AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION

NO.

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

1 June 23, 2016

6. ISSUED BY CODE 04R4 7. ADMINISTERED BY (If other than Item 6) CODE

Willamette NF Supervisor’s Office 3106 Pierce Parkway, Suite D Springfield OR 97477-7909

Same as block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-04R4-S-16-0024

9B. DATED (SEE ITEM 11)

June 2, 2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Project Title: Soda Springs & Toketee Lake Site Improvements

This amendment updates specification 02872 (Benches) as shown on page 2 and 3 this amendment.

All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Lorenzo Montoya, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

/s/ Lorenzo Montoya 6/23/16 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Soda Springs & Toketee Lake Site Improvements -- Amendment No. 001

SECTION 02872

BENCHES

PART 1 – GENERAL

1.01 SUMMARY

A. This section specifies furnishing and installing log style benches.

1.02 RELATED SECTIONS

A. 06100 - Rough Carpentry

B. 07900 - Sealants

C. 09900 - Paints and Coatings.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Timber.

1. B or better Industrial Clear grade hand peeled Port Orford Cedar for bench legs and seats, WCLIB “Standard Grading Rules, No. 17.”

B. Wood Dowels.

1. Round wood dowels.

C. Paint.

1. Brown-pigmented epoxy “for the bench legs only”.

PART 3 - EXECUTION

3.01 CONSTRUCTION

A. Log Legs.

1. Log Legs seats.

a. Install with heart face down and sand top and seat planks smooth with medium grit sandpaper.

b. Bolts will be driven deeper into wood and capped with wooden dowels.

2. Log Legs.

a. Construct log legs.

2. Finish legs wooden surfaces with two brush coats of stain.

a. Finish legs wooden surfaces as follows:

1) After all cutting, hole drilling, and sanding is completed, but before erection, apply 1 brush coat of brown-pigmented epoxy to legs surfaces only allowing some to flow into drilled holes.

2) After erection, lightly sand first coat and apply 1 additional brush coat of brown-pigmented epoxy to the legs only. Quantity of pigment added to epoxy shall be such that wood grain cannot be seen through the finish and sunlight will not penetrate.

PART 4 - MEASUREMENT AND PAYMENT

4.01 Method of Measurement

A. Measurement will be for the number of completed benches furnished and installed.

4.02 Basis of Payment

A. Payment will be made at the Contract unit price for each Bench accepted.

B. Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

02872-1 Benches Each

END OF SECTION

Amendment No.1
SSTL-spec revised
PART 1 – GENERAL
1.01 SUMMARY
A. This section specifies furnishing and installing log style benches.
1.02 RELATED SECTIONS
A. 06100 - Rough Carpentry
B. 07900 - Sealants
C. 09900 - Paints and Coatings.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Timber.
1. B or better Industrial Clear grade hand peeled Port Orford Cedar for bench legs and seats, WCLIB “Standard Grading Rules, No. 17.”
B. Wood Dowels.
1. Round wood dowels.
C. Paint.
1. Brown-pigmented epoxy “for the bench legs only”.
PART 3 - EXECUTION
3.01 CONSTRUCTION
A. Log Legs.
1. Log Legs seats.
a. Install with heart face down and sand top and seat planks smooth with medium grit sandpaper.
b. Bolts will be driven deeper into wood and capped with wooden dowels.
a. Construct log legs.
2. Finish legs wooden surfaces with two brush coats of stain.
a. Finish legs wooden surfaces as follows:
1) After all cutting, hole drilling, and sanding is completed, but before erection, apply 1 brush coat of brown-pigmented epoxy to legs surfaces only allowing some to flow into drilled holes.
2) After erection, lightly sand first coat and apply 1 additional brush coat of brown-pigmented epoxy to the legs only. Quantity of pigment added to epoxy shall be such that wood grain cannot be seen through the finis...
PART 4 - MEASUREMENT AND PAYMENT
4.01 Method of Measurement
A. Measurement will be for the number of completed benches furnished and installed.
4.02 Basis of Payment
A. Payment will be made at the Contract unit price for each Bench accepted.
B. Payment will be made under:

File details come from the government source that posted it. Updated .