INSTRUCTIONS.pdf
PDF 163 KB Posted
- Solicitation number
- AG-04P5-S-16-0010
About this file
Instructions to Quoters
View the file
Other files
| File | Type | Posted |
|---|---|---|
| StatementofWorkAttach1.pdf | ||
| SPECIFICATION_LIST.pdf | ||
| WageRates.txt | TXT text file | |
| Solicitation.pdf | ||
| Carpet_andFlooring_Floorplans3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS, CONDITIONS, AND NOTICES TO QUOTERS OR RESPONDENTS
The provision “52.212-2, Evaluation-Commercial Items”, applies to this acquisition and the specific evaluation criteria to be included in paragraph (a) of that provision, are as follows:
Offers shall provide technical and business information to include the elements cited in this section.
The Contractor shall address, in narrative form, the elements listed below. Copies of company literature, brochures, or other information may be attached if appropriate.
Extensive, elaborate and specially prepared attachments are neither required nor desired.
The Government is not obligated to request additional information and, in the absence of appropriate information, the Government may rely on personal knowledge of the firm.
1. Past Performance
Subfactors:
Quality of workmanship
Customer Satisfaction
Timeliness of Performance
References
2. Contractor’s Experience
Subfactors:
Professional Licenses
Prior experience of the Contractor
Key personnel qualifications and experience (identify numbers and types of personnel to be used).
Identify other concurrent commitments.
How this service will be delivered.
3. Quality Control Plan
A. Quality Control Plan. The Contractor shall provide a Quality Control
Plan (QCP) as part of this Request for Quotes. The Plan must demonstrate how the
Contractor will assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:
1. How quality will be monitored to assure performance standards are met.
2. How the work will be supervised.
3. How results of the monitoring will result in quality performance.
4. Identify the personnel responsible for performing quality control.
4. SAFETY PLAN
Prior to allowing any work to commence on the project, the Contractor shall submit a Safety Plan to the Contracting Officer that is in accordance with OSHA
Regulations. Such safety plan shall include all tasks and related activities anticipated to successfully complete the work. The safety plan shall include the Personal Protective
Equipment (PPE) that the Contractor provides for his/her employees at no cost to them.
It shall include how often the PPE is inspected to insure that it is not defective or damaged. It shall include steps the Contractor takes to insure that his/her workers are using the PPE on the worksite and what steps the Contractor uses if an employee is found to be working without the required PPE. The Contractor shall include any safety training he/she provides to his/her employees.
5. Price – Price Reasonableness (Use “Schedule of Items”)
Past performance, experience, quality control plan, and safety plan when combined, are equal to price.
Prior to the award of any contract subject to the Oregon Worker’s Compensation Law, the
Contractor must provide (1)evidence that the Contractor (including subcontractors) has the required workers compensation coverage; or (2) certification that the Contractor has no employees, or are otherwise exempt.
Quoters must be registered in SAM.gov
Sign page 1
Provide pricing information on pages 2-3
Fill out page 4
QUOTES MAY BE SUBMITTED TO: Klamath Ranger District, 2819 Dahlia St., Klamath Falls, OR 97601 or
QUOTES MAY BE SUBMITTED ELECTRONICALLY TO: dvest@fs.fed.us
File details come from the government source that posted it. Updated .