a._amend1.doc

DOC document 55 KB Posted

Attached to
PCRD Fence Construction
Solicitation number
AG-04KK-S-13-0005
Issued by

About this file

Amendment Form 1

View the file

Other files

File Type Posted
b.AG-04KK-S-13-0005_bidders.docx DOCX document
16rd_and_Knox_aspen_fencing_vicinity_3282013.pdf PDF
Photo_exhibits_for_the_group_exclosure_items.docx DOCX document
a.AG-04KK-S-13-0005.docx DOCX document
d.Knox_aspen_fencing_Item1B.pdf PDF
l.ContractorProvidedMaterialsList.docx DOCX document
i.FenceLineOffSet.docx DOCX document
g.SF_25B.pdf PDF
k.Knox_aspen_fencing_Item4H.pdf PDF
g.RockTieDowns.docx DOCX document
e.CornerAndGateJackDetail.docx DOCX document
g.Knox_aspen_fencing_Items2C.pdf PDF
a.AG-04KK-S-13-0005.docx DOCX document
j.GateTightenerDetail.docx DOCX document
c.Buck_and_Pole_Fence_Diagram.doc DOC document
c.OR67_dvb.mht MHT file
f.Knox_aspen_fencing_Items2B.pdf PDF
e.__Experience.Questionnaire.doc DOC document
f.RockJackAndFigureFourFence.docx DOCX document
j.Knox_aspen_fencing_Item4G.pdf PDF
m.Item5Aand5B.pdf PDF
d.BarbedWireSplicingAndEndTies.docx DOCX document
l.Knox_aspen_fencing_Item4I.pdf PDF
a.16rd_vicinity_aspenfence_locations.pdf PDF
h.Item3A5C5D5E6B.pdf PDF
h.WireGateSizeAndWireSpacing.docx DOCX document
b.BigGamePhotosFigures.docx DOCX document
o.Item6A.pdf PDF
f.SF_25A-98.pdf PDF
a.4-wire_fence_figures.doc DOC document
e.Knox_aspen_fencing_Items2Aand4A-E.pdf PDF
b.Knox_aspen_fencing_vicinity_3282013.pdf PDF
d._19_r6_fs_6300_52.doc DOC document
i.Knox_aspen_fencing_Item4F.pdf PDF
b.AG-04KK-S-13-0005_bidders.docx DOCX document
c.Knox_aspen_fencing_Item1A.pdf PDF
k.TrailerPhotoExample.docx DOCX document
n.Item5Fand5G.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-04KK-S-13-0005

2013 PCRD Fence Construction—Amendment 1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE
PAGE OF PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09/02/2013

4. REQUISITION/PUCHASE REQ. NO.
5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

Malheur National Forest

431 Patterson Bridge Road PO Box 909, John Day, OR 97845

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code)
X
9A.Amend Solicitation. AG-04KK-S-13-0005

9B.Dated 08/23/2013

10A.Mod Contract/Order

10B.Dated (see Item 13)

code
facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority)

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) 2013 PCRD Fence Construction—Malheur National Forest This amendment captures the notes from the site visit and also makes some changes to the initial solicitation. Please replace original solicitation, bidder’s packet, and Contractor Provided Materials List documents with the separately attached amended versions. Also, please incorporate the new vicinity map and group exclosure photos documents into the solicitation. All changes to existing documents have vertical lines in the left margin.

The date that offers are due is still September 12, 2013 by 4:30 pm PST at the location listed in block 6 of this form.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

By______________________________ (Signature of Contracting Officer)

16C.DATE SIGNED

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.24

File details come from the government source that posted it. Updated .