4-ProjectA-TaskOrder-AG04T0S130028.pdf

PDF 130 KB Posted

Attached to
Multi-Agency Facilities Construction & Maintenance IDIQ Federal contract opportunity
Solicitation number
AG-04T0-S-13-0028
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Project A-Task ORder

View the file

Other files for this federal contract opportunity

Other files attached to Multi-Agency Facilities Construction & Maintenance IDIQ, newest first.
File Type Posted
1-IDIQ-CompleteSolicitation-AG04T0S130028.pdf PDF
3-IDIQ-VicinityMaps-AG04T0S130028.pdf PDF
5-ProjectA-StatementWork-AG04T0S130028.pdf PDF
6-ProjectA-CSISpecificiations-AG04T0S130028.pdf PDF
2-IDIQ-ContractorReturnPackage-AG04T0S130028.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project A – Willamette NF Roofing

INDIVIDUAL PROJECT TASK ORDER

Contract Number Individual Project Task Order Number This Individual Project Task Order is issued under contract number:

TBD

AG-04T0-S-13-0028

Project A

ISSUING OFFICE: (Forest Service Unit Name) Task Order Date Siuslaw National Forest Service 3200 SW Jefferson Way Corvallis, OR 97331

Financial obligations and payments shall be processed via the Issuing Office.

PROJECT:

PROJECT NAME: Willamette NF Roofing McKenzie River and Detroit Ranger Districts, Willamette National Forest Itemized payment items, quantities, prices and detailed project requirements are attached The Government’s estimate is between $25,000 and $100,000.

Proposal Request Date: 7/15/2013

Proposal Response Date/Time (close of business unless otherwise shown): 8/15/2013 @ 4:00 pm PST (Include with your proposal reponse to Solicitation AG-04T0-S-13-0028)

A BID GUARANTEE is required for all offers exceeding $150,000.00.

OFFER:

Offeror Name (same as on contract) Offered by (Name, Title, Phone):

Offered Amounts attached in Section B. Authorized Signature:

Date:

This is a firm offer for 30 calendar days from the Response Date/Time. The offer agrees to furnish any required bonds and to perform the work at the prices offered.

AWARD:

ITEMS ACCEPTED:

TOTAL

AMOUNT: $

Task Order Number and Award Date shown at top.

Ordered by (Name, Title, Phone): Authorized Signature

Task Order Contracting Officer

This project includes the terms and conditions of the basic contract as supplemented by the attached project-specific requirements.

TABLE OF CONTENTS

C O NTRAC T SECTION BEING SUP PLEME NTED T ASK O R DE R PAGE

Section B – Services and Prices 3 Section C – Statement of Work 4 Section D – Packaging and Marking Not Applicable Section E – Inspection and Acceptance No Additions Section F – Deliveries or Performance 5

Section G – Contract Administration Data No Additions Section H – Special Contract Requirements 6

Section I – Contract Clauses No Additions Section J – Attachments 7

Section L – Instructions, Conditions, and Notices To Offerors or Respondents

Section M – Evaluation Factors for Award 9 Questionnaire 10

Existing contract clauses are supplemented and new contract clauses may be added.

SECTION B – SERVICES AND PRICES

(Detailed List of Payment Items, Quantities, Units, Unit Prices, and Amounts)

PART I ‐ SCHEDULE OF ITEMS

Willamette NF Roofing

McKenzie River and Detroit Ranger Districts Willamette National Forest

B‐ 1 ‐ SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

PRICE

012000‐1

Mobilization (McKenzie River Ranger District) Lump Sum ALL $________

012000‐2

Mobilization (Detroit Ranger District) Lump Sum ALL $________

074110‐1

Standing Seam Metal Roofing (Bldg 1337) Lump Sum ALL $________

074110‐2

Standing Seam Metal Roofing (Bldg 1338) Lump Sum ALL $________

074110‐3

Standing Seam Metal Roofing (Horse Creek Pump House) Lump Sum

ALL

074110‐4

Standing Seam Metal Roofing (Bldg 1824) Lump Sum ALL $________

074110‐5

Standing Seam Metal Roofing (Bldg 2608) Lump Sum ALL $________

073110‐1

Asphalt Shingles (Bldg 2805) Lump Sum ALL $________

B‐2 ‐ NOTE:

Payment for bond premiums in accordance with Clause 52.232‐5, Payments under Fixed‐Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 012000 – Mobilization.

SE CTI O N C – STATEM ENT O F W O R K

C-1 PROJ E CT SCOPE

See attached “Statement of Work” document in Section J.

C-2 PROJECT LOCATION

See attached “Statement of Work” document in Section J.

C-6 SPE C I FI C AT I O NS AP PL I C ABL E T O T H I S INDI VI DUAL PROJECT

The attached “CSI Specification Index” and “CSI Specifications” apply.

C-8 PRODUCT SAMPLES AND/OR SUBMITTALS

The following product samples and/or submittals are required for this project:

Title Referenced by

Specification No Time of Government Approval After Submittal

Product Data Section 073110 10 Working Days Maintenance Data Section 073110 10 Working Days Warranties Section 073110 10 Working Days Catalog Cuts/Brochures Section 073110 10 Working Days Color Samples Section 073110 10 Working Days Catalog Cuts/Brochures Section 074110 10 Working Days Color Samples Section 074110 10 Working Days Samples for Initial Selection Section 076210 10 Working Days

C-9 SHOP DRAWINGS

The following shop drawings shall be submitted on this project: N/A

C-10 MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project: N/A

SECTION F – DELIVERIES OR PERFORMANCE

F-5 FAR 52.211-10 CO M M ENC EMENT, PR O SECUTIO N, AND C O M P LETIO N

O F W O R K / ALTERNATE I

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendars days after issuance of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

Estimated Start Work date: Mid-September 2013

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-1 PHYSICAL DATA (FAR 52.236-4) (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the Plans and in the specifications are the result of the site survey as shown on the Plans, and visual observations.

(b) Weather conditions: Typical weather conditions for Western Oregon in mid- to late- September.

(c) Transportation facilities: N/A

(d) Utilities: None

SECTION J - ATTACHMENTS

I t em Nu mb er of Pa ges

1. Individual Project Technical Capability Questionnaire 1 page

2. Statement of Work 9 pages (Separate Electronic Document)

3. List of CSI Specifications 17 pages (Separate Electronic Document)

4. General Decision Numbers:

Lane County: OR130027, 06/07/2013, with 8 mods 7 pages Linn County: OR130042, 06/07/2013, with 7 mods 7 pages

Bid Bond Form SF-24 applies if offer exceeds $150,000.00 and a Surety Bond is used for the Bid Guarantee.

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

L-10 FAR 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

ADD:

Site Visit contact:

L-11 PROJ E CT O F FE R SUBM I SSI O N R E Q UI R EM E NT S

To be considered for award of this project the following must be submitted:

• Task Order Form:

Complete the OFFER section, sign and date

• Task Order Section B:

Enter unit prices and extension amounts for all payment items shown

• Task Order Questionnaire:

Submit responses to questions on this form or in your own format

• Bid Guarantee:

Required for all offers exceeding $150,000.00

Jon Price Supervisor’s Office Willamette National Forest 3106 Pierce Parkway Springfield, OR 97477 Office: 541.822.7246

Cell: 541.225.8650 jcprice@fs.fed.us

SECTIO N M – E VAL UAT I O N FAC T O R S FO R AW AR D

M-2 EVALUATION OF OFFERS

See Basic Contract.

Road 5300 Culvert Replacement

Questionnair e

1. Technical Capability:

Identify key project managers by name and provide their experience with relevant roofing projects.

2. Pr oject Schedule:

Provide your expected schedule including sequence of work items and approximate time to complete each item.

3. Past Per for mance Histor y:

Provide a listing of your work for the past three years which is most closely related to this type of roofing. Include the dates of performance, who you worked for, the name of their contact person and their phone number.

General Decision Number: OR130027 06/07/2013 OR27

Superseded General Decision Number: OR20120027

State: Oregon

Construction Type: Building

County: Lane County in Oregon.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/04/2013 1 01/11/2013 2 01/18/2013 3 01/25/2013 4 02/22/2013 5 03/08/2013 6 04/12/2013 7 04/19/2013 8 06/07/2013

BROR0001-018 06/01/2012

Rates Fringes

BRICKLAYER.......................$ 32.75 15.80

TILE FINISHER....................$ 21.86 10.19

TILE SETTER......................$ 29.19 13.27

CARP0001-024 06/01/2012

Rates Fringes

Carpenters:

Excluding Form Work.........$ 32.61 14.44

ELEC0280-013 07/01/2012

LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST

CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY)

Rates Fringes

ELECTRICIAN (Electrical Low Voltage Wiring Installer and HVAC Temperature Control Installation only.)..............$ 27.04 3%+$11.50

ELEC0280-014 07/01/2012

LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST

CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY)

ELECTRICIAN......................$ 36.46 3%+15.18

ELEC0932-010 01/01/2013

LANE COUNTY (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE

N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)

ELECTRICIAN......................$ 33.15 14.34

ELEC0932-011 01/01/2013

LANE COUNTY (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE

N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)

