REQ 412425 Drawings Compiled - 3.pdf
PDF 2 MB Posted
- Solicitation number
- AG-0489-S-10-0514
About this file
Drawings Attachment 3
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE
PROJECT NAME
SHEET TITLE
PROJECT:
DRAWN BY:
CHECK:
497 SW Century Drive Suite 105 Bend, OR 97702 Tel. 541.330.6506 admin@ggl-arch.com
CONSULTANTS
© GGL Architecture LLC 2010
EM
IG
RA
N
T C
RE
EK
RA
N G
ER
D
IS
TR
IC
T
O
FF
IC
E
A D
D
IT
IO
N
2010/04/26
H
IG
H W
A Y
S
O U
TH
H
IN
ES
O
RE
G
O N
100% SET
2010/05/06100% SET Revised
1/2"
1/ 2"
M A
X.
1/ 2"
M A
X.
D O
O R
A N
D W
IN
D
O W
D
ET
A
IL
S
0941_A901_Details
05 0113 09
06 0214 10
07 03
15 11TYP. DOOR THRESHOLD @ INT. DOOR TYP. DOOR THRESHOLD @ EXT. DOOR
TYP. DOOR JAMB @ INT. DOOR TYP. DOOR JAMB @ EXT. DOOR
TYP. WINDOW SILL TYP. WINDOW SILL @ REPLACEMENT WINDOW
TYP. DOOR HEAD @ INT. DOOR TYP. DOOR HEAD @ EXT. DOOR
TYP. WINDOW JAMB TYP. WINDOW JAMB @ REPLACEMENT WINDOW
TYP. WINDOW HEAD TYP. WINDOW HEAD @ REPLACEMENT WINDOW
SCALE: 3/4" = 1'-0"
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
GGL
GGL
A901
NOTE: SEE 01/A801 FOR TYP. FLASHING SEQUENCE
NOTE: SEE 01/A801 FOR TYP. FLASHING SEQUENCE
NOTE: SEE 01/A801 FOR TYP. FLASHING SEQUENCE
TYP. JAMB @ REMOVED WINDOW
TYP. DOOR JAMB @ 2 HR WALL
TYP. DOOR HEAD @ 2 HR WALL
SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0"
TYP. JAMB @ REMOVED WINDOW
(E) WALL
REMOVE (E) WINDOW, REPLACE W/
VINYL WINDOW REMOVE
NAILING FLANGE AND ATTACH THRU SILL
(E) INT. TRIM
CONT. BACKER ROD
AND SEALANT, TYP
(E) WALL SHEATHING
AND SIDING
PPM SILL FLASHING
SHIM AS NEEDED
CONT. SEALANT BED
(E) EXT. TRIM
PLACE WINDOW IN CONT. BED
OF SEALANT
(E) EXT. TRIM
REMOVE (E) WINDOW, REPLACE W/
VINYL WINDOW REMOVE
NAILING FLANGE AND ATTACH THRU JAMB
CONT. BACKER ROD AND SEALANT
CONT. BACKER ROD AND SEALANT, TYP.
CONT. BACKER ROD AND SEALANT
SHIM AS NEEDED
(E) INT. TRIM
(E) WALL
PLACE WINDOW IN CONT. BED
OF SEALANT
(E) EXT. TRIM
REMOVE (E) WINDOW, REPLACE W/
VINYL WINDOW REMOVE
NAILING FLANGE AND ATTACH THRU HEAD
CONT. BACKER ROD AND SEALANT, TYP.
CONT. BACKER ROD AND SEALANT
SHIM AS NEEDED
(E) INT. TRIM
(E) WALL
PLACE WINDOW IN CONT. BED
OF SEALANT
1X4 TRIM, TO MATCH (E)
VINYL WINDOW
CONT. BACKER ROD AND SEALANT, TYP.
CONT. BACKER ROD AND SEALANT
SHIM AS NEEDED
CONT. GYP. BD. INTO OPENNING
SCHEDULED EXT. WALL
(E) HEADER
PLACE WINDOW IN CONT. BED
OF SEALANT
1X4 EXT. TRIM, TO MATCH (E)
VINYL WINDOW
CONT. BACKER ROD AND SEALANT, TYP.
CONT. BACKER ROD AND SEALANT
SHIM AS NEEDED
CONT. GYP. BD. INTO JAMB
SCHEDULED EXT. WALL
MOISTURE BARRIER,
SHOWN DASHED,
CONT. INTO JAMB.
SCHEDULED EXT. WALL
VINYL WINDOW
5/4 X 4 MDF INT. TRIM,
PAINTED
CONT. BACKER ROD
AND SEALANT, TYP
SHIM AS NEEDED
CONT. SEALANT BED
1X4 EXT. TRIM, TO MATCH (E)
CONT. BACKER ROD AND SEALANT
5/4 MDF INT. TRIM
MOISTURE BARRIER, SHOWN DASHED.
CONT. INTO OPENNING
WINDOW HEAD, RE: STRUC
EXT. WALL SHEATHING
1/2" T-111 SIDING
EXT. WALL SHEATHING
1/2" T-111 SIDING
EXT. WALL SHEATHING
1/2" T-111 SIDING
DOOR
WOOD DOOR FRAME
ASSEMBLY BEYOND
METAL THRESHOLD
WALL STUD FRAMING
INTERIOR WALL FINISH
DOOR
1X4 MDF TRIM, PAINTED
HEAD FRAMING, RE: STRUC
INTERIOR WALL FINISH
DOOR
1X4 MDF TRIM, PAINTED
DOOR
WOOD DOOR FRAME
ASSEMBLY BEYOND
METAL THRESHOLD
1/2" EJ MATERIAL
1X4 EXT. TRIM, TO MATCH (E)
SCHEDULED EXT. DOOR
CONT. BACKER ROD AND SEALANT, TYP.
SHIM AS NEEDED
SCHEDULED EXT. WALL
MOISTURE BARRIER,
SHOWN DASHED,
CONT. INTO JAMB.
EXT. WALL SHEATHING
1/2" T-111 SIDING
1X4 MDF TRIM BD, PAINTED
CONT. SEALANT
1X4 EXT. TRIM, TO MATCH (E)
SCHEDULED EXT. DOOR
CONT. BACKER ROD AND SEALANT, TYP.
SHIM AS NEEDED
SCHEDULED EXT. WALL
MOISTURE BARRIER,
SHOWN DASHED,
CONT. INTO JAMB.
EXT. WALL SHEATHING
1/2" T-111 SIDING
1X4 MDF TRIM BD, PAINTED
CONT. SEALANT
DOOR HEADER, RE: STRUC
DOOR HEAD FRAMING
RE: STRUC.
INTERIOR WALL FINISH
BACKERROD AND SEALANT
(E) WALL
(E) HEADER
NEW GYPSUM BOARD
PATCH AND REPAIR
TO EXISTING
2HR RATED WALL
ASSEMBLY
2X WOOD FRAMING
RE: STRUC.
INTERIOR WALL FINISH
H.M. FRAME
GROUT SOLID
BACKERROD AND SEALANT
(E) WALL
(E) HEADER
NEW GYPSUM BOARD
PATCH AND REPAIR
TO EXISTING
2HR RATED WALL
ASSEMBLY
WOOD DOOR
H.M. FRAME
GROUT SOLID
WOOD DOOR
REMOVE (E) EXT. TRIM
REMOVE (E) WINDOW
REMOVE (E) INT. TRIM
(E) WALL
NEW GYP BD - PATCH AND
REPAIR - PAINTED
NEW 2X FRAMING @ 16" O.C.
W/ R21 BATT INSULATION
NEW EXTERIOR SIDING
TO MATCH EXISTING
OVER BUILDING PAPER
ON EXT. SHEATHING
REMOVE (E) EXT. TRIM
REMOVE (E) WINDOW
REMOVE (E) INT. TRIM
(E) WALL
NEW GYP BD - PATCH AND
REPAIR - PAINTED
NEW 2X FRAMING @ 16" O.C.
W/ R21 BATT INSULATION
2HR RATED WALL
ASSEMBLY
ST
AT
G R
S
E I
O
TE FO
Bend, Oregon
ED
ER AR
EC
T
N
REGO
TJames B. Landin I
CH
SHEET TITLE
PROJECT:
DRAWN BY:
CHECK:
497 SW Century Drive Suite 105 Bend, OR 97702 Tel. 541.330.6506 admin@ggl-arch.com
CONSULTANTS
© GGL Architecture LLC 2010
EM
IG
RA
N
T C
G
ER
D
IS
TR
IC
T
O
FF
IC
E
A D
D
IT
IO
N
2010/04/26
H
IG
H W
A Y
S
O
ES
O
RE
G
O N
100% SET
2010/05/06100% SET Revised
2"
2" 6"
6"
2 1/2"
F.O. (N) STUD TO F.O. (E) STUD
2" 6"
6"
2 1/2"
F.O. (N) STUD TO F.O. (E) STUD
2 1/2"
F.O. (N) STUD TO F.O. (E) STUD
2 1/2"
F.O. (N) STUD TO F.O. (E) STUD
2 1/2"
F.O. (N) STUD TO F.O. (E) STUD
2 1/2"2 1/2"
F.O. (N) STUD
TO F.O. (E) STUD
F.O. (N) STUD
TO F.O. (E) STUD
2"
/4
EN
ER
G Y
H
EE
L
1 12"1 12"
6" M
IN
3 1/2"
1/
2"
3 1/2"
1/
2"
D
ET
A
IL
S
0941_A902_Details
13 09 01
14 10
15 11
16 12
TYP. FOUNDATION DETAIL
2 HR WALL ASSEMBLY @ (E) ROOFLOW WALL CAP
2 HR WALL ASSEMBLY @ (N) ROOF
TYP. ROOF EAVE @ WALL 2 HR WALL ASSEMBLY @ (E) ROOF
TYP. ROOF EAVE@ FASCIA ROOF RAKE @ 2 HR WALL ASSEMBLY
SCALE: 1 1/2" = 1'-0"
SCALE: 3" = 1'-0"SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0"
SCALE: 3/4" = 1'-0" SCALE: 3" = 1'-0" SCALE: 3" = 1'-0"
SCALE: 3" = 1'-0"
SCALE: 3"=1'-0" SCALE: 3"=1'-0" SCALE: 3" = 1'-0"
GGL
GGL
A902
2 HR WALL ASSEMBLY @ (N) CEILING
SCALE: 1 1/2" = 1'-0"
SCALE: 3" = 1'-0"
06 2 HR WALL ASSEMBLY @ MECH. LOFT
SCALE: 3" = 1'-0" 02
08 FOUNDATION @ (E) BUILDING
SCALE: 1 1/2" = 1'-0"
FOUNDATION @ (E) BUILDING
TYP. HAND RAIL SUPPORT
GABLE TRUSS @ ROOF RAKE
SIDING AT EXTERIOR CORNER
SIDING AT INTERIOR CORNER
SCALE: 3/4" = 1'-0"
SCALE: 3" = 1'-0"
SCALE: 3"=1'-0"
TRIM @ SOFFIT
TRIM @ SOFFIT / BEAM
TRIM AT SOFFIT / BEAM
20 SCALE: 3/4" = 1'-0"
LANDING @ RAMP
PPM ROOFING
(2) LAYERS 30# ROOFING FELT,
SHOWN DASHED,
CONT. OVER FLASHING AND
ICE AND WATERSHIELD
ICE AND WATERSHIELD,
SHOWN DASHED,
CONT. FROM RAKE TO
36" INSIDE EXT. F.O. BUILDING
PPM FLASHING
ROOF SHEATHING,
RE: STRUC.
CONT. SEALANT
2X8 FASCIA BOARD
1/2" T-111 SIDING PANEL
MOISTURE BARRIER,
SHOWN DASHED
(2) LAYERS 5/8" TYPE 'X' GYP BD.
EACH SIDE OF WALL FRAMING
SCHEDULED EXT. WALL
ROOF TRUSS, RE: STRUC.
1/2" T-111 SIDING PANEL
MOISTURE BARRIER,
SHOWN DASHED,
LAP OVER FLASHING AND
ICE AND WATERSHIELD
(2) LAYERS 5/8" TYPE 'X' GYP BD.
EACH SIDE OF WALL FRAMING
SCHEDULED EXT. WALL
ROOF TRUSS, RE: STRUC.
PPM FLASHING
PPM ROOFING
(2) LAYERS 30# ROOFING FELT,
SHOWN DASHED,
CONT. OVER FLASHING AND
ICE AND WATERSHIELD
ICE AND WATERSHIELD,
SHOWN DASHED,
CONT. UP WALL 12" TO
36" INSIDE EXT. F.O. BUILDING
(E) ROOF SHEATHING
(E) WALL SHEATHING
AND SIDING
(E) ROOF FRAMING
DEMO ALL (E) ROOFING AND WATERPROOFING
DOWN TO (E) ROOF SHEATHING AND REPLACE
WITH (N) ROOFING ASSEMBLY AS SHOWN,
DEMO (E) RAKE TO ALLOW FOR (N) WALL AS REQUIRED.
1/2" T-111 SIDING PANEL
MOISTURE BARRIER,
SHOWN DASHED,
LAP OVER FLASHING AND
ICE AND WATERSHIELD
(2) LAYERS 5/8" TYPE 'X' GYP BD.
EACH SIDE OF WALL FRAMING
SCHEDULED EXT. WALL
ROOF TRUSS, RE: STRUC.
PPM FLASHING
PPM ROOFING
(2) LAYERS 30# ROOFING FELT,
SHOWN DASHED,
CONT. OVER FLASHING AND
ICE AND WATERSHIELD
ICE AND WATERSHIELD,
SHOWN DASHED,
CONT. UP WALL 12" TO
36" INSIDE EXT. F.O. BUILDING
(E) ROOF SHEATHING
(N) WALL SHEATHING
AND SIDING TO MATCH (E) BELOW
(N) ROOF FRAMING, RE: STRUC
(2) LAYERS 5/8" TYPE 'X' GYP BD.
EACH SIDE OF WALL FRAMING
(E) CEILING
(E) WALL SHEATHING
AND SIDING
(2) LAYERS 5/8" TYPE 'X' GYP BD.
EACH SIDE OF WALL FRAMING
SCHEDULED EXT. WALL
ROOF TRUSS, RE: STRUC.
(E) WALL SHEATHING
AND SIDING
R-38 BATT INSULATION
5/8" TYPE 'X' GYP. BD CEILING
(2) LAYERS 5/8" TYPE 'X' GYP BD.
EACH SIDE OF WALL FRAMING
SCHEDULED EXT. WALL
FLOOR SHEATHING, RE: STRUC.
(N) WALL SHEATHING
AND SIDING TO MATCH (E) BELOW
(N) ROOF FRAMING, RE: STRUC
2X LEDGER, RE: STRUC.
5/8" TYPE 'X' GYP. BD CEILING
SCHEDULED EXT. WALL
(N) ROOF FRAMING, RE: STRUC.
(E) EXT. WALL
(E) ROOF FRAMING
DEMO ALL (E) ROOFING AND WATERPROOFING
DOWN TO (E) ROOF SHEATHING AND REPLACE
WITH (N) ROOFING ASSEMBLY AS SHOWN,
DEMO (E) EAVE TO ALLOW FOR (N) WALL AS REQUIRED.
(2) LAYERS 5/8" TYPE 'X' GYP BD.
EACH SIDE OF WALL FRAMING
SCHEDULED EXT. WALL
(E) WALL SHEATHING
AND SIDING
(E) WALL
(E) MECH DUCT
(E) STEM WALL AND FOOTING
MOISTURE BARRIER, SHOWN DASHED
(2) LAYERS 5/8" TYPE 'X' GYP BD.
EACH SIDE OF WALL FRAMING
SCHEDULED EXT. WALL
(E) WALL SHEATHING
AND SIDING
(E) WALL
(E) MECH DUCT
(E) STEM WALL AND FOOTING
4" COMPACTED GRANULAR
BASE MATERIAL, MIN.
2" RIDGID INSULATION
4" CONC. SLAB ON GRADE,
RE: STRUC.
MOISTURE BARRIER, SHOWN DASHED
FILL CAVITY W/ RIDGID
INSULATION
PPM ROOFING
(2) LAYERS 30# ROOFING FELT,
SHOWN DASHED,
CONT. OVER FLASHING AND
ICE AND WATERSHIELD
ICE AND WATERSHIELD,
SHOWN DASHED,
CONT. FROM RAKE TO
36" INSIDE EXT. F.O. BUILDING
PPM FLASHING
ROOF SHEATHING,
RE: STRUC.
CONT. SEALANT
2X8 FASCIA BD.
EXPOSE RAFTER TAIL
PPM ROOFING
(2) LAYERS 30# ROOFING FELT,
SHOWN DASHED,
CONT. OVER FLASHING AND
ICE AND WATERSHIELD
ICE AND WATERSHIELD,
SHOWN DASHED,
CONT. FROM RAKE TO
36" INSIDE EXT. F.O. BUILDING
ROOF SHEATHING,
RE: STRUC.
1/2" T-111 SIDING PANEL
MOISTURE BARRIER,
SHOWN DASHED
SCHEDULED EXT. WALL
ROOF TRUSS, RE: STRUC.
R-38 BATT INSULATION
2X12 BLOCKING W/ (3) 3" DIA.
VENTILATION HOLES W/ BIRD SCREEN.
1X4 TRIM BD
CONT.
SEALANT
4" COMPACTED GRANULAR
BASE MATERIAL, MIN.
2" RIDGID INSULATION
4" CONC. SLAB ON GRADE,
RE: STRUC.
STEEL PIPE
HANDRAIL (PTD.)
GRIND ALL WELDS
SMOOTH;SEE SPEC
PTD. RAIL BRACKET
ANCHORED TO WALL
PER MANUF. INSTR.
TO SUPPORT A 250#
LOAD
PROVIDE 2X8 BACKING
@ ATTACHMENT
3' -0
T.
O . F
IN
IS
H
ED
F
LO
O R
SCHEDULED WALL
FINISH
4" COMPACTED GRANULAR
BASE MATERIAL, MIN.
2" RIDGID INSULATION
4" CONC. SLAB ON GRADE,
RE: STRUC.
MOISTURE BARRIER, SHOWN DASHED
SCHEDULED EXT.
WALL
WOOD BEAM
SEE STRUCTURAL
2X LOOKOUT
5/4 X 4 WOOD TRIM
PPM FLASHING W/
DRIP EDGE
ROOF SHEATHING
2X8 FASCIA,
PAINTED.PAINT UNDERSIDE
OF DECK AND
OUTLOOKERS
PLASTIC GUTTER
PPM ROOFING
(2) LAYERS 30# ROOFING FELT,
SHOWN DASHED,
CONT. OVER FLASHING AND
ICE AND WATERSHIELD
ICE AND WATERSHIELD,
SHOWN DASHED,
CONT. FROM RAKE TO
36" INSIDE EXT. F.O. BUILDING
1/2" T-111 SIDING PANEL
EXTERIOR STUD WALL
SHEATHING
MOISTURE BARRIER
BOARD & BATTEN OR
LAP SIDING
CAULK JOINT
WOOD TRIM
CAULK JOINT
BOARD & BATTEN OR
LAP SIDING
MOISTURE BARRIER
EXTERIOR STUD WALL
INTERIOR GYP. BD.
1X4 WOOD TRIM
CAULK JOINT
SHEATHING
MOISTURE BARRIER
BOARD & BATTEN
OR LAP SIDING
CAULK JOINT
BOARD & BATTEN
OR LAP SIDING
MOISTURE BARRIER
INTERIOR GYP. BD.
SCHEDULED EXTERIOR
WALL
(2) LAYERS 30# ROOFING FELT,
SHOWN DASHED,
CONT. OVER FLASHING AND
ICE AND WATERSHIELD
1X6 WOOD TRIM
1X4 WOOD TRIM
1/2" SOFFIT BD.
2X FRAMING
SEE STRUCTURAL
WOOD BEAM
SEE STRUCTURAL
1X4 WOOD TRIM
1/2" SOFFIT BD.
2X FRAMING
SEE STRUCTURAL
1/2" T-111 SIDING PANEL
R21 BATT INSULATION
WOOD BEAM
SEE STRUCTURAL
1X6 WOOD TRIM
1X4 WOOD TRIM
1/2" SOFFIT BD.
2X FRAMING
SEE STRUCTURAL
1/2" T-111 SIDING PANEL
R21 BATT INSULATION
PPM FLASHING
2X FRAMING
GYB BD. EACH SIDE
1X4 WOOD TRIM - PAINTED
2X WOOD CAP - PAINTED
2X DOUBLE TOP PLATE
5' 6"
A
FF
(E) STEM WALL AND FOOTING
4" COMPACTED GRANULAR
BASE MATERIAL, MIN.
2" RIDGID INSULATION
4" CONC. SLAB ON GRADE,
RE: STRUC.
MOISTURE BARRIER, SHOWN DASHED
NEW F.F.
EXSIT F.F.
NOT USED
CONC. SLAB OVER EXISTING
RE: STRUC.
PPM ROOFING
ST
AT
G R
S
E I
O
TE FO
Bend, Oregon
ED
ER AR
EC
T
N
REGO
TJames B. Landin
GGL
GGL
AD201
0941_AD201_DEMO FLOOR Plan
D
EM
O F
LO
O
R
PL
A
DEMO
FLOOR PLAN
SCALE: 1/8" = 1'-0"
EXISTING BUILDING
TO BE RELOCATED
ATLATER DATE
(NIC)
EXISTING WALL TO BE REMOVED
EXISTING DOOR TO BE REMOVED.
EXISTING PLUMBING FIXTURE TO BE REMOVED. CAP PLUMBING AS
REQUIRED.
EXISTING ROOF EAVE TO BE REMOVED.
KEYNOTES
PROPOSED
BUILDING ADDTION
LEGEND
EXISTING WALL TO REMAIN
EXISTING TO BE REMOVED
EXISTING WINDOW TO BE REMOVED.5
EXISTING STAIR AND HANDRAIL TO BE REMOVED. BY OWNER.6
EXISTING DECK
TO BE REMOVED AT
LATER DATE
(NIC)
EXISTING BUILDING
TO BE RELOCATED
ATLATER DATE
(NIC)
EXISTING RAMP AND HANDRAIL TO BE REMOVED. BY OWNER.7
REPAIR OR REPLACE GUARDRAIL. BY OWNER. (SHADED AREA)8
NEW STAIR AND HANDRAIL. BY OWNER. (SHADED AREA)9
EXISTING SINK TO REMAIN.10
DATE
PROJECT NAME
SHEET TITLE
PROJECT:
DRAWN BY:
CHECK:
497 SW Century Drive Suite 105 Bend, OR 97702 Tel. 541.330.6506 admin@ggl-arch.com
CONSULTANTS
© GGL Architecture LLC 2010
EM
IG
RA
N
T C
G
ER
D
IS
TR
IC
T
O
FF
IC
E
A D
D
IT
IO
N
2010/04/26
H
IG
H W
A Y
S
O
ES
O
RE
G
O N
100% SET
2010/05/06100% SET Revised
ST
AT
G R
S
E I
O
TE FO
Bend, Oregon
ED
ER AR
EC
T
N
REGO
TJames B. Landin
SHEET TITLE
PROJECT:
DRAWN BY:
CHECK:
497 SW Century Drive Suite 105 Bend, OR 97702 Tel. 541.330.6506 admin@ggl-arch.com
CONSULTANTS
© GGL Architecture LLC 2010
EM
IG
RA
N
T C
G
ER
D
IS
TR
IC
T
O
FF
IC
E
A D
D
IT
IO
N
2010/04/26
H
IG
H W
A Y
S
O
ES
O
RE
G
O N
100% SET
2010/05/06100% SET Revised
GGL
GGL
AI201
0941_Ai201_Asbestos FLOOR Plan
A
SB
ES
TO
S
IN
D
EN
TI
FI
C A
TI
O
A
A S
N
ASBESTOS INDENTIFICATION
FLOOR PLAN
SCALE: 1/8" = 1'-0"
N
ASBESTOS INDENTIFICATION CEILING PLAN
SCALE: 1/8" = 1'-0"
1 EXISTING WALL TO BE REMOVED
KEYNOTES
PROPOSED
BUILDING ADDTION
LEGEND
EXISTING FLOOR TILE TO BE TESTED FOR ASBESTOS, TO
DETERMINE IF MATERIAL IS TO BY REMOVED, ENCLOSED OR
ENCAPSULATED.
PROPOSED
BUILDING ADDTION
ASBESTOS ABATEMENT FIRMS
ASBESTOS TESTING FIRMS
GENERAL NOTES
Asbestos Abatement:
Asbestos was extensively used in building construction from the 1930s to the 1970s. In the mid-1970s, after exposure to asbestos was linked to certain types of cancer, the use of asbestos was discontinued in almost all building-related applications. Asbestos is a material that should be treated cautiously; improper or hasty removal of asbestos can often cause more problems than leaving it alone.
Dangers of Asbestos Asbestos is a generic name for a variety of strong and flexible mineral materials that are chemically inert, highly resistant to heat and virtually indestructible.
Asbestos presents a health hazard when it is friable, that is, when it is crumbled or crushed into a powder. Microscopic fibers of asbestos have about the same density as cigarette smoke. When these fibers are released into the air, they can be easily inhaled and either swallowed or trapped in the lower part of the lungs.
The first step in dealing with asbestos is to have a certified inspector determine where it is located in your building and then to assess its condition. Asbestos is present, in one form or another, in most buildings built between 1930 and 1975.
It also shows up in many older buildings that had been repaired or altered during this period.
It most commonly was used to insulate pipes and boilers. However, asbestos was also often mixed in with stucco, plaster, cement, wallboard, ceiling and floor tiles, acoustical tile, asphalt roofing shingles and tile, vinyl tiles, fireproof textiles, wallpapers, grouts and caulking compounds as a binder and fireproofing material.
Some materials are marked as containing asbestos, but if there is no obvious indication of asbestos, and the material is of an age and type that is likely to contain asbestos, assume that is does. If necessary, the material can be lab-tested for the presence of asbestos. Contact the closest office of the U.S.
Environmental Protection Agency (EPA) for more information on asbestos testing.
Once the inspector has identified the location of the asbestos in your building, the second step is to develop an abatement plan. Asbestos abatement refers to the process of removing or minimizing the health hazards of asbestos in a building through a number of prescribed actions including removal, enclosure, encapsulation or an operations and maintenance plan.
Until recently, many experts recommended that all asbestos-containing materials be removed from buildings as a matter of course. Now the EPA and others suggest that the material can remain in place if it is in good condition, provided there are no compelling reasons to remove it, such as a renovation project or plumbing alterations.
Removal Asbestos abatement by removal means that asbestos-containing materials are totally removed from the building. A common example of this would be the removal of asbestos pipe wrapping and insulation from heating pipes. The most obvious advantage of this type of asbestos abatement is that once it is gone, the need for further monitoring or maintenance of the asbestos-containing materials is eliminated.
However, the initial cost of complete abatement is usually high and the replacement of the asbestos with substitute materials performing the same function will be necessary, further adding to the cost. In addition, the asbestos must be carefully and properly removed so that the risk of asbestos exposure is minimized. If you elect to remove the asbestos, be sure that the removal is done properly.
Before hiring an asbestos contractor, verify that the firm is licensed by your state or municipality to perform asbestos abatement projects. As with all building projects, you should also carefully examine the contractor's references and previous record for safety or code violations.
Be sure that the contract clearly states that the work will be done in accordance with all federal, state and local laws, and that the contractors are performing the work with equipment that complies with U.S. Occupational Safety and Health Administration (osha) standards. A conventional renovator's mask, for example, will not screen out asbestos particles. The filters in common household or industrial vacuum cleaners are inadequate for the same reason, and they will throw asbestos fibers into the air. (For further guidance on proper equipment, contact the EPA.)
The contractor should isolate the portion of your building where the asbestos removal is taking place with sheets of plastic, and provide self-contained showers and throwaway protective suits to prevent contamination of the workers. All asbestos-containing materials need to be bagged in plastic, and proper disposal must be arranged. It is against the law to dump asbestos-containing materials in general dumps or land-fills.
An important aspect of asbestos-removal is air-monitoring by an inspector who is at the site throughout the project. The firm monitoring the project should always be completely independent of the contractor performing the work. This independent firm should set up an air monitoring station to ensure that the concentrations of asbestos fibers outside the work area do not increase appreciably during the project. Use the same standards for hiring the monitoring firm that you use for hiring the contractor.
Do not, under any circumstances, remove asbestos yourself. Asbestos is highly dangerous when it is airborne. It is far more dangerous to remove asbestos improperly than to leave it alone, no matter what its condition.
Enclosure Given the high initial cost of asbestos removal, many building owners elect to deal with asbestos in a less aggressive manner. One alternative to removal is to enclose the asbestos-containing material in airtight new construction. A common example of this is to enclose asbestos-insulated pipes with sheet-rock or plaster construction, forming, in effect, a pipe chase.
The main advantage of this treatment is that it does not require the replacement of the asbestos with a substitute material. The initial cost for enclosure is usually far less than for complete removal, although the long-term costs may be higher. The disadvantage of enclosure is that the asbestos remains and will eventually need to be removed.
Because asbestos fibers will continue to be released behind the enclosure, access to the area for maintenance and renovation will need to be controlled.
Periodic re-inspection to check for damage will also be required.
Lastly, care must to taken during construction of the enclosure to prevent the release of asbestos fibers. As with removal, an air-monitoring firm should be hired to check for any fiber release during construction.
Encapsulation A second alternative to removal is encapsulation. The treatment requires that the surface of the asbestos-containing materials be laminated or covered over with new materials or painted coatings. The most common example of this treatment is the covering of asbestos floor tile with new, sheet vinyl tile. Like enclosure, this treatment minimizes the release of asbestos fibers without the necessity of removing the material.
Encapsulated asbestos must be closely monitored to ensure that no significant fiber release is taking place. Any damage or deteriorated encapsulated surface should be repaired immediately. A disadvantage to encapsulation is the increased difficulty of total removal of the asbestos when this becomes necessary. Lastly, the long-term costs may be higher than for immediate removal.
Special Operations (Monitoring and Maintenance) The last option is to leave the asbestos-containing material in place, provided there is no evidence that asbestos fibers are being released. For example, if you have a roof composed of asbestos shingles, it may be reasonable to leave the shingles in place and set up regular inspections to check for evidence of deterioration. The main advantage of this treatment is that it has the lowest initial cost of any abatement alternative. However, the asbestos source remains and periodic inspection will be required to assess the condition of the material and its potential for erosion or disturbance.
Conclusion Asbestos-related problems in older buildings should be addressed in a rational manner. Ignoring the potential problems of asbestos is irresponsible, but careless and hasty removal without proper safety precautions is also irresponsible, and can lead to even greater problems. The best course of action is to identify asbestos-containing materials in your building, ascertain their condition and then develop an abatement plan that addresses any hazardous or potentially hazardous conditions in a deliberate and responsible manner.
CHECK LIST FOR DETERMINING CONTRACTOR QUALIFICATIONS
1. Regardless of how you may feel about a particular contractor, always ask for a list references from previous projects. That list should include persons willing to describe the reliability of the contractor and the quality of work performed by the contractor.
2. All asbestos contractors must have an Oregon DEQ asbestos abatement license and use only Oregon certified workers and supervisors.
3. You may also want to ask your contractor to provide air-monitoring data from previous projects done in accordance with Oregon OSHA or Oregon DEQ requirements. That information can also help you determine if the work habits and general procedures that contractor uses are acceptable.
4. All contractors must have written standard operating procedures and employee protection plans which include specific reference to Oregon OSHA medical monitoring and respirator training programs. In addition, the contractor must make available a copy of the Oregon OSHA and the DEQ asbestos rules.
(Oregon rules: under OAR 340-248-0005 through - 0290.)
5. Contractors must also provide a list of any penalties that the contractor has paid due to not completing contractual requirements, because of cost overruns, and/or liquidated damages.
6. Any citations levied against the contractor by any Federal, State, or local government agencies for violations related to asbestos abatement should be identified by the contractor. Included with that information should be the name or project location, the date(s) of the project, and how the allegations were resolved.
7. Contractors should also supply a description detailing all legal proceedings, lawsuits, or claims that have been filed or levied against them or any of their past or present employees for asbestos related activities.
8. The contractor should also supply a list of all equipment that will be used for asbestos work. That list should include negative air machines, HEPA vacuums, the type of respiration equipment they will use, scaffolding, decontamination facilities, disposable clothing, etc.
Hemphill Green & Associates Bend, OR 97701 541-549-1966
PBS Engineering + Environmental 390 NE Emerson Ave, Ste C Bend, OR 541-388-9290
Paulsen Environmental Consulting 541-389-5481
Alpine Abatement Associates, Inc.
PO Box 1557 Bend, OR 97709
(541) 388-2672
Cascade Insulation, Inc.
22356 Nelson Road Bend, OR 97701
(541) 388-2600
EXISTING CARPET OVER FLOOR TILE TO BE TESTED FOR
ASBESTOS, TO DETERMINE IF MATERIAL HAS BEED ENCLOSED OR
ENCAPSULATED PROPERLY OR IF IT IS REQUIRED TO BY
REMOVED, ENCLOSED OR ENCAPSULATED.
EXISTING CEILING TILE TO BE TESTED FOR ASBESTOS, TO
DETERMINE IF MATERIAL IS TO BY REMOVED, ENCLOSED OR
ENCAPSULATED.
EXISTING GYPSUM BOARD CEILING
ST
AT
G R
S
E I
O
TE FO
Bend, Oregon
ED
ER AR
EC
T
N
REGO
TJames B. Landin
File details come from the government source that posted it. Updated .