07-0043_Amend02.doc

DOC document 120 KB Posted

Attached to
Wickiup Reservoir Boat Launches and Parking Areas
Solicitation number
AG-04GG-S-07-0043
Issued by

About this file

Amendment 02

View the file

Other files

File Type Posted
07-0043_Amend03.doc DOC document
07-0043_Amend03_Attachment.pdf PDF
07-0043_Amend02_Attachment.pdf PDF
07-0043_Amend01_Attachment.pdf PDF
07-0043_Wickiup_Drawings3of7.pdf PDF
07_0043_Wickiup_DBA.doc DOC document
07_0043_Wickiup_RFP.doc DOC document
Sf25_PerformanceBond.pdf PDF
sf24_BidBond.pdf PDF
07_0043_Wickiup_Notice.doc DOC document
07-0043_Wickiup_Specifications.pdf PDF
07-0043_Wickiup_Drawings1of7.pdf PDF
RS-FS-6300-52.doc DOC document
Sf25a_PaymentBond.pdf PDF
07-0043_Wickiup_Drawings2of7.pdf PDF
07-0043_Wickiup_Drawings7of7.pdf PDF
07-0043_Wickiup_Drawings6of7.pdf PDF
07-0043_Wickiup_Drawings4of7.pdf PDF
07-0043_Wickiup_Drawings5of7.pdf PDF
07-0043_QandAfromPrebid.doc DOC document
10year-elev.xls XLS spreadsheet
GULLPT_Jetty parkingModel(1).pdf PDF
NWick_RampModel(1).pdf PDF
07-0043_Prebid.doc DOC document
Projectmap.pdf PDF
vicinitymap.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP# AG-004GG-S-07-0043

Amendment #02

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT CODE

PAGE OF

PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

12/20/07

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

Deschutes National Forest

1001 SW Emkay Dr.

Bend, OR 97702

7. ADMINISTERED BY (If other than Item 6) Code

8. NAME & ADDRESS OF CONTRACTOR (No., Street, county, State and ZIP Code)

(X)
9A. AMENDMENT OF SOLICIATION NO.

AG-004GG-S-07-0043

9B. DATED (SEE ITEM 11)

December 3, 2007

10A. MODIFICATION OF CONTRACT/ORDER NO.

CODE

FACILITY CODE

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office (with offer).

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Replaced Sheet 4 of the project drawings & amends the Schedule of Items. The estimated quantities for Item 20303, Removal of Existing Asphalt, are changed from 2835 SY to 4100 SY at North Wickiup. This changes the total quantity on the Schedule of Items from 5615 SY to 6880 SY.

By signature in Block 15.B. Contractor releases the Government from all claims relating to this modification. This settlement is complate accord and satisfaction.

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Ben McGrane, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

/s/ Ben R. McGrane

(Signature of Contracting Officer)

16C. DATE SIGNED

12/20/07

NSN 7540-01-152-8070

STANDARD FORM 30 (REV. 10-83)

Previous edition unusable

Prescribed by GSA FAR (48 CFR) 53.243

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES

SCHEDULE OF ITEMS

Item No.
Description
Unit
Quantity
Unit Price
Total Cost

15101

(01) Mobilization

LS
1
$_______.__
$_______.__

15201

(02)

Establish Points, Precision A
PTS
425
$_______.__
$_______.__

15202

(03) Slope Staking, Precision A

PTS
170
$_______.__
$_______.__

15203

(04)

Finish Staking, Subgrade and Aggregate, Precision A
PTS
425
$_______.__
$_______.__

15702

(05)

Silt Fence
LF
800
$_______.__
$_______.__

20102

(06) Clearing & Grubbing

LS
1
$_______.__
$_______.__

20303

(07) Removal Existing Asphalt

* Changed – Amend 2*

SY
6880
$_______.__
$_______.__

20305

(08) Removal of Structures & Obstructions

LS
1
$_______.__
$_______.__

20401

(09) Roadway Excavation, Compaction Method B

CY
3719
$_______.__
$_______.__

20404

(10) Unclassified Borrow, Compaction Method B

CY
1350
$_______.__
$_______.__

20418

(11) Drainage Excavation, type Swales

CY
515
$_______.__
$_______.__

20701

(12) Earthwork Geotextile, Type: Seperation

SF
1120
$_______.__
$_______.__

20801

(13)

Structural Excavation

CY
378
$_______._
$_______.__

20803

(14)

Structural Backfill
CY
378
$_______._
$_______.__

25104

(15) Keyed Riprap, Class 5

CY
1190
$_______._
$_______.__

30103

(16)

Aggregate Base, Compaction Method B
CY
2850
$_______._
$_______.__

40311

(17) State of Oregon, Asphalt Concrete Pavement Class Level 2

Ton
1865
$_______._
$_______.__

55202

(18) Structural Steel Railing, Furnish, Fabricated & Erected

EA
2
$_______._
$_______.__

63401A

(19) Pavement Markings, Type A, Color White

LF
4770
$_______._
$_______.__

63453

(20) Painted Pavement Marking, Wheelchair

EA
6
$_______._
$_______.__

02100(01)

(21) Silt Curtain

LF
490
$______.__
$______.__

02450(01)

(22) Wheelstops

EA
8
$_______._
$_______.__

03311(01)A

(23) Cast-in-Place Concrete Ramp

SF
18296
$_______._
$_______.__

03311(01)B

(24) Cast-in-Place Guiderail

CY
50
$_______._
$_______.__

03311(02)

(25) Pre-Cast Concrete Planks, Furnish & Install

SF
6756
$_______._
$_______.__

06100(01)

(26) Self-Adjusting Boarding Floats, including Gangplank(Furnish & Install)

EA
3
$_______._
$_______.__
ALL ITEMS
TOTAL
$_______.__

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 (01)Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

*** See Page #4 of Project Drawings for itemized Quantities ***

File details come from the government source that posted it. Updated .