07-0043_Prebid.doc

DOC document 24 KB Posted

Attached to
Wickiup Reservoir Boat Launches and Parking Areas
Solicitation number
AG-04GG-S-07-0043
Issued by

About this file

PreBid Announcement

View the file

Other files

File Type Posted
07-0043_Amend03.doc DOC document
07-0043_Amend03_Attachment.pdf PDF
07-0043_Amend02.doc DOC document
07-0043_Amend02_Attachment.pdf PDF
07-0043_Amend01_Attachment.pdf PDF
07-0043_Wickiup_Drawings3of7.pdf PDF
07_0043_Wickiup_DBA.doc DOC document
07_0043_Wickiup_RFP.doc DOC document
Sf25_PerformanceBond.pdf PDF
sf24_BidBond.pdf PDF
07_0043_Wickiup_Notice.doc DOC document
07-0043_Wickiup_Specifications.pdf PDF
07-0043_Wickiup_Drawings1of7.pdf PDF
RS-FS-6300-52.doc DOC document
Sf25a_PaymentBond.pdf PDF
07-0043_Wickiup_Drawings2of7.pdf PDF
07-0043_Wickiup_Drawings7of7.pdf PDF
07-0043_Wickiup_Drawings6of7.pdf PDF
07-0043_Wickiup_Drawings4of7.pdf PDF
07-0043_Wickiup_Drawings5of7.pdf PDF
07-0043_QandAfromPrebid.doc DOC document
10year-elev.xls XLS spreadsheet
GULLPT_Jetty parkingModel(1).pdf PDF
NWick_RampModel(1).pdf PDF
Projectmap.pdf PDF
vicinitymap.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-BID MEETING ANNOUNCEMENT

Project:

Wickiup Reservoir Boat Launch and Parking Area

RFP#:

AG-04GG-C-07-0043

When:

10/10/07 @ 1:00 pm

Where:

Gull Point Campground at Wickiup Reservoir on the Deschutes National Forest.

Directions:

From Bend, proceed on the Cascade Lakes Highway (Road 46) past Mt. Bachelor approximately 28 miles. Turn left onto Road 42 and proceed approximately 4 miles. Turn right onto FDR 4260 towards Twin Lakes. Proceed 2.5 miles (past North and South Twin lakes) to Gull Point Campground and boat ramp. See attached Vicinity & Project Maps.

The Deschutes National Forest is hosting an optional pre-bid meeting for the referenced project. Attendance is not mandatory but is encouraged.

For further information, please contact:

Marcos Romero, Project Engineer – 541-383-5624

Or

Ben McGrane, Contracting Officer – 541-383-5550

File details come from the government source that posted it. Updated .