardship AG-05GG-S-14-9001 Page 1 of 6

PART I – THE SCHEDULE

SECTION B – SERVICES AND PRICES

** REVISED SCHEDULE OF ITEMS **

Nelli Stewardship

B.1 REVISED SCHEDULE OF SERVICE ITEMS:

NON –PAY ITEMS

Contractor Name:

ITEM

NO.

DESCRIPTION

BASE WORK ACTIVITIES ACRES

B.1.1

Commercial Harvest Units Includes: felling, skidding, watering and blading and temporary road construction

B.1.1-1 UNIT 1 340

B.1.1-2 UNIT 2 107

B.1.1-3 UNIT 3 24

B.1.1-4 UNIT 4 56

B.1.1-5 UNIT 5 260

B.1.1-6 UNIT 6 28

B.1.1-7 UNIT 7 76

B.1.1-8 UNIT 8 80

B.1.1-9 UNIT 9 4

B.1.1-10 UNIT 10 4

B.1.1-11 UNIT 11 23

B.1.1-12 UNIT 12 73

B.1.1-13 UNIT 13 368

B.1.1-14 UNIT 14 11

B.1.1-15 UNIT 15 10

B.1.1-16 UNIT 16 20

B.1.1-17 UNIT 17 6

B.1.1-18 UNIT 18 13

B.1.1-19 UNIT 19 6

NOTE: Refer to Appendix C for Road Maintenance requirements and specifications for watering and blading.

NOTE: Approximately 0.38 miles of new temporary road construction, and 1.02 miles of existing temporary road opening have been proposed for access to commercial harvest units.

Nelli Stewardship AG-05GG-S-14-9001 Page 2 of 6

B.1 REVISED SCHEDULE OF SERVICE ITEMS CONTINUED:

Contractor Name: _________________________________

Item

No.

Description

Base work activities Unit

Estimated

Quantity

Unit

Price Total

Specified Road Reconstruction

(Davis Bacon)(Credit Earning)

15101 Mobilization

Lump

Sum 1

20104

Clearing and grubbing, disposal of tops and limbs, logs, stumps Acre 4.43

20301 Removal of 18" CMP Each 1

20402

Roadway excavation, compaction method (d), finishing method A Mile 0.06

20420a

Drainage excavation, type rolling dip Each 4

20420b

Drainage excavation, type drain dip Each 6

20429 End Haul

Cubic

Yard 20

25101 Placed riprap, class 1

Yard 20

30304 Road reconditioning, ditch Mile 6.97

30318

Road reconditioning, roadbed, compaction method A Mile 12.31

32203

Aggregate base, grading N, compaction B

Yard 60

60201 18 inch pipe culvert Foot 36

60708 Cleaning culverts in place Each 47

Total Specified Road Reconstruction Cost $

Nelli Stewardship AG-05GG-S-14-9001 Page 3 of 6

B.1 REVISED SCHEDULE OF SERVICE ITEMS CONTINUED:

Contractor Name: _____________________________________

OPTION ITEMS Note: Not all option items will be awarded.

OPTION

ITEM

NO.

DESCRIPTION

BASE WORK ACTIVITIES

UNIT

ESTIMATED

QUANTITY

UNIT

PRICE TOTAL

Hauling of Included

Timber (Service Contract

Act)(Appropriated Dollars)

Hauling Options are identified 00X where X is option number

(Option 1 Saw

Logs)

Hauling of saw log Timber to processing facility located within 50-100 mile radius of

Contract Area. Please list facility where logs will be delivered:

Load 2,016 (Estimated number of saw log loads based on cruise data)

(Option 2

Saw Logs)

Hauling of saw log Timber to processing facility located within 101-150 mile radius of

Contract Area. Please list facility where logs will be delivered:

Load 2,016 (Estimated number of

(Option 3

Saw Logs)

Hauling of saw log Timber to processing facility located within 151-200 mile radius of

Contract Area. Please list facility where logs will be delivered:

Load 2,016 (Estimated number of

(Option 4

Saw Logs)

Hauling of saw log Timber to processing facility located within 201-250 mile radius of

Contract Area. Please list facility where logs will be delivered:

Load 2,016 (Estimated number of

(Option 5

Grn. Bio. Cv.)