ELECTRICIAN (ELECTRICAL LOW

VOLTAGE WIRING INSTALLER AND

HVAC CONTROL INSTALLATION

ONLY)............................$ 25.30 12.61

ENGI0701-020 01/01/2013

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.63 13.55

GROUP 1A....................$ 39.51 13.55

GROUP 1B....................$ 41.39 13.55

GROUP 2.....................$ 35.97 13.55

GROUP 3.....................$ 34.96 13.55

GROUP 4.....................$ 34.00 13.55

GROUP 5.....................$ 32.88 13.55

GROUP 6.....................$ 29.84 13.55

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments

GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;

GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over

GROUP 2: CRANE: Cableway Operator, 25 tons and over;

HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);

TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:

Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade Operator-Robotic; Rubber tired scraper with tandom scrapers, multi-engineTrenching Machine-Wheel Operator

GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);

LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units.

GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;

LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments; BLADE: Blade operator; Tractor operator with boom attachment; DRILLING:

Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; HYDRAULIC HOES: Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments; Asphalt Paver;

Screed Operator; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled; Trenching Machine, digging capacity over 3 ft Depth.

GROUP 5: TRACKHOE-HYDRAULIC: up to and including 20,000 lbs.;

Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; HYDRAULIC HOES: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type);

Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; Concrete Pumper; Concrete Paver: Compactor

GROUP 6: LOADERS: (less than 1 cu yd.); Roller (Non-Asphalt); Oiler; Bobcat/Skid Loader; Grade Checker;

Crane oiler; Drill Assistant

IRON0029-011 01/01/2012

Rates Fringes

IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.87 20.12

LABO0001-030 06/01/2011

Laborers: (Mason Tender-Cement/Concrete)..........$ 25.19 12.35

LABO0001-031 06/01/2011

Rates Fringes

Laborers: (Mason Tender-Brick)...$ 25.19 12.35

LABO0001-032 06/01/2011

Rates Fringes

Laborers: (Mason Tender-Stone)...$ 25.19 12.35

LABO0003-008 06/01/2010

Rates Fringes

Laborers:

GROUP 1.....................$ 25.25 12.07

GROUP 2.....................$ 25.91 12.07

GROUP 3.....................$ 26.38 12.07

GROUP 4.....................$ 26.80 12.07

LABORER CLASSIFICATIONS

GROUP 1: Form-Stripping

GROUP 2: Power Tool Operator

GROUP 3: Vibrating Plate

GROUP 4: Grade Checker, Pipelayer

PAIN0055-023 07/01/2009

Rates Fringes

Painters:

Brush, Roller and Spray.....$ 18.59 7.24

PAIN0055-024 08/13/2012

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 32.22 12.40

PAIN0740-002 01/01/2013

Rates Fringes

GLAZIER..........................$ 35.80 13.89

PLAS0082-003 06/01/2011

Rates Fringes

PLASTERER........................$ 25.08 11.32

PLAS0555-006 06/01/2012

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.98 17.76

PLUM0290-008 04/01/2013

Rates Fringes

Plumbers and Pipefitters.........$ 39.71 22.10

ROOF0049-007 06/01/2012

Rates Fringes

Roofers:

Excluding Metal Roof........$ 23.37 10.85

SUOR2009-025 11/09/2009

Rates Fringes

CARPENTER (Form Work Only).......$ 21.07 7.43

LABORER: Common or General......$ 19.03 6.96

LABORER: Landscape..............$ 14.02 2.63

OPERATOR: Excavator.............$ 22.61 6.32

OPERATOR: Forklift..............$ 20.28 8.18

SHEET METAL WORKER...............$ 33.23 2.73

SPRINKLER FITTER (Fire Sprinklers)......................$ 29.38 5.49

TRUCK DRIVER: Dump Truck........$ 15.50 9.05

TRUCK DRIVER: Water Truck.......$ 18.40 5.33

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: OR130042 06/07/2013 OR42

Superseded General Decision Number: OR20120042

State: Oregon

Construction Type: Building

County: Linn County in Oregon.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/04/2013 1 01/11/2013 2 01/18/2013 3 01/25/2013 4 02/22/2013 5 03/08/2013 6 04/12/2013 7 06/07/2013

BROR0001-022 06/01/2012

Linn (South) County

Rates Fringes

BRICKLAYER.......................$ 31.53 15.80

TILE FINISHER....................$ 21.86 10.19

TILE SETTER......................$ 29.19 13.27

BROR0001-023 06/01/2012

Linn (North) County

Rates Fringes

BRICKLAYER.......................$ 32.75 15.80

TILE FINISHER....................$ 21.86 10.19

TILE SETTER......................$ 29.19 13.27

CARP0001-030 06/01/2012

Rates Fringes

Carpenters:

Cabinet installation and form work only..............$ 32.61 14.44

MILLWRIGHT.......................$ 33.11 14.44

CARP9001-005 06/01/2012

Acoustical Ceiling Installer.....$ 32.90 14.15

ELEC0280-010 07/01/2012

Rates Fringes

ELECTRICIAN......................$ 36.46 3%+15.18

ELEC0280-019 07/01/2012

Rates Fringes

ELECTRICIAN (Electrical installer alarms, low voltage wiring and telephone installation.)...................$ 27.04 3%+$11.50

ENGI0701-025 01/01/2013

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 37.63 13.55

GROUP 1A....................$ 39.51 13.55

GROUP 1B....................$ 41.39 13.55

GROUP 2.....................$ 35.97 13.55

GROUP 3.....................$ 34.96 13.55

GROUP 4.....................$ 34.00 13.55

GROUP 5.....................$ 32.88 13.55

GROUP 6.....................$ 29.84 13.55

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments

GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;

GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over

GROUP 2: CRANE: Cableway Operator, 25 tons and over;

HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);

TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:

Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade Operator-Robotic; Bulldozer: Over 120,000 lbs and above;

Bulldozer: D-10, D-11 and similar type; Loader: 120,000 lbs and above

GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);

LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Bulldozer: over 70,000 lbs up to and including 120,000; Loader: 60,000 lbs and less than 120,000 lbs

GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;

LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE--ROBOTIC: up to and including 20,0000 lbs. with any or all attachments; BLADE: Blade operator; Tractor operator with boom attachment; DRILLING:

Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Asphalt Paver; Mechanic; Bulldozer: over 20,000 lbs and more than 100 horse and up to 70,000 lbs;

Loader: 25,000 lbs and less than 60,000 lbs

GROUP 5: TRACKHOE-HYDRAULIC: up to and including 20,000 lbs.;

DRILLING: Churm Drill and Earth Boring Machine Operator;

Directional Drill Operator less than 20,000 lbs pullback;

Concrete Pumper; Concrete Paver; forlkift over 5 ton;

Bulldozer: 20,000 lbs or less, or 100 horse or less;

Loader: ruber tired type, less than 25,000 lbs

GROUP 6: LOADERS: (less than 1 cu yd.); Oiler; Crane oiler;

forklift; Broom

IRON0029-013 01/01/2012

Rates Fringes

IRONWORKER (Reinforcing and Structural)......................$ 33.87 20.10

LABO0001-030 06/01/2011

Rates Fringes

Laborers: (Mason Tender-Cement/Concrete)..........$ 25.19 12.35

LABO0001-031 06/01/2011

Rates Fringes

Laborers: (Mason Tender-Brick)...$ 25.19 12.35

LABO0003-014 06/01/2010

Rates Fringes

Laborers:

GROUP 1.....................$ 25.25 12.07

GROUP 4.....................$ 26.80 12.07

GROUP 5.....................$ 21.99 12.07

LABORER CLASSIFICATIONS

GROUP 1: Form-Stripping; Demolition

GROUP 4: Grade Checker, Pipelayer

GROUP 5: Flagger

PAIN0055-023 07/01/2009

Rates Fringes

Painters:

Brush, Roller and Spray.....$ 18.59 7.24

PAIN0740-002 01/01/2013

Rates Fringes

GLAZIER..........................$ 35.80 13.89

PLAS0082-003 06/01/2011

Rates Fringes

PLASTERER........................$ 25.08 11.32

PLAS0555-006 06/01/2012

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.98 17.76

PLUM0290-012 04/01/2012

Rates Fringes

PIPEFITTER.......................$ 38.20 21.36

SUOR2009-040 11/09/2009

Rates Fringes

ABATEMENT WORKER: ASBESTOS

(Removal from Ceilings, Floors, and Walls)...............$ 18.57 0.00

CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 22.87 9.39

DRYWALL FINISHER/TAPER...........$ 22.40 8.59

DRYWALL HANGER...................$ 20.47 8.54

ELECTRICAL INSTALLER

(Electrical Door/Eyes/Pressure Strips).......$ 14.00 0.00

ELECTRICIAN (Low Voltage Wiring for Alarms)...............$ 29.81 11.46

LABORER: Common or General......$ 18.57 7.08

OPERATOR: Backhoe...............$ 23.78 7.60

OPERATOR: Excavator.............$ 21.68 5.88

OPERATOR: Roller................$ 17.14 0.00

OPERATOR: Screed................$ 16.00 0.00

PLUMBER..........................$ 27.32 9.86

SHEET METAL WORKER (Metal Roofs Installation)..............$ 23.65 6.33

SHEET METAL WORKER, Excludes Metal Roof Installation..........$ 29.23 4.16

TRUCK DRIVER: Dump Truck........$ 16.00 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .