AG-04T0-S-10-0025 03_Est_Qty.pdf
PDF 14 KB Posted
- Attached to
- Legacy FS Road 1200 Reconstruction Federal contract opportunity
- Solicitation number
- AG-04T0-S-10-0025
About this file
Sheet 3 of 8
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-04T0-S-10-0025 04_rd_str_detail.pdf | ||
| AG-04T0-S-10-0025 Specifications.pdf | ||
| AG-04T0-S-10-0025 07_brushing.pdf | ||
| AG-04T0-S-10-0025 Contractor Packet to Return.pdf | ||
| AG-04T0-S-10-0025 01_title_sheet.pdf | ||
| AG-04T0-S-10-0025 08_work_description.pdf | ||
| AG-04T0-S-10-0025 Solicitation.pdf | ||
| AG-04T0-S-10-0025 05_ drainage_listing.pdf | ||
| AG-04T0-S-10-0025 02_vicinity_map.pdf | ||
| AG-04T0-S-10-0025 Specifications List.pdf | ||
| AG-04T0-S-10-0025 06_drainage_typ.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
OF
2.65
ITEM NO. UNIT QUANTITIES
15101 Lump Sum ALL
20253 Each 3
20301 Each 10
20464 Lump Sum ALL
23051 Mile 1.93
25101 Cubic Yard* 24
30359 Mile 2.65
32207A Cubic Yard* 100
32203C Cubic Yard* 1750
60278 Foot 342
60654 Foot 20
NOTES:
M.P. 7.69 scatter slash and deck firewood material.
18-inch full circle polyethylene outlet pipe, type C
Aggregate base, grading C, compaction method B
Subbase grading A, compaction method B
Placed riprap, class 3
Water source and all permits and permissions are the responsibility of the contractor.
Waste Areas located at m.p. 7.10 and 7.79 (as designated by C.O. on the ground), shall be 6' maximum height of material, 1V:2H slopes, and shape to drain upon completion.
ROAD NUMBER
PROJECT LENGTH (MILES)
* Denotes Contract Quantities
Roadway reconditioning, compaction B
DESCRIPTION
GENERAL NOTES
Removal, culvert disposal
Commercial Source/ Includes 6" depth culvert bedding and 3" compacted depth lift.
Mobilization Traffic control, equipment cleaning,fire prevention, soil erosion control and construction sign installation are included by indirect payment.
ESTIMATE OF QUANTITIES LEGACY FS ROAD 1200 RECONSTRUCTION
Disposal method (a) Remove from project and dispose of legallty off of Gov't. property.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Commercial Source/9" compacted depth subbase over culvert replacements.
Disposal method 1 - Scattering.
Excavation, compaction B M.P. 7.44 Ditch and catch basin reconstruction
Removal of individual trees, miscellaneous: disposal of tops & limbs (f(1)), and logs (f(i))
Roadside brushing, disposal method 1
Dissipators
Single wall, corrugated. Includes anchors, hardware and labor.
18 inch corrugated polyethylene pipe, type S, method B Double wall, smooth lined.
Lawson Thin EofQ