07-0043_Amend02.doc
DOC document 120 KB Posted
- Solicitation number
- AG-04GG-S-07-0043
About this file
Amendment 02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 07-0043_Amend03.doc | DOC document | |
| 07-0043_Amend03_Attachment.pdf | ||
| 07-0043_Amend02_Attachment.pdf | ||
| 07-0043_Amend01_Attachment.pdf | ||
| 07-0043_Wickiup_Drawings3of7.pdf | ||
| 07_0043_Wickiup_DBA.doc | DOC document | |
| 07_0043_Wickiup_RFP.doc | DOC document | |
| Sf25_PerformanceBond.pdf | ||
| sf24_BidBond.pdf | ||
| 07_0043_Wickiup_Notice.doc | DOC document | |
| 07-0043_Wickiup_Specifications.pdf | ||
| 07-0043_Wickiup_Drawings1of7.pdf | ||
| RS-FS-6300-52.doc | DOC document | |
| Sf25a_PaymentBond.pdf | ||
| 07-0043_Wickiup_Drawings2of7.pdf | ||
| 07-0043_Wickiup_Drawings7of7.pdf | ||
| 07-0043_Wickiup_Drawings6of7.pdf | ||
| 07-0043_Wickiup_Drawings4of7.pdf | ||
| 07-0043_Wickiup_Drawings5of7.pdf | ||
| 07-0043_QandAfromPrebid.doc | DOC document | |
| 10year-elev.xls | XLS spreadsheet | |
| GULLPT_Jetty parkingModel(1).pdf | ||
| NWick_RampModel(1).pdf | ||
| 07-0043_Prebid.doc | DOC document | |
| Projectmap.pdf | ||
| vicinitymap.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP# AG-004GG-S-07-0043
Amendment #02
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. CONTRACT CODE |
PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
12/20/07
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Deschutes National Forest
1001 SW Emkay Dr.
Bend, OR 97702
| 7. ADMINISTERED BY (If other than Item 6) Code |
8. NAME & ADDRESS OF CONTRACTOR (No., Street, county, State and ZIP Code)
| (X) |
| 9A. AMENDMENT OF SOLICIATION NO. |
AG-004GG-S-07-0043
9B. DATED (SEE ITEM 11)
December 3, 2007
10A. MODIFICATION OF CONTRACT/ORDER NO.
CODE
FACILITY CODE
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). |
| C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: |
| D. OTHER (Specify type of modification and authority) |
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office (with offer).
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Replaced Sheet 4 of the project drawings & amends the Schedule of Items. The estimated quantities for Item 20303, Removal of Existing Asphalt, are changed from 2835 SY to 4100 SY at North Wickiup. This changes the total quantity on the Schedule of Items from 5615 SY to 6880 SY.
By signature in Block 15.B. Contractor releases the Government from all claims relating to this modification. This settlement is complate accord and satisfaction.
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Ben McGrane, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
/s/ Ben R. McGrane
(Signature of Contracting Officer)
16C. DATE SIGNED
12/20/07
NSN 7540-01-152-8070
STANDARD FORM 30 (REV. 10-83)
Previous edition unusable
Prescribed by GSA FAR (48 CFR) 53.243
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES
SCHEDULE OF ITEMS
| Item No. |
| Description |
| Unit |
| Quantity |
| Unit Price |
| Total Cost |
15101
(01) Mobilization
| LS |
| 1 |
| $_______.__ |
| $_______.__ |
15201
(02)
| Establish Points, Precision A |
| PTS |
| 425 |
| $_______.__ |
| $_______.__ |
15202
(03) Slope Staking, Precision A
| PTS |
| 170 |
| $_______.__ |
| $_______.__ |
15203
(04)
| Finish Staking, Subgrade and Aggregate, Precision A |
| PTS |
| 425 |
| $_______.__ |
| $_______.__ |
15702
(05)
| Silt Fence |
| LF |
| 800 |
| $_______.__ |
| $_______.__ |
20102
(06) Clearing & Grubbing
| LS |
| 1 |
| $_______.__ |
| $_______.__ |
20303
(07) Removal Existing Asphalt
* Changed – Amend 2*
| SY |
| 6880 |
| $_______.__ |
| $_______.__ |
20305
(08) Removal of Structures & Obstructions
| LS |
| 1 |
| $_______.__ |
| $_______.__ |
20401
(09) Roadway Excavation, Compaction Method B
| CY |
| 3719 |
| $_______.__ |
| $_______.__ |
20404
(10) Unclassified Borrow, Compaction Method B
| CY |
| 1350 |
| $_______.__ |
| $_______.__ |
20418
(11) Drainage Excavation, type Swales
| CY |
| 515 |
| $_______.__ |
| $_______.__ |
20701
(12) Earthwork Geotextile, Type: Seperation
| SF |
| 1120 |
| $_______.__ |
| $_______.__ |
20801
(13)
Structural Excavation
| CY |
| 378 |
| $_______._ |
| $_______.__ |
20803
(14)
| Structural Backfill |
| CY |
| 378 |
| $_______._ |
| $_______.__ |
25104
(15) Keyed Riprap, Class 5
| CY |
| 1190 |
| $_______._ |
| $_______.__ |
30103
(16)
| Aggregate Base, Compaction Method B |
| CY |
| 2850 |
| $_______._ |
| $_______.__ |
40311
(17) State of Oregon, Asphalt Concrete Pavement Class Level 2
| Ton |
| 1865 |
| $_______._ |
| $_______.__ |
55202
(18) Structural Steel Railing, Furnish, Fabricated & Erected
| EA |
| 2 |
| $_______._ |
| $_______.__ |
63401A
(19) Pavement Markings, Type A, Color White
| LF |
| 4770 |
| $_______._ |
| $_______.__ |
63453
(20) Painted Pavement Marking, Wheelchair
| EA |
| 6 |
| $_______._ |
| $_______.__ |
02100(01)
(21) Silt Curtain
| LF |
| 490 |
| $______.__ |
| $______.__ |
02450(01)
(22) Wheelstops
| EA |
| 8 |
| $_______._ |
| $_______.__ |
03311(01)A
(23) Cast-in-Place Concrete Ramp
| SF |
| 18296 |
| $_______._ |
| $_______.__ |
03311(01)B
(24) Cast-in-Place Guiderail
| CY |
| 50 |
| $_______._ |
| $_______.__ |
03311(02)
(25) Pre-Cast Concrete Planks, Furnish & Install
| SF |
| 6756 |
| $_______._ |
| $_______.__ |
06100(01)
(26) Self-Adjusting Boarding Floats, including Gangplank(Furnish & Install)
| EA |
| 3 |
| $_______._ |
| $_______.__ |
| ALL ITEMS |
| TOTAL |
| $_______.__ |
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 (01)Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
*** See Page #4 of Project Drawings for itemized Quantities ***
File details come from the government source that posted it. Updated .