| File | Type | Posted |
|---|---|---|
| Amendment 1_SF30 Cape.doc | DOC document | |
| 002-Drawings2of4.pdf | ||
| 008-GeotechnicalReport.pdf | ||
| 011-ContractorPerformanceDataSheet.doc | DOC document | |
| 004-Drawings4of4.pdf | ||
| 003-Drawings3of4.pdf | ||
| 009-Fire Protection.pdf | ||
| 007-StatementofWork.pdf | ||
| 006-Specifications2of2.pdf | ||
| 001-Drawings1of4.pdf | ||
| 005-Specifications1of2.pdf | ||
| 010-OR55Bldg.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-0489-S-10-0481
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
04/29/2010
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
397089
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
USDA Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
Willamette National Forest ATTN: Contracting 3106 Pierce Parkway, Suite D Springfield, OR 97477-7909
9. FOR INFORMATION
CALL:
A. NAME
Craig Evans (Technical) Monty Bell (Contracting)
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 541-750-7083 541-750-7114
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
TAS::12 1102::TAS RECOVERY
THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) PROCUREMENT.
Cape Perpetua Recreational Area, Wastewater System Upgrades Siuslaw National Forest, Central Coast Ranger District, Lincoln County, Oregon
Price Range: The Government's estimate is between $500,000 and $1,000,000.
This proposed procurement listed herein is Unrestricted Competition per FAR 19.10 The Small Business Competitiveness Demonstration Program.
Facsimile proposals will not be accepted.
11. The Contractor shall begin performance within 10 calendar days and complete it within 150 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 4:00 pm (hour) local time 05/27/2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)
AG-0489-S-10-0481
Siuslaw National Forest Central Coast RD, Cape Perpetua
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
USDA Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, r equirements identified on this form and any continuation sheets for the consideration stated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award c onsummates the c ontract, w hich c onsists of ( a) t he Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
Siuslaw National Forest
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Cape Perpetua Recreational Area, Wastewater System Upgrades, 2010
Siuslaw National Forest, Central Coast Ranger District Lincoln County, Oregon
Base Item: New Water Distribution System - Campground Only
PAY
ITEM
NO.
DESCRIPTION MM UNIT EST
QUANTITY
UNIT
PRICE
TOTAL
PRICE
A-1 Mobilization LSQ L.S. All Req'd $ $
A-2 Erosion Control LSQ L.S. All Req'd $ $
A-3 Selective Site Demolition LSQ L.S. All Req'd $ $
A-4 Site Preparation LSQ L.S. All Req'd $ $
A-5 Gravel Surface Restoration AQ S.Y. 160 $ $
A-6 ADA Accessible Campground Hydrants AQ EA 18 $ $
A-7 1-1/2" Water Services AQ EA 4 $ $
A-8 2" Water Line AQ L.F. 1,285 $ $
A-9 4" Water Line AQ L.F. 3,580 $ $
A-10 Miscellaneous Pipe Fittings and Appurtenances at Well House
LSQ L.S. All Req'd
A-11 New Modular Well House LSQ L.S. 1 $ $
A-12 Control Equipment - Electrical (Well House) LSQ L.S. 1 $ $
A-13 Project Closeout / Operation and Maintenance Manuals LSQ L.S. All Req'd $ $
Total Base Item: Campground Water: $
AG-0489-S-10-0481
Siuslaw National Forest
Optional Item 1 - Water to Devil's Churn
ITEM
NO.
DESCRIPTION MM UNIT AMOUNT UNIT
PRICE
TOTAL
PRICE
1.1 Temporary Work Zone Traffic
Control, Complete
LSQ L.S. All Req'd
1.2 Trenchless Water Crossing Under
Highway AQ L.F. 70 $ $
1.3 3" Waterline (inc. fittings and backfill) AQ L.F. 850 $ $
1.4 Pavement Restoration in Shoulders AQ S.Y. 217 $ $
Total Optional Item 1: $
Optional Item 2 - Water to Visitor's Center
ITEM
NO.
DESCRIPTION MM UNIT AMOUNT UNIT
PRICE
TOTAL
PRICE
2.1 Temporary Work Zone Traffic Control, Complete
LSQ L.S. All Req'd $ $
2.2 3" Waterline (inc. fittings, backfill) AQ L.F. 670 $ $
2.3 Pavement Restoration in Shoulders AQ S.Y. 186 $ $
Total Optional Item 2: $ Total Water (Base + Optional Items 1 & 2): $
Base Item: Wastewater System Improvements
ITEM
NO.
DESCRIPTION MM UNIT AMOUNT
UNIT
PRICE
TOTAL
PRICE
B-1 Mobilization/Demobilization LSQ L.S. All Req'd $ $
B-2 Erosion Control LSQ L.S. All Req'd $ $
B-3 Selective Site Demolition LSQ L.S. All Req'd $ $
B-4 Site Preparation LSQ L.S. All Req'd $ $
B-5 6' Chain-Link Fence AQ L.F. 295 $ $
B-6 6" Sanitary Sewer Pipe AQ L.F. 183 $ $
B-7 12,000 Gallon Septic Tank AQ Each 1 $ $
B-8 18,000 Gallon Settling (Septic) Tank LSQ L.S. 1 $ $
B-9 Effluent Treatment System (ARX Modules, Blowers, Pumps)
LSQ L.S. 1 $ $
B-10 Effluent System Control Panel LSQ L.S. 1 $ $
B-11 Electrical Service at Treatment Plant LSQ L.S. 1 $ $
B-12 Project Closeout / Operation and Maintenance Manuals
LSQ L.S. All Req'd $ $
Total Wastewater Base Item: $
Optional Item 3 – Wastewater -- Replace 3” Force Main to Effluent
ITEM
NO.
DESCRIPTION MM UNIT AMOUNT
UNIT
PRICE
TOTAL
PRICE
3.1 Temporary Work Zone Traffic
Control
LSQ L.S. All Req'd $ $
3.2 3" PVC Forcemain (inc. fittings, backfill)
AQ L.F. 2360 $ $
3.3 Pavement Restoration in Shoulders AQ S.Y. 656 $ $
3.4 Trenchless Sewer Crossing Under
Visitor Center Entrance
AQ L.F. 50 $ $
Total Optional Item 3:
Total Wastewater (Base + Optional Item 3)
Grand Total (Water + Wastewater+ Optional Items 1, 2 & 3) $ ___________________
Where conflicts exist between the attached Architecture & Engineering firm’s specifications and the Solicitation, the Solicitation takes precedence.
Signature Date
TIN _____________________________ DUNS ________________________________
EMAIL _________________________________________
Be sure to enter GRAND TOTAL (Base + all options) PRICE in Block 17 on page 2 of Standard Form 1442.
AG-0489-S-10-0481
Siuslaw National Forest
For technical questions, contact Craig Evans at 541-750-7083 or email cgevans@fs.fed.us.
Send all requests for information or questions on this solicitation by email to: Monty Bell (mlbell@fs.fed.us), Sheila Finney (sfinney@fs.fed.us) and Craig Evans (cgevans@fs.fed.us).
The estimated start work date is July 12, 2010. All work shall be completed within 150 calendar days after the effective date of the Notice to Proceed. (See Section H for time restrictions.)
BASIS OF AWARD: One contract will be awarded to the responsive and responsible offeror offering the lowest total acceptable offer. Where extended unit prices do not agree with totals or subtotals shown by Offeror, the unit prices shall govern except as provided under FAR 14.406, Mistakes in Bids.
Offers shall be submitted for the total item. Offers for less than the total item will not be considered.
If offeror does not intend to charge for a pay item, a price of “0” or “NO COST” should be shown. If the price is left blank or shown as “No Bid,” the entire offer may be considered Non-Responsive.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under A-1 or B-1 Mobilization.
Offerors must respond to the other factors as described under EVALUATION FACTORS in Section M. Award will be made on the best value for the Government.
No award shall be made to a Contractor not registered in the Central Contractor Registration (CCR) database. (Section I)
Contract award with a value of $100,000 or more, the Contractor must also be registered with VETS-100 (http://www.vets100.com/Vets100Search.htm). (Section K)
Contractors shall provide Representation and Certifications electronically at the ORCA website, https://orca.bpn.gov (Section K)
AG-0489-S-10-0481
Siuslaw National Forest Central Coast RD, Cape Perpetua mailto:cgevans@fs.fed.us� mailto:mlbell@fs.fed.us� mailto:sfinney@fs.fed.us� mailto:cgevans@fs.fed.us� http://frwebgate.access.gpo.gov/cgi-bin/leaving.cgi?from=leavingFR.html&log=linklog&to=http://www.vets100.com/Vets100Search.htm�
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
Scope of Contract
RECOVERY-- This work consists of providing construction services for Water and Wastewater Systems Upgrades at the Cape Perpetua Recreational Area.
Project Location
The project can be located a s follows: The Cape Perpetua Recreational Area is located on the Oregon Coast, approximately 3 miles south of Yachats, Oregon, between Newport, OR and Florence, OR along Hwy 101. The Cape Perpetua Recreational Area includes the Devil’s Churn Wayside, the Cape Perpetua Campground, and a Visitor’s Center.
C-2 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-3 SPECIFICATIONS
FAR 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS FPMR
PART 101-29 (AUG 1998)
(a) The GSA Index of Federal Specifications, Standards and Commercial Item Description, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--
GSA Federal Supply Service Specifications Section, Suite 8100 470 East L'Enfant Plaza SW Washington, DC 20407 Telephone (202) 619-8925 Facsimile (202) 619-8978.
(b) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.
(End of provision)
Siuslaw National Forest
FAR 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF
FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS (JUN 1988)
The specifications cited in this solicitation may be obtained from:
Specification Address
ASTM Standards American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103
(215) 199-5462
AASHTO Standards American Association of State Highway and
Transportation Officials 341 National Press Building Washington, D.C. 20024
OSHA Standards Occupational Safety and Health Administration
Online: http://www.osha.gov/ Street Address: 200 Constitution Avenue, NW Washington, D.C. 20210
ANSI/NSF American National Standard Institute Online: http://www.nsf.org/ http://www.ansi.org/
AWWA American Water Works Association
Online: http://www.awwa.org/
ODEQ Oregon Department Environmental Quality
Online: http://www.oregon.gov/DEQ/ http://www.deq.state.or.us/wq/onsite/rules.htm
DHS Oregon of Department of Human Services Public Health division
Online: http://www.oregon.gov/DHS/ph/index.shtml
UL Underwriters laboratories Online: http://www.ul.com/
NEC National Electric Code Online: http://www.necplus.org/default.aspx
IEEE Institute of Electral and Electronic Engineers
Online: http://www.ieee.org/portal/site
ODOT Oregon Department of Transportation
Online: http://www.oregon.gov/ODOT/
AG-0489-S-10-0481
Siuslaw National Forest
The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.
(End of clause)
C-4 SUBMITTALS
Submittals shall include the following unless otherwise required in the specification:
1. Date and revision dates.
2. Project name and contract number.
3. Names of Contractor, subcontractor, supplier, and manufacturer.
4. Specifications section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor's stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents. Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.
(End of clause)
C-5 PRODUCT SAMPLES AND/OR SUBMITTALS
The following product samples and/or submittals are required for this project:
Title Referenced by Specification No
Time of Government Approval After Submittal
Schedule of Work FAR 52.236-15 7 Business days Site Specific Safety Plans Statement of Work 15 Business Days Quality Control: Quality Control Plan 01 45 00 15 Business Days Temporary Facilities and Controls:
Traffic Control Plan 01 50 00 15 Business Days
Project Closeout: Closeout Submittals 01 77 00 15 Business Days Utility Line Removal: Schedule of Shutting Off Utility Services 02 41 13.23 15 Business Days
Cast-in Place Concrete:
Product Data-Proposed Mix Design 03 30 00 15 Business Days
General Technical Provisions: See 1.5 Material Submittals of the Reference 26 00 01 15 Business Days
Basic Materials and Methods: See 1.3 (Various Products) 26 00 02 15 Business Days
Controls and Instrumentation:
Submittals, See 1.7 of the Reference 26 00 03 15 Business Days
Qualification Statements.
See 1.3 C of Reference 26 00 03 15 Business Days
Controls and Instrumentation: Initial Submittals, See 1.8 of the Reference 26 00 03 15 Business Days
Controls and Instrumentation: Final Submittal, Operation and Maintenance Manual
26 00 03 15 Business Days
AG-0489-S-10-0481
Siuslaw National Forest
Specialized Electrical Materials: See 1.2, and 2.1-2.11 of the Reference 26 00 04 15 Business Days
Trenching and Backfilling 31 23 33 15 Business Days Trenchless Utility Installation: See 1.4 and 1.5 of Reference 33 05 23 15 Business Days
Water Utility Distribution Piping: Product Data 33 11 00 15 Business Days
Sewer Piping 33 31 00 15 Business Days Sanitary Utility Sewerage Force Mains:
Product Data, Design Data, Manufacturer’s Installation Instructions, and Manufacturer’s Certificate.
33 34 00 15 Business Days
Septic Tanks: Manufacturer’s Literature 33 36 00 15 Business Days Wastewater Effluent Treatment System:
Shop Drawings and Manufacturer’s Literature
33 37 00 15 Business Days
Manhole Equipment 33 39 13 Electrical Utilities: Product Data and Cut Sheets 33 71 00 15 Business Days
Underground Control Cable and Power Distribution: Conduit, Splice Box, Metallic Core Marking Tape
33 71 01 15 Business Days
C-6 SHOP DRAWINGS
The following shop drawings shall be submitted on this project:
Title Referenced by Specification No
Time of Government Approval After Submittal
General Technical Provisions See 1.5-, 1.10 Shop Drawings of the Reference
26 00 01 15 Business Days
Basic Materials Various Products 26 00 02 15 Business Days
Specialized Electrical Materials See 1.2 of the Reference 26 00 04 15 Business Days
Trenches Utility Installation See 1.4 B of the reference 33 05 23 15 Business Days
Septic Tanks 33 36 00 15 Business Days Sanitary Utility Sewerage Force Mains:
Shop Drawings 33 34 00 15 Business Days
Electrical Utilities: Shop Drawings for Handholes 33 71 00 15 Business Days
C-7 MATERIAL CERTIFICATIONS AND TESTING REPORTS
The following material certifications and/or testing reports shall be submitted on this project:
Title Referenced by
Specification No Time of Government Approval After Submittal
Concrete Testing 01 45 00 15 Business Days Pipe Leakage Testing 01 45 00 15 Business Days Start up Testing 01 45 00 15 Business Days Septic Tank Testing 01 45 00 15 Business Days Electrical Testing See 1.8 of Reference
01 26 01 15 Business Days
Preliminary Test, Tests, Final Test See 3.13, 3.14, 3.15
26 00 01 15 Business Days
Manufacturer Approval See 1.4 D of reference
26 00 03 15 Business Days
Trenching and Backfilling:
Imported Materials
31 23 33 15 Business Days
Weed Free Straw 31 25 00 15 Business Days Asphalt Concrete 32 10 01 15 Business Days Base Rock 32 10 01 15 Business Days Chain Link fencing 32 31 13 15 Business Days Compaction Testing 33 05 23 15 Business Days Bacteriological and Residual Chlorine Lab Test
33 11 00 15 Business Days
Pressure Test 33 11 00 15 Business Days Low Pressure Air Test 33 31 00 15 Business Days Compaction Testing 33 36 00 15 Business Days Compaction, Pressure Testing 33 34 00 15 Business Days Septic Tanks OAR 340-073-0025, (3)
Water tightness 5 calendar days
C-8 CSI SPECIFICATIONS
See the following:
• Statement of Work, 3 Pages
• PDF file, 175 Pages, Title “Technical Specifications, Cape Perpetua, Water and Wastewater
System”, March 2010; Prepared by Cascade Design”.
• PDF file, 35 Pages, Title “Cape Perpetua, Water and Wastewater System”, March 31, 2010, Prepared by Cascade Design.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
Siuslaw National Forest
SECTION E--INSPECTION AND ACCEPTANCE
E-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
E-2 AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at project site.
E-3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT
The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Supplemental Specifications.
E-4 CONFORMITY WITH PLANS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
Central Coast RD, Cape Perpetua http://www.arnet.gov/far/�
SECTION F--DELIVERIES OR PERFORMANCE
F-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
52.242-14 Suspension of Work (APR 1984)
F-2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 150 calendar days from the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
F-3 SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.
Central Coast RD, Cape Perpetua http://www.arnet.gov/far/�
SECTION G--CONTRACT ADMINISTRATION DATA
G-1 AGAR 452.215-73 POST AWARD CONFERENCE (FEB 1988)
A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held at the Headquarters of the Siuslaw National Forest, OR, 4077 SW Research Way, Corvallis OR.
G-2 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible or any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 POTENTIAL SAFETY HAZARDS
(a) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all-inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.
(b) The following checked activities have been identified by the Government as potential safety hazards.
[X] Confined space entry.
[X] Temporary excavation/deep trenching/slope stability.
[X] Tree falling.
[X] Fall hazard from work heights exceeding six feet.
[ ] Blasting.
[X] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
[X] Heavy equipment operation.
[ ] Tree climbing and/or tower climbing.
[X] Fire hazards.
[X] Hazardous materials handling.
[X] Electrical hazard.
[X] Hydraulic and/or pneumatic and/or other high pressure hazards.
[X] Mechanical hazards such as pulleys, springs, etc.
[X] Other __________________________________
H-2 INDUSTRIAL CAMPS
Forest Service regulations for Use of Campgrounds prohibit occupancy of developed recreation sites for other than primarily recreation purposes. No industrial camping will be authorized at these sites.
A special use permit is required on National Forest land for industrial camps. These permits are to be obtained by the Contractor through the Contracting Officer. Such permission, if granted, will be without charge to the Contractor but may include use restrictions.
One self-contained camp unit will be allowed at each staging area and equipment or supply dump for use by a watchman.
H-3 SALVAGE RIGHTS
No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.
Existing Concrete Septic Tanks to be removed.
H-4 SPECIAL EQUIPMENT CLEANING REQUIREMENTS
All earth moving equipment (loaders, excavators, dump trucks, etc.) moved to the job site shall be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands. Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.
Equipment shall be made available for visual inspection by the Forest Service prior to entering Forest Service lands. The Contractor shall advise of a proposed date for mobilization. Inspections will take place at mutually agreeable en-route locations in advance of entry onto National Forest lands.
Special care shall be taken to assure removal of the following noxious weeds and their seeds:
spotted knapweed (Centaurea maculosa) diffuse knapweed (C. diffusa) yellow starthistle (C. solstitialis) gorse (Ulex europaeus) rush skeletonweed (Chondrilla juncea) tansy ragwort (Senecio jecobaea) purple loosestrife (Lythrum salicaria) distaff thistle (Carthamus lanatus) scotch broom (Cytisus scoparius)
The Contractor shall take special care under this contract to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This shall include daily inspection and cleaning as appropriate.
H-5 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the Drawings and in the specifications are the result of site investigations by USDA Forest Service personnel and the A&E firm that delivered the design package for the upgrades for the Cape Perpetua Recreational Area .
(b) Weather conditions.
Check local weather conditions. Assistance for weather conditions may be checked at the weather channel (http://www.weather.com/) and other relevant websites.
H-6 FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.
Central Coast RD, Cape Perpetua http://www.weather.com/�
(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges.
Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
Utilities Available Rate to be charge Restrictions on Use Water No Charge Reasonable, as determined by CO Toilets No Charge Reasonable, as determined by CO Electricity No Charge Reasonable, as determined by CO
H-7 LANDSCAPE PRESERVATION
(a) Prior to excavation, the Contractor shall remove the organic surface layer of soil, including grass and small plants within the clearing limits, stockpile separately and redistribute these materials over the finished slopes on the project as directed by the Contracting Officer. The conserved organic soil layer will be approximately 6” in thickness in all locations where practical and shall be removed with a smooth-edged excavator bucket or other similar tool that is capable of separating the upper organic layer of soil from the lower soil. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawn, or natural features not designated for treatment. The Contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits.
Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states. If a spill of petroleum product should occur in water, the Contractor shall take immediate action to clean up or contain the spill, then immediately notify the Oregon Emergency Response System (OERS), telephone 1-800-452-0311 or 1-503-378-4124, and then immediately notify the Contracting Officer.
Contractor shall have a SPILL RESPONSE KIT on the project whenever equipment is operating. The spill kit shall be sufficient to absorb 34 gallons of oil, designed to float on the surface, while absorbing oil and repelling water.
Oil absorbing mats are required under all stationary equipment, or equipment being serviced within the Forest Boundary to prevent leaking or spilled petroleum base products from contaminating soil and water resources. Such material will be furnished by Contactor and approved by Contracting Officer.
Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
Equipment shall be furnished on a fully operational basis, of modern design and in good operating condition with no fuel or oil leaks. Repairs and move-in/move-out are the Contractor’s responsibility.
All equipment shall be power washed and shall be clean prior to entering Forest Service Land.
(