AG-04T0-S-10-0025 05_ drainage_listing.pdf
PDF 19 KB Posted
- Attached to
- Legacy FS Road 1200 Reconstruction Federal contract opportunity
- Solicitation number
- AG-04T0-S-10-0025
About this file
Sheet 5 of 8
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-04T0-S-10-0025 01_title_sheet.pdf | ||
| AG-04T0-S-10-0025 08_work_description.pdf | ||
| AG-04T0-S-10-0025 Solicitation.pdf | ||
| AG-04T0-S-10-0025 07_brushing.pdf | ||
| AG-04T0-S-10-0025 Contractor Packet to Return.pdf | ||
| AG-04T0-S-10-0025 04_rd_str_detail.pdf | ||
| AG-04T0-S-10-0025 Specifications.pdf | ||
| AG-04T0-S-10-0025 02_vicinity_map.pdf | ||
| AG-04T0-S-10-0025 Specifications List.pdf | ||
| AG-04T0-S-10-0025 06_drainage_typ.pdf | ||
| AG-04T0-S-10-0025 03_Est_Qty.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Total
5 8
Fl ex
E lb ow
Rd 1200
5.83 18 34 EX EX 3 3
5.98 18 30 EX EX 3 3
6.19 18 38 EX EX 3
6.25 18 40 EX EX 3 3
6.41 18 30 EX EX 3 3
6.49 18 34 18 20 X EX EX 2
7.44 18 2
7.61 18 30 EX EX 3 3
7.69 18 30 * 90 3 3
7.97 18 34 EX EX 3 3
8.24 18 40 EX EX 3 3
TOTALS 342 24
Remove existing CMP. Install new CPP with outlet pipe.
CMP = Corrugated Metal Pipe CPP = Corrugated Plastic Pipe
* = Minimum 3%. If greater than 3%, then equal to or greater than grade of lead in ditch.
Remove existing CMP. Install new CPP.
Remove existing CMP. Install new CPP.
Remove existing CMP. Install new CPP.
Remove existing CMP. Install new CPP.
Remove existing CMP. Install new CPP.
Remove existing CMP. Install new CPP.
Remove existing CMP. Install new CPP.
Install new CPP.
Hand Placed
Corrugated Metal Pipe
O ut le t C
Y
In le t C Y
O ut le t C
Y
S ke w (d eg
Ty pe
Remarks
H al f R ou nd
Corrugated Metal Full Circle Outlet
Installation Details Riprap- CY
D ia m et er (i n)
Le ng th (f t)
D ia m et er (i n)
Dumped Corrugated Metal Outlet Connection
Machine Placed
In le t C Y
Drainage Listing
Fu ll
C irc le
H al f R ou nd
Designed
Plastic Pipe Plastic Spillway
Le ng th (f t)
Le ng th (f t)
Fu ll
C irc le
A nc ho r A ss em bl y
G ra de
In le t C Y
O ut le t C
Y
Remove existing CMP. Install new CPP.
Install additional 2' length at inlet to extend.
D ia m et er (i n)
Le ng th (f t)
D ia m et er (i n)
MP
drainage listing
File details come from the government source that posted it. Updated .