AG-04R4-S-16-0024-Solicitation.pdf
PDF 327 KB Posted
- Attached to
- Soda Springs & Toketee Lake Site Improvements
- Solicitation number
- AG-04R4-S-16-0024
About this file
Complete Solicitation Packet AG-04R4-S-16-0024
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment-001_04R4S160024.pdf | ||
| Attachment001-SupplementalSpecs.pdf | ||
| AG-04R4-S-16-0024-Packet-To-Return.pdf | ||
| Attachment002-Drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 54
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE
REQUEST NO.
4. CERT. FOR NAT.DEF. RATING
AG-04R4-S-16-0024 06/02/16 798358 UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date)
Willamette NF Supervisor’s Office 3106 Pierce Parkway, Suite D Springfield OR 97477-7909
As specified herein
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
Contracting Officer:
LORENZO MONTOYA
541 225-6334 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS Willamette NF Supervisor’s Office USDA - FS
c. STREET ADDRESS c. CITY 3106 Pierce Parkway, Suite D
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
Springfield OR 97477
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR BEFORE
THE DESIRED RESPONSE DATE OF
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the
Local Time 6/30/2016 4:00 PM submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(a) (b) (c) (d) (e) (f)
Soda Springs & Toketee Lake Site Improvements
Umpqua National Forest Douglas County
See Attached Requirements
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR
DAYS
c. 30 CALENDAR DAYS d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT
NUMBER PERCENTA
GE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
Sol. No. AG-04R4-S-16-0024 Soda Springs & Toketee Lake Site Improvements
Umpqua National Forest / Diamond Lake RD
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Soda Springs and Toketee Lake Site Improvements Umpqua N.F.
Douglas County
SCHEDULE OF ITEMS: SODA SPRINGS SITE
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
01200
Mobilization
Lump Sum
02100
Platform Structure, Railing and Fence
Lump Sum
13001
Triple Panel Interpretive Structure
Each
13002
Install Government Furnished Steel Interpretive Structures
TOTAL PRICE for Soda Springs Site $_________________
SCHEDULE OF ITEMS: TOKETEE LAKE SITE *
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
01200
Mobilization
Lump Sum
02100a
Wooden Fence
Lump Sum
All
02100b
Wooden Benches
13001
Double Panel Interpretive Structure
TOTAL PRICE for Toketee Lake Site $_________________
TOTAL PRICE FOR PROJECT $_________________
* Note: Toketee Lake site ONLY – The Forest Service will close the day use area for 3 weeks max. for contractor to complete work. Time period closed will be determined at pre-work meeting.
Toketee Lake site shall be completed first.
Umpqua National Forest / Diamond Lake RD
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Quoters must respond to the other factors as described in EVALUATION OF QUOTES in Section M.
Quote shall be submitted for the total item. Quote for less than the total item will not be considered. Late quotations may be considered and accepted.
Quotations may be submitted via fax to 541-225-6220, or sent hard copy to the address shown in block 5(a) of the Standard Form 18.
The estimated start work date is September 7, 2016. All work shall be completed within 60 calendar days after the effective date of the Notice to Proceed.
CONTRACTOR DUNS No.: ________________________
CONTRACTOR EMAIL: _____________________________________________________
Umpqua National Forest / Diamond Lake RD
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 DESCRIPTION OF WORK
Soda Springs site: Construct a viewing platform, wooden fence and triple panel interpretive structure.
Toketee Lake site: Construct a wooden fence, benches and double panel interpretive structure.
C-2 PROJECT LOCATION
These two projects are located on the Diamond Lake Ranger District on the Umpqua National Forest.
Soda Springs site: Township 26 South, Range 6 East, Section 18, near PacificCorp Hydro Power Soda Springs Dam, OR. From Roseburg take exit 124 off Interstate I-5, take Highway 138 East (North Umpqua Highway), continue for approx. 51.2 miles, turn left into Forest Service road 4775-011 gravel surface for 1.10 miles to the project site.
