AG-04T0-S-10-0025 05_ drainage_listing.pdf

PDF 19 KB Posted

Attached to
Legacy FS Road 1200 Reconstruction
Solicitation number
AG-04T0-S-10-0025
Issued by

About this file

Sheet 5 of 8

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet Total

5 8

Fl ex

E lb ow

Rd 1200

5.83 18 34 EX EX 3 3

5.98 18 30 EX EX 3 3

6.19 18 38 EX EX 3

6.25 18 40 EX EX 3 3

6.41 18 30 EX EX 3 3

6.49 18 34 18 20 X EX EX 2

7.44 18 2

7.61 18 30 EX EX 3 3

7.69 18 30 * 90 3 3

7.97 18 34 EX EX 3 3

8.24 18 40 EX EX 3 3

TOTALS 342 24

Remove existing CMP. Install new CPP with outlet pipe.

CMP = Corrugated Metal Pipe CPP = Corrugated Plastic Pipe

* = Minimum 3%. If greater than 3%, then equal to or greater than grade of lead in ditch.

Remove existing CMP. Install new CPP.

Remove existing CMP. Install new CPP.

Remove existing CMP. Install new CPP.

Remove existing CMP. Install new CPP.

Remove existing CMP. Install new CPP.

Remove existing CMP. Install new CPP.

Remove existing CMP. Install new CPP.

Install new CPP.

Hand Placed

Corrugated Metal Pipe

O ut le t C

Y

In le t C Y

O ut le t C

Y

S ke w (d eg

Ty pe

Remarks

H al f R ou nd

Corrugated Metal Full Circle Outlet

Installation Details Riprap- CY

D ia m et er (i n)

Le ng th (f t)

D ia m et er (i n)

Dumped Corrugated Metal Outlet Connection

Machine Placed

In le t C Y

Drainage Listing

Fu ll

C irc le

H al f R ou nd

Designed

Plastic Pipe Plastic Spillway

Le ng th (f t)

Le ng th (f t)

Fu ll

C irc le

A nc ho r A ss em bl y

G ra de

In le t C Y

O ut le t C

Y

Remove existing CMP. Install new CPP.

Install additional 2' length at inlet to extend.

D ia m et er (i n)

Le ng th (f t)

D ia m et er (i n)

MP

drainage listing

File details come from the government source that posted it. Updated .