Hauling of Green Biomass

Convertible to processing facility located within 50-100 mile radius of Contract Area.

Please list facility where logs will be delivered:

Load 182 (Estimated number of

Grn. Bio. Cv. loads based on cruise data)

(Option 6

Grn. Bio. Cv.)

Hauling of Green Biomass

Convertible to processing facility located within 101-150 mile radius of Contract Area.

Please list facility where logs will be delivered:

Load 182 (Estimated number of

Nelli Stewardship AG-05GG-S-14-9001 Page 4 of 6

B.1 REVISED SCHEDULE OF SERVICE ITEMS:

SERVICES AND PRICES (continued)

Contractor Name

Hauling Options Continued

ITEM

NO.

DESCRIPTION

BASE WORK ACTIVITIES UNIT

ESTIMATED

QUANTITY

UNIT

PRICE TOTAL

Hauling of Included

Timber (Service Contract

Act)(Appropriated Dollars)

(Option 7

Grn. Bio.

Cv.)

Hauling of Green Biomass

Convertible to processing facility located within 151-

200 mile radius of Contract

Area. Please list facility where logs will be delivered:

(Option 8

Grn. Bio.

Cv.)

Hauling of Green Biomass

Convertible to processing facility located within 201-

250 mile radius of Contract

Area. Please list facility where logs will be delivered:

2A Hauling of all Included

Timber from helicopter

Payment Units.

Acre 892 Acres

Lump Sum Cost

2B Hauling of all Included

Timber from ground based

Payment Units.

Acre 617 Acres

Lump Sum Cost

Total AVERAGE Hauling Option Saw Log (001 to 004) Cost $

Total AVERAGE Hauling Option Grn Bio CV (005 to 008) Cost $

Total Option Item 2 A $

Total Option Item 2 B $

Nelli Stewardship AG-05GG-S-14-9001 Page 5 of 6

ITEM

NO.

DESCRIPTION

BASE WORK ACTIVITIES

UNIT

ESTIMATED

UNIT

PRICE TOTAL

Erosion Control (Ripping & Seeding of landings, temporary roads, and skid trails)(Service Contract

Act)(Credit Earning)

3.1

Temporary Roads, 1.4 miles of

Ripping (2 passes) Mile 2.8

3.2 Skid Trails, 6.0 miles of ripping Mile 6.0

3.3 Landings, Ripping Acres 21

3.4

Temporary Roads, 1.4 miles of seeding Mile 1.4

3.5 Skid Trails, 6.0 miles of seeding Mile 6.0

3.6 Landings, Seeding Acres 12

Total Erosion Control $

TOTAL ALL SERVICE ITEMS

(Including average of Option for Saw Logs and average of Grn Bio CV)

NOTE: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.

NOTE: Rates submitted for Item B.2 are not subject to escalation.

NOTE: Price Proposals MUST be provided on ALL Items in Schedules B.1, Base Work Activities and

B.2, Timber Products Price Schedule.

NOTE: Option Item(s) will be evaluated and considered at the time of award. See Section M for additional information on the Evaluation of Options. Option Item(s) shall be awarded based on the availability of funding. Options Item(s) for haul may be exercised on a timber operating season basis, B.2 TIMBER PRODUCT PRICE SCHEDULE:

SPECIES

PRODUCT

UNIT OF

MEASURE

MINIMUM

ACCEPTAB

LE OFFER

OFFER

(FLAT)

TOTAL

OFFER

Douglas Fir and other

Coniferous

Species

Sawtimber 19,735 CCF $15.91 $ $

All

Green

Biomass

Convertible

50 CCF $0.25 $ $

TOTAL TIMBER/PRODUCT PRICE $

Nelli Stewardship AG-05GG-S-14-9001 Page 6 of 6 dependent on market conditions. Contractor and Government shall mutually agree on haul location each timber operating season through modification. Offerors shall submit a unit price for all units listed, including option items, to be considered responsive. Prices for option items shall be fixed at the time of contract award, but haul locations may change each timber operating season as mutually agreed upon. The unit prices as quoted in the Schedule of Items will be used in exercising any of the option items.

NOTE: Option Items 2, 2A and 2B shall be considered at the time of award in conjunction with haul proposal. One option item or combinations of different options items shall be considered. Award may be based on only one option item, or a combination of option items depending on available funding and best value to the Government.