Toketee Lake site: Township 26 South, Range 6 East, Section 25, near Toketee Lake campground, OR. From Roseburg take exit 124 off Interstate I-5, take Highway 138 East (North Umpqua Highway), continue for approx. 59.1 miles, turn left into Forest Service road 3400 paved surface for approx. 1.7 miles and turn right into Toketee Lake campground and go approx. 0.15 miles and project site is at the end of paved single lane road.
C-3 PRICE RANGE
The Government’s estimate is:
(b) Between $25,000 and $100,000.
C-4 APPLICABLE SPECIFICATINS (CSI PROJECTS)
The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.
C-5 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF
WORK/SPECIFICATIONS (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Umpqua National Forest / Diamond Lake RD
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
Umpqua National Forest / Diamond Lake RD
SECTION E--INSPECTION AND ACCEPTANCE
E-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984) http://www.arnet.gov/far/
Umpqua National Forest / Diamond Lake RD
SECTION F--DELIVERIES OR PERFORMANCE
F-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/?q=browsefar
52.242-14 Suspension of Work (APR 1984)
F-2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984)
The Contractor shall be required to
(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 60 days after the date the contractor received the notice to proceed .* The time stated for completion shall include final cleanup of the premises.
(End of Clause) https://www.acquisition.gov/?q=browsefar
Umpqua National Forest / Diamond Lake RD
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.2 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held at Diamond Lake Ranger Station or Supervisory Office, or at a location mutually agreed upon by the Contractor and the Contracting Officer.
Umpqua National Forest / Diamond Lake RD
G-3 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
PROPERTY/FACILITIES/SERVICES AVAILABILITY LOCATION AVAILABILITY
TIME
1-1/2” minus aggregate for under platform ¼ inch minus aggregate for platform surface and around sign structures.
Within area designated by COR at Fish Creek Quarry located on FS Road 3700-200, mile post 0.2, T27 S, R4E, Sec 19-20.
At Notice to Proceed
Designated disposal sites for slash, over burden and trees from the project sites.
Within area designated by COR at Foster Creek Quarry located on FS Road 2801-050, mile post 0.25, T26 S, R2E, Sec 36 and/or Slide Creek quarry located on FS Road 3402-200 MP 0.2, T26S, R3E, Sec. 13.
At Notice to Proceed
(7) Interpretive Panels for (5 for Soda Springs and 2 for Toketee Lake) sites.
Forest Service Warehouse Diamond Lake Blvd., Roseburg, Or.
Provide 2 weeks prior notice to CO
Temporary staging for materials and equipment At project sites. Duration of construction
Industrial camp sites (no utilities available)
Toketee Lake campground located off of FS road 3400 MP 1.7, T26S, R3E, Sec. 25.
Duration of construction
Camping fees shall apply
(2) Steel Interpretive Structures for (Soda Springs site) and (2) Interpretive panels.
Forest Service Warehouse, Roseburg, Or.
Diamond Lake Blvd., Roseburg, Or.
Provide 2 weeks prior notice to CO
Umpqua National Forest / Diamond Lake RD
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 Submittals, Shop Drawings, Material Certifications and Testing Reports
The following shall be submitted on this project:
Designation of Representative R6-FS-6300-6
Superintendence By the Contractor [FAR 52.236-6]
Time of Notice to Proceed
Engineered Spill Prevention Plan
Landscape Preservation and Hazardous Materials clause in section H
7 days
Fire Plan R6-FS-6300-55 and Certification that your Fire Tools and Equipment are in full compliance with the contract requirements
R6-FS-6300-52 part 2 in Section J
N/A
Proposed Progress Schedule
Schedules For Construction Contracts
[FAR 52.236-15]
N/A
Drug Free Workplace Policy
Drug-Free Workplace
[FAR 52.223-6]
N/A
SF1413 Statement and Acknowledgement for each Subcontractor including Owner/Operators and other Sole Proprietorship Subcontractors [not required for material suppliers]
Subcontracts (Labor Standards) [FAR 52.236-11]
N/A
Payroll Record WH347 Certified Payrolls submitted weekly
Payrolls and Basic Records [FAR 52.222-8]
N/A
Product and Material Certifications and Literature
As required by Specifications
10 days
H-2 Landscape Preservation
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Contracting Officer. Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, Umpqua National Forest / Diamond Lake RD oils, bitumens, calcium chloride, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Contracting Officer.
H-3 Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.
The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.
However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
H-4 Construction Stakes, Lines, and Grades
(a) Unless a Pay Item for Construction Staking is included in the Schedule of Items, the Government will set initial construction stakes establishing lines, slopes, and continuous control points, reference lines, and bench marks for other structures and improvements and will furnish the Contractor with all necessary information relating to lines, slopes, and grades.
(b) These stakes and control points shall constitute the field control from which the Contractor shall establish other necessary controls and execute the work. The Contractor shall furnish, without additional compensation, all additional stakes, all templates, batter boards, and other materials and supplies necessary for marking and maintaining points and lines established. If any construction control points have been destroyed or displaced or are erroneous, the Contractor shall promptly notify the Contracting Officer.
(c) The Contractor is responsible for the preservation of all stakes and control points. The cost of replacing them will be charged to the Contractor when destroyed due to Contractor's negligence or operation.
(d) In the case of alterations which involve any changes in construction staking, the Contractor shall cooperate with the Contracting Officer and facilitate the prompt re-establishment of the field control for the altered or adjusted work.
Umpqua National Forest / Diamond Lake RD
H-5 Contractor’s Use of Existing Roads
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.
H-6 Road Use and Maintenance
Use of Roads
(a) The Contractor is authorized to use roads that are a part of the construction project and those Forest Service roads designated below for performance of work under this contract.
Road No.
Termini
Authorizations, Restrictions & Requirements
Maintenance Required (Yes or No)
(b) If the Contractor requests use of a National Forest road or segment not designated for his use, the Forest Service may authorize such use if not in conflict with the current Road Rules document. Authorization to use such additional roads may include maintenance requirements and use limitations.
(c) The roads authorized for use will be subject to the following provisions:
1. The Road Rules in the current Umpqua National Forest Road Rules Document are applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of the contract.
Umpqua National Forest / Diamond Lake RD
2. State laws governing traffic rules and equipment requirements on State and County highways.
3.Federal regulations contained in 36 CFR 261.12. These regulations prohibit use of vehicles or equipment in excess of State legal highway loads or posted limits without valid State and Forest Service overload permits, damaging a road while using it, and blocking a road open to use by others, except as may be otherwise provided in the contract.
Load Limits --All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, overwidth permits. Forest Service overload permits for this project may be obtained from the District Ranger.
4. Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions and closures any time conditions warrant.
Such closures will be in addition to those shown in the current Road Rules Document and will be posted on the road.
H-7 Traffic Control
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagman and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
The Contractor shall furnish, erect, maintain, and remove when notified any project identification signs shown on the drawings
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
Umpqua National Forest / Diamond Lake RD
H-8 Control of Material
Rights In and Use of Materials
(a) The Contractor, with the written approval of the Contracting Officer, may use on the project suitable stone, gravel, and sand, or other material found in the excavation. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The Contractor shall replace without additional compensation sufficient suitable materials to complete the portion of the work which was originally contemplated to be constructed with such material.
(b) Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to reimburse the Contractor for the cost of their production.
Material Sources
(a) Designated Sources - Sources of local materials are designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source.
The Contractor shall determine the equipment and work required to produce the specified product.
The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads.
When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.
Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with Clauses 52.243-5, Changes and Changed Conditions or Clause 52.236-2, Differing Site Conditions.
(b) Contractor Furnished Sources - When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor furnished source material result in financial disadvantage to the Government. Quality Testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.
Storage Stockpiling of Materials
Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service
Umpqua National Forest / Diamond Lake RD administered land, approved by the Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by the Forest Service shall be restored at Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered lands.
Earthwork Tolerance
Changes within specified tolerances (such as adjustment of horizontal or vertical alignment) shall be made as necessary to maintain earthwork quantities substantially as designed within balance points. Such adjustments shall not be considered as "Changes" under Clause 52.243-5.
H-9 Suspensions for Other Than Government’s Convenience
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) Weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to become muddy or unsuitable; or (2) Failure of the Contractor to comply with Specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by his/her operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for equitable adjustment.
H-10 Additional Requirements or Restrictions
Do any roads exceed 20% grade? No, but Road 4775-011 at MP 1.0 steep grade to cross bridge at Soda Springs dam.
Does the project have a restricted time of performance (hours, days of the week, or time of the year)? Yes, only for the Toketee Lake site. Mon-Fri from 7:00am - 5:00pm no work on week-ends unless approved in writing from CO. The work required for this site will allow 3 weeks of Day Use site area closed to the public for contractor to do his work.
Will the contractor be allowed to use an existing utility system? If yes, a description of the utility system must be included in the statement of work. No
Umpqua National Forest / Diamond Lake RD
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffara.htm www.usda.gov/procurement/policy/agar.html
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-13 System for Award Management Maintenance (LUL 2014) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010)
(Applicable if contract exceeds $30,000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.217-7 Option for Increased Quantity -- Separately Priced Line Item (Mar 1989) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (Jul 2013) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (JUN 2010) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-20 Walsh-Healy Public Contracts Act (OCT 2010) (Applicable if contract exceeds $15,000) 52.222-21 Prohibition of Segregated Facilities (FEB 2015) (Applicable if contract exceeds
$10,000) 52.222-26 Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
(Applicable if contract exceeds $10,000) 52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010) (Applicable if contract exceeds $15,000) 52.222-50 Combating Trafficking in Persons (MAR 2015) http://farsite.hill.af.mil/vffara.htm http://www.usda.gov/procurement/policy/agar.html
Umpqua National Forest / Diamond Lake RD
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (Jul 2012)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction
Contracts (MAY 2008) 52.223-18 Contractor Policy to Ban Text Messaging While Driving (Aug 2011) 52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $30,000) 52.228-11 Pledges of Assets (Jan 2012) (Applicable if contract exceeds $30,000) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) (Applicable if contract exceeds $30,000) 52.228-14 Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (JAN 1986) 52.232-27 Prompt Payment for Construction Contracts (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT
2003) 52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984)
Alternate I (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
Umpqua National Forest / Diamond Lake RD
Alternate I (APR 1984) Alternate II (APR 1984)
52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (DEC 2010) 52.245-1 Property Records (Apr 2012) 52.245-2 Government Property Installation Operation Services (Apr 2012) 52.245-9 Use and Charges (Apr 2012) 52.246-21 Warranty of Construction (MAR 1994)
Alternate I (APR 1984) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)
(APR 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV
1996) (Applicable if contract is over $30,000) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
I-2 FAR 52.225-9 Buy American Act-Construction Materials (MAY 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Umpqua National Forest / Diamond Lake RD
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
Umpqua National Forest / Diamond Lake RD
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
Umpqua National Forest / Diamond Lake RD
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description
Unit of measure
Quantity Price (dollars) *
Item 1 Foreign construction material
Domestic construction
Item 2
Umpqua National Forest / Diamond Lake RD
Foreign construction
Domestic construction
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
(End of Clause)
I-3 FAR 52.228-13 Alternative Payment Protections (JUL 2000)
(a) The Contractor shall submit one of the following payment protections
(1) A payment bond; (2) An irrevocable letter of credit (ILC);
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 15 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause)
Umpqua National Forest / Diamond Lake RD
I-4 ORDER OF PRECEDENCE--CONSTRUCTION
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications), i.e., Sections A, B, D, E, F, G, and H.
(2) Representations and other instructions, i.e., Sections K, L, and M.
(3) Contract clauses, i.e., Section I.
(4) Other documents, exhibits, and attachments, i.e., Section J.
(5) Supplemental Specifications.
(6) Standard Specifications, i.e., Section C (including FAR clauses).
(7) (a) Plans, figured dimensions over scaled dimensions.
(b) Plans, large scale contract plans over small scale contract plans.
(c) Schedules on contract plans over any conflicting notations on contract plans.
(8) Shop drawings.
I-5 PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Government or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
I-6 RETURN OF PERFORMANCE AND PAYMENT BONDS
Performance and payment security furnished under this contract must be retained by the Government for a minimum of one year after acceptance of all work under the contract.
Performance and payment security other than corporate or individual surety bonds will be returned to the Contractor one year after completion of work if no claims against these bonds have been filed at that time.
I-7 PAYMENT FOR PERFORMANCE AND PAYMENT SECURITY EXPENSES
It is mutually agreed that the premium costs for performance bonds, payment bonds and alternative payment protections furnished for this contract are included in the total amount bid for other items and that any payment to the Contractor for the cost of bonds made in accordance with FAR 52.232-5 refers only to corporate sureties listed in the current Department of Treasury Circular 570 and no advance payment will be made for bond premiums where other than corporate surety bonds are furnished. Bond premiums as used in this paragraph and FAR 52.232-5 shall include any Small Business Administration fees paid in connection with SBA guaranteed corporate surety bonds.
I-8 WAGE DETERMINATION DECISION
The general wage determination applicable to this contract is attached in Section J.
Where rates for "Timber Sale Roads" appear in the Wage Determination Decision, they shall be applicable only to projects identified as "Opted" Timber Sale Roads.
Umpqua National Forest / Diamond Lake RD
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Title Pages
1. Specification List – CSI (separate document) 36
2. Project Drawings (separate document) 12 Page No Description 1 Title and Signature Sheet 2 Vicinty Map and General Notes 3 Estimate of Quantities 4 Soda Springs Plan View 5 Soda Springs Fence & Platform Typicals 6 Toketee Lake Plan View 7 Toketee Lake Fence Typicals 8 Double Panel Sign Structure 9-10 Triple Panel Sign Structure 11-12 Sign Structure Details
3. DOL Wage Decision No. OR160036 04/22/2016 OR36 9
4. Fire Protection and Suppression (R6-FS-6300-52) 6
Umpqua National Forest / Diamond Lake RD
ATTACHMENT 3 -- DOL Wage Decision No.
General Decision Number: OR160036 04/22/2016 OR36
Superseded General Decision Number: OR20150036
State: Oregon
Construction Type: Building
County: Douglas County in Oregon.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 03/25/2016 2 04/22/2016
BROR0001-018 05/01/2015
Rates Fringes
BRICKLAYER.......................$ 33.88 16.50
TILE FINISHER....................$ 22.59 12.04
TILE SETTER......................$ 30.08 15.88
CARP0001-032 06/01/2012
Rates Fringes
Carpenters:
Including Metal stud installation and form work..$ 32.61 14.44
CARP9001-004 06/01/2012
Rates Fringes
Acoustical Ceiling Installer
Umpqua National Forest / Diamond Lake RD
& Drywall Hanger.................$ 32.90 14.44
ELEC0659-014 01/01/2015
DOUGLAS (THAT PORTION EAST OF THE COASTAL WATERSHED DIVIDE)
COUNTY
ELECTRICIAN......................$ 30.44 15.71
ELEC0659-015 01/01/2016
DOUGLAS (THAT PORTION EAST OF THE COASTAL WATERSHED DIVIDE)
COUNTY
ELECTRICIAN
Computer Installation, low voltage wiring for computers and telephone installation................$ 16.00 3%+10.65 Electrical Installers Alarms and Low Voltage Wiring for Alarms...........$ 24.90 13.00
* ELEC0932-014 01/01/2016
DOUGLAS REMAINDER OF COUNTY
Rates Fringes
ELECTRICIAN......................$ 35.50 16.12
ELEC0932-015 07/01/2015
DOUGLAS REMAINDER OF COUNTY
Rates Fringes
ELECTRICIAN (Electrical installer alarms, low voltage wiring for alarms, low voltage wiring for computers, computer installation and telehone installation.)..........$ 26.45 13.79
ENGI0701-026 01/01/2015
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 39.47 14.10
Umpqua National Forest / Diamond Lake RD
GROUP 1A....................$ 41.44 14.10
GROUP 1B....................$ 43.42 14.10
GROUP 2.....................$ 37.58 14.10
GROUP 3.....................$ 36.44 14.10
GROUP 4.....................$ 35.36 14.10
GROUP 5.....................$ 34.13 14.10
GROUP 6.....................$ 30.94 14.10
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments
GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;
GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over
GROUP 2: CRANE: Cableway Operator, 25 tons and over;