Amendment 1_SF30 Cape.doc

DOC document 52 KB Posted

Attached to
RECOVERY Cape Perpetua Recreational Water and Wastewater System Upgrades
Solicitation number
AG-0489-S-10-0481
Issued by

About this file

AMENDMENT 1

View the file

Other files

File Type Posted
002-Drawings2of4.pdf PDF
008-GeotechnicalReport.pdf PDF
011-ContractorPerformanceDataSheet.doc DOC document
004-Drawings4of4.pdf PDF
003-Drawings3of4.pdf PDF
009-Fire Protection.pdf PDF
007-StatementofWork.pdf PDF
006-Specifications2of2.pdf PDF
001-Drawings1of4.pdf PDF
AG-0489-S-10-0481.pdf PDF
005-Specifications1of2.pdf PDF
010-OR55Bldg.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Approval 2700-0042

1. CONTRACT ID CODE
PAGE

OF

PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1
1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
One (1)
18 MAY 2010
6. ISSUED BY
CODE

7. ADMINISTERED BY (If other than Item 6)

CODE

US Forest Service

EROC Northwest

16400 Champion Way

Sandy, OR 97055

8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and ZIP: Code)
(()
9A. AMENDMENT OF SOLICITATION NO.

AG-0489-S-10-0481

X
9B. DATED (SEE ITEM 11)

March 29, 2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

FORMCHECKBOX

is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A.

THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C.

THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D.

OTHER Specify type of modification and authority)

E. IMPORTANT: Contractor

FORMCHECKBOX

is not, FORMCHECKBOX is required to sign this document and return ____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Section 01 78 23 Operation and Maintenance Data, 1.3 Scheduling, Replace subsection C in its entirety and replace with the following:

C. Furnish two complete sets of operation and maintenance data to Contracting Officer for review by 40% construction point, or no later than 4 weeks after start of construction, whichever comes first. Operations and maintenance data will be reviewed for completeness by Contracting Officer and forwarded to Oregon Department of Environmental Quality (DEQ) for review by 50% construction point, in accordance with state requirements. Provide information and materials as requested to address review comments of Contracting Officer and/or DEQ promptly; failure to do so may delay final inspection.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

MONTY BELL – CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

BY ____Monty Bell______ (Signature of Contracting Officer) May 18, 2010

NSN 7540-01-152-8070

30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE

Computer Generated Prescribed by GSA

FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .