REQUEST FOR QUOTATION (4/98) THIS RFQ X IS IS NOT A SMALL BUSINESS SET- ASIDE PAGE OF PAGES
(THIS IS NOT AN ORDER) * 1
1. REQUEST NO. 2. DATE
ISSUED
3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
RFQ
AG-05G1-S-12-0019
8/14/2012
06EW211253161
Requisition 604101
UNDER BDSA REG. 2 ---->
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date)
USDA, Forest Service Reference Specifications
Colville National Forest Contract Time: 90 Calendar Days
765 South Main Estimated start date: October 2012
Colville, Washington 99114 5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY
NAME TELEPHONE NUMBER FOB DESTINATION X OTHER
(See Schedule)
AREA CODE NUMBER
Cathy E. Van Alyne, Contracting Officer
509 684.7114 9. DESTINATION
Colville National Forest
Jennifer Knutson, Gen Info: 509 684.7254 a. NAME OF CONSIGNEE
8. TO: Supervisor Office
a. NAME b. COMPANY b. STREET ADDRESS
765 South Main
c. STREET ADDRESS c. CITY
Colville
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
Washington 99114
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR BEFORE
September 4, 2012 3:00 p.m.
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5A. This Request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
Wiring and Telecommunications, Colville National Forest Supervisor’s Office.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(a) (b) (c) (d) (e) (f)
Insert your prices on page 2.
BASIS OF AWARD: One or more contracts will be awarded, by item, to the Offeror(s) providing the best over-all value to the Government. Past performance, experience, capacity and technical ability to meet the requirements, price and other factors will be considered in evaluation for award.
Return the pages 1 through 3 and 29 through 40 when submitting your quotes. Return to the address shown in block 5a. On your enclosed sealed envelope, please write RFQ AG-05G1-S-12-0019 due September 4, 2012.
Faxes will be accepted (with hard copy to follow) until close of business on the due date of this solicitation. Fax number is 509.684.7280. It is the quoters responsibility to verify fax has been received.
DUNS Number ________________________________________[See Representation, Certifications and Provisions (FAR 52.204-6)
Procurement will be accomplished under Simplified Procurement procedures. All responsible and qualified sources may submit a quotation. Quotations submitted are considered to be confidential. The name of the Contractor and the amount of the contract will be disclosed only after an order has been issued.
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT
NUMBER PERCENTAGE
XXXXXXXXX
NOTE: Additional provisions and representations X are are not attached.
13. NAME AND ADDRESS OF OFFEROR 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME SIGN OFFER OFFER
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY ( )
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) FAX
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (Rev. 6-95)
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 2
PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Wiring and Telecommunications
Supervisor’s Office
Colville National Forest
Stevens County, Washington
The quoter must quote on all items. Award will be on an all or none basis to quoter whose quote represents the best value to the Government, price and other factors considered (reference Section M). If quoter does not intend to charge for an item, an “O” or “No Cost” should be shown. If the price is left blank or shown as “No Bid”, the entire offer (quote) may be considered Non-Responsive.
ITEM
NO.
DESCRIPTION
METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
Demo of CAT3 and
CAT5 Wiring
LSQ
02 Installation of CAT6
Wiring, Jacks, Outlets
EA 1 180 $________ $___________
03 Installation of Patch
Panels, Fiber Optic (FO)
Runs, Fiber Optic Patch
Panels and Patch Cables.
LSQ 1 1 $________ $___________
Total Quote (All Items) $___________
**Designated Method of Measurement:
LSQ - Lump Sum Quantities. These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
EA – Each. Price per Quantity of One.
Pre-Proposal Tour
A Pre-Proposal Site visit will be conducted on August 24, 2012. The tour will start at 1:00 p.m at the site.
Please RSVP to Cathy VanAlyne at cvanalyne@fs.fe.us with your intent to attend and the pre-proposal tour. If you have any questions, please provide them to Cathy so your questions may be answered during the tour.
mailto:cvanalyne@fs.fe.us
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 3
Price Range
The Government’s estimate is between $100,000 to $250,000. This requirement is being solicited under the
Simplified Acquisition Procedures (SAP) which is limited to projects under $150,000.
If quotes come in over $150,000 the Government has the right to negotiate a reduction in the quantity for Item 02 to keep the price under the SAP threshold.
Payment Security
If the project is quoted with a total price greater than $30,000, payment security is required in the form of a
Payment Bond or Letter of Credit at 100% of the total project price. Reference Section I.
Payment for Bond Premiums
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed – Price Construction
Contracts shall not be in addition to the contract price. Include bond payments under Item 01.
Central Contractor Registration (CCR) and Online Representatives and Certification Applications
(ORCA).
No award will be made to a Contractor not registered in the Central Contractor Registration (CCR) and the
Online Representations and Certification Application (ORCA) databases. Reference https://www.acquisition.gov.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 4
SECTION C - DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
Description of Work or Scope of Contract
This project consists of, but is not limited to, removing existing telecom wall outlet, jacks, and building CAT3 and CAT5 wiring and installing new wall outlets, jacks, building CAT6 wiring, patch panels, fiber optic wiring and fiber optic patch panels.
Project Location
Project is located in the Colville National Forest Supervisor’s Office, 765 South Main, Colville, Washington.
See attached maps for exact location.
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
Applicable Specifications
The Specifications shown in the specification listing contained in the attachments are applicable to this contract.
All specifications not included in the specification listing, but referenced by listed specifications, are applicable.
The Specifications shown on the specification list are physically attached to this contract.
Special Project Specifications
Special Project Specifications applicable to this contract are attached in Section J.
260010 General Technical Provisions
260050 Basic Methods and Materials
270000 Telecommunications Wiring System
Project Drawings
The attached listed drawings (3 pages) are part of this solicitation and any resultant contract.
G-1 Title Sheet
A-1 Building #2002 Telecom
T-1 Telecom Details
BioBased Products
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 5
Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer.
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulating foam
Concrete and asphalt release fluids Fluid-filled transformers
Wood and concrete sealers Composite panels
Adhesive and mastic removers Carpets
Roof coatings Hydraulic fluid
Water tank coatings
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov.
The Contractor should provide data for their biobased products such as biobased content and source of biobased material (i.e. particular carpet).
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred
Program, the Contractor is encouraged to use other commercially available biobased products.
The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of the contract. The Contractor shall list volume to be used and the total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products
Under Service and Construction Contracts.
NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.
The product guides which define standard operating procedures for instructing staff in the proper use, storage, and disposal of biobased products; proper maintenance of equipment; and other procedures/instructions to accomplish work under this contract.
The Contractor shall provide data on the quantity and dollar values of biobased products used in this contract.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 6
The data will be submitted to the Contracting Officer quarterly.
A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.
Therefore we will look for a Contractor who will 1) demonstrate products, and 2) when selected, offer any necessary training to all of the construction staff and 3) be available with technical assistance to trouble shoot problems.
Recycling
The Contractor shall recycle the wire they pull from the building.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 7
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 8
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984)
52.246-12 Inspection of Construction (AUG 1996) http://www.arnet.gov/far/
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 9
SECTION F--DELIVERIES OR PERFORMANCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days from the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
the time specified in the offer.
AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996)
Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is 40 hours per week.
Suspension for Other than Government Convenience
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to become muddy or unsuitable; or (2) Failure of the
Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements.
Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 10 caused by his/her operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall no be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.
Notice to Proceed
A Notice to Proceed will be issued in writing by the Contracting Officer. No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.
Required Submittals
The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.
Submittal Title Referenced By
Specification No.
Submittal Date
Schedule of Work Section F Prior to Work Starting
Job Safety Plan Section H With Quote and Update as Necessary
Notification of Subcontracting Section G Prior to Subcontractor Starting Work
Release of Claims Form Section I Prior to Final Payment
Project Drawings Specifications As Required in Specifications
Any as Required by Specifications Specifications As Required in Specifications
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 11
SECTION G - CONTRACT ADMINISTRATION DATA
AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held after the date of contract award. The conference will be held at Colville National Forest Supervisor’s Office, 765 South Main, Colville, WA 99114.
Note: Post Award Conference
The Contractor shall meet with the Government to discuss contract terms and work performance requirements, Work Progress Schedule, and Fire Prevention and Suppression Plans.
Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the conference.
Supplemental Definitions
Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
A. Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.
B. Change Order - An order issued to the Contractor by the Contracting Officer, pursuant to the “change” clause included in Section I of this contract, requiring work to be performed, within the general scope of the contract.
C. Clearing Limits - The limits of clearing as designated on the ground, shown on the drawing or designated in the Special Project Specifications.
D. Contract Pay Item - A pay item designated on the bid schedule and described by a specification.
E. Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.
F. Contracting Officer's Representative (COR) - The on-site contract administrator for the Contracting Officer.
The duties and responsibilities of the Contracting Officer’s Representatives are defined below in this Section or in a letter of designation issued by the Contracting Officer.
G. Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 12
H. Drawings - The approved documents and reproductions of these documents, including plan and profile sheets, cross sections, site plants, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, and similar documents showing details for construction of a facility.
I. Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.
J. Inspector - The person(s) appointed in writing by the Contracting Officer’s Representative to conduct and document inspections according to contract specifications and provisions. The inspector’s authorities are strictly limited, not to exceed the authority to issue to the Contractor a Notice of Noncompliance.
K. Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor’s employees and employment practices.
L. Materials - Any substances for use in the construction of the project and its appurtenances.
M. Notice of Noncompliance - A written notice from the Contracting Officer’s representative or inspector which documents, for the Contractor’s attention, specific performance deficiencies.
N. Original Contract Quantities - Those quantities shown in the Schedule of Items as awarded.
O. Right of Way - A general term denoting land, property, or interest therein acquired for or devoted to a road or a construction site.
P. Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.
Q. Special Project Specifications - Specifications which detail the conditions and requirements peculiar to the individual project, including but not limited to CSI format specifications and additions and revisions to Standard
Specifications.
R. Specifications - A general term applied to all written directions and requirements pertaining to performance of work.
S. Standard Specifications - Specifications established for Region wide use for construction of facilities which cover most items of work likely to be performed; such as Earthwork, Base Courses, Pavement, Concrete, etc.
T. Utility Services - Are services such as electricity, gas, steam, water and sewage.
U. Work Order - An order written by the Contracting Officer or Contracting Officer’s Representative, which directs the Contractor to correct deficient performance. It may also be used to document acceptable completion of units and to approve starting on additional work units.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 13
Designation of Contracting Officer's Representative
A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award. The name will be designated on a letter or form.
B. The Contracting Officer’s Representative is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.
C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the
Contracting Officer’s Representative provided they do not affect the delivery schedule or performance period stated in the contract.)
D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting
Officer. Whenever, in the opinion of the Contractor, the Contracting Officer’s Representative requests effort outside the scope of the contract, the Contractor should so advise the Contracting Officer’s Representative. If the
Contracting Officer’s Representative persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits.
Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
E. The Contracting Officer’s Representative's major duties and responsibilities are contained in the Forest
Service Handbook of Contract Administration. The Contracting Officer’s Representative is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:
1. Approve Change Orders and Modifications
2. Take action to terminate the contract for default or Government convenience.
3. Make contract adjustments under the Differing Site Conditions clause.
4. Grant extensions of contract time.
5. Approve assignment of claims.
6. Make final decisions under the Disputes clause.
7. Make final acceptance under the contract.
8. Make final decisions under the Suspension of Work clause.
9. Make equitable adjustments.
10. Authorize change in amount of Payment Retention.
11. Approve subcontractors.
12. Approve payments with deductions or final payment.
13. Approve use and possession prior to completion.
14. Enforce the warranty provisions.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 14
Notification of Subcontracting
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement.
The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:
A. The name, address and telephone number of the subcontractor.
B. The date upon which the subcontract was entered into and its duration.
C. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
D. Documentation of the subcontractor's representative authority.
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
Public Officials Not Personally Liable
There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 15
SECTION H -- SPECIAL CONTRACT REQUIREMENTS
FAR 52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
A. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observations and measurements.
B. Other Physical Data: This project is inside a working office of the Forest Service and within the working space of approximately 70 employees. There is office furniture in the front of outlets that will need to be moved and replaced at the completion of the contract. The Government will have to negotiate with the Forest Service
Union on certain dates. A Government employee must be in the building when the Contractor is working.
Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph
(I) below.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 16
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the
Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting
Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the
Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the
Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
Warning Signs and Restrictions
Contractor shall be totally responsible for safety signing, barricades and other signing to maintain a safe site to the public and Government employees.
Safety
Prior to allowing any work to commence on the project, the Contractor shall submit a Safety Plan to the
Contracting Officer that is in accordance with OSHA Regulations. Such safety plan shall include all tasks and related activities anticipated to successfully complete the work.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 17
Safety Items
(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the
Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
(b) The following checked activities have been identified by the Government as potential safety hazards.
[X] Confined Entry Space.
[] Temporary excavation/deep trenching/slope stability.
[] Tree Felling.
[X] Fall hazard from work heights exceeding six feet.
[] Blasting.
[] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
[] Heavy equipment operation.
[] Tree climbing and/or tower climbing.
[] Fire hazards.
[] Hazard materials handling.
[X] Electrical hazard.
[] Hydraulic and/or pneumatic and/or other high pressure hazards.
[X] Mechanical hazards such as pulleys, springs, etc.
[X] Power tool operation including eye protection.
[X] Overhead hazards.
FSAR 4G52.222-704 Personal Protective Equipment (FEB 2007)
1. The Contractor will train in the safe operation and use of equipment to all workers using such equipment.
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The Contractor shall provide, at no cost to the employee, to each employee who operates a chain saw, chain saw chaps and assure the chaps are worn during saw operations. These chaps must be approved by Underwriters
Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh to the top of the boot on each leg.
5. The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 18
6. The Contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
7. The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-
2003.
8. The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.
Storage of Materials and Equipment
Materials shall be stored to assure the preservation of their quality and fitness for work. Approved portions of the right-of-way or other areas on Government land may be used for storage purposes. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.
Use of Premises
A. The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.
Product Substitution, Shop Drawings and Material Certification
A. Product Substitution. Any modification of other items, designs, materials, products or equipment (including
Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the
Contractor without adjustment in contract price or time. The Contracting Officer’s approval of any substitute will not affect the Contractor’s responsibility for such modification. All substitutions shall be requested by the
Contractor after award of the contract has been made. No approvals will be made prior to award.
B. Shop Drawings: See Special Project Specifications.
C. Material Certification: See Special Project Specifications.
Prosecution of Work
A. The following special controls will affect the Contractor’s prosecution of work: This project is inside a working office of the Forest Service and within the working space of approximately 70 employees. There is obstacles in front of outlets including office furniture, printers, copy machines and the like that will need to be moved and replaced at the completion of the contract.
B. The Contractor may encounter other contractors performing work on projects in the area (ground maintenance, janitorial services, HVAC services, etc.).
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 19
C. Utilities made available by the Government for use by the Contractor are: electricity and sanitation.
Hazardous Materials
Contractor shall notify the Government of any hazardous materials and or waste (as defined in 29 CFR
1910.1200) to be used on the job and will have Material Safety Data Sheets (MSDSs) for those materials available on the job. All such materials shall be labeled in accordance with Federal and State regulations.
Disposal of Material
Debris encountered in the construction (metals, etc.) and other waste materials generated in the construction
(cartons, scrap, etc.) shall be removed and disposed of in a State or County approved site off of National Forest
Service Land, unless other disposal means are authorized in the plans or specifications.
AGAR 452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel: Installer for Specification 27 0000
(Telecommunication and Wiring).
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the
Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 20
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
52.204-7 Central Contractor Registration (FEB 2012)
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards FEB 2012) (Applicable if over $25,000 unless award is made to an individual)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010)
(Applicable if contract exceeds $30,000)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012)
52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (AUG 1998)
52.211-18 Variation in Estimated Quantity (APR 1984)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)
52.219-14 Limitation on Subcontracting (NOV 2011
52.219-28 Post-Award Small Business Program Rerepresentation (APR 2012)
52.222-3 Convict Labor (JUN 2003)
52.222-6 Davis-Bacon Act (JUL 2005)
52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JUNE 2010)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005)
52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-20 Walsh-Healy Public Contracts Act (OCT 2010) (Applicable if contract exceeds $15,000)
52.222-21 Prohibition of Segregated Facilities (FEB 1999) (Applicable if contract exceeds $10,000)
52.222-26 Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) (Applicable if contract exceeds $10,000)
52.222-35 Equal Opportunity for Veterans (SEP 2010) http://www.usda.gov/procurement/policy/agar.html
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 21
52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010) (Applicable if contract exceeds $15,000)
52.222-37 Employment Reports Veterans (SEP 2010)
52.222-50 Combating Trafficking in Persons (FEB 2009)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
(JUL 2012) (In Blank insert Contracting Officer)
52.223-3 Hazardous Material Identification and Hazardous Material Safety Data (JAN 1997)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual)
52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $30,000)
52.228-11 Pledges of Assets (JAN 2012) (Applicable if contract exceeds $30,000)
52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) (Applicable if contract exceeds $30,000)
52.228-14 Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000)
52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)
52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (OCT 2008)
52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)
52.233-1 Disputes (JULY 2002)--Alternate I (DEC 1991)
52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991)
52.236-15 Schedules for Construction Contracts (APR 1984)
52.236-16 Quantity Surveys (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate I (APR 1984)
52.236-26 Preconstruction Conference (FEB 1995)
52.243-5 Changes and Changed Conditions (APR 1984)
52.244-6 Subcontracts for Commercial Items (DEC 2010)
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 22
52.245-1 Government Property (APR 2012)
52.245-2 Government Property Installation Operations Services (APR 2012)
52.245-9 Use and Charges (APR 2012)
52.246-21 Warranty of Construction (MAR 1994)
Alternate I (APR 1984)
52.249-1 Termination for Convenience of the Government (Fixed-Price)
(Short From) (APR 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984)
52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
(Applicable if contract exceeds $30,000)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)
452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
AGAR 452.209-71 Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate
Applicants (Feb 2012) Alternate I (Feb 2012)
(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-
74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the
United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
FAR 52.225-9 Buy American Act - – Construction Materials (SEP 2010)
(a) Definitions. As used in this clause--
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 23
“Commercially available off-the-shelf (COTS) item”
(1) Means any item of supply (including construction material) that is -
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace, and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. Appr.
1702), such as agricultural products and petroleum products.
“Component” means any article, material, or supply incorporated directly into construction materials.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States, if –
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic, or
Wiring and Telecommunications RFQ AG-05G1-S-12-0019
Covlille National Forest Supervisor’s Office Page 24
(ii)The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy
American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .