AG-04T0-S-10-0025 08_work_description.pdf

PDF 13 KB Posted

Attached to
Legacy FS Road 1200 Reconstruction Federal contract opportunity
Solicitation number
AG-04T0-S-10-0025
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Sheet 8 of 8

View the file

Other files for this federal contract opportunity

Other files attached to Legacy FS Road 1200 Reconstruction, newest first.
File Type Posted
AG-04T0-S-10-0025 07_brushing.pdf PDF
AG-04T0-S-10-0025 Contractor Packet to Return.pdf PDF
AG-04T0-S-10-0025 01_title_sheet.pdf PDF
AG-04T0-S-10-0025 Solicitation.pdf PDF
AG-04T0-S-10-0025 05_ drainage_listing.pdf PDF
AG-04T0-S-10-0025 04_rd_str_detail.pdf PDF
AG-04T0-S-10-0025 Specifications.pdf PDF
AG-04T0-S-10-0025 02_vicinity_map.pdf PDF
AG-04T0-S-10-0025 Specifications List.pdf PDF
AG-04T0-S-10-0025 06_drainage_typ.pdf PDF
AG-04T0-S-10-0025 03_Est_Qty.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 8 of 8

LEGACY FS ROAD 1200 RECONSTRUCTION

WORK DESCRIPTION

M.P. 0.00 Junction with State Highway 22 at Dolph.

M.P. 5.60 Begin Project.

Begin Road Reconditioning (Pay Item 30359).

Begin placement of 3" compacted depth aggregate base (Pay Item 32203C).

M.P. 5.83 Remove existing CMP and install 18" CPP culvert and outlet dissipator (Pay Items 25101, 32207A, 32203C and 60278).

M.P. 5.98 Remove existing CMP and install 18" CPP culvert and outlet dissipator (Pay Items 25101, 32207A, 32203C and 60278).

M.P. 6.19 Remove existing CMP and install 18" CPP culvert (Pay Items 32207A, 32203C and 60278).

M.P. 6.25 Remove existing CMP and install 18" CPP culvert (Pay Items 25101, 32207A, 32203C and 60278).

M.P. 6.32 Begin Roadside brushing (Pay Item 23051).

M.P. 6.41 Remove existing CMP and install 18" CPP culvert and outlet dissipator (Pay Items 25101, 32207A, 32203C and 60278).

M.P. 6.49 Remove existing CMP and install 18" CPP culvert and outlet pipe (Pay Items 32207A, 32203C, 60278 and 60654).

M.P. 7.10 Waste Area left.

M.P. 7.44 Install additional 2’ length 18” CPP culvert at inlet, widen inlet side of road 2’ with tapers of 30’ ahead and back, reconstruct catch basin and ditch line (Pay Items 20464, 32207A, 32203C and 60278).

M.P. 7.61 Remove existing CMP and install 18" CPP culvert and outlet dissipator (Pay Items 25101, 32207A, 32203C and 60278).

M.P. 7.69 Remove 3 trees on left side of roadway (Pay Item 20253).

Install 18" CPP culvert and outlet dissipator (Pay Items 25101, 32207A, 32203C and 60278).

M.P. 7.79 Waste Area left.

M.P. 7.97 Remove existing CMP and install 18" CPP culvert and outlet dissipator (Pay Items 25101, 32207A, 32203C and 60278).

M.P. 8.24 Remove existing CMP and install 18" CPP culvert and outlet dissipator (Pay Items 25101, 32207A, 32203C and 60278).

M.P. 8.25 End Roadside brushing (Pay Item 23051).

End Road Reconditioning (Pay Item 30359).

End placement of 3" compacted depth aggregate base (Pay Item 32203C).

EOP: Junction with FS road 2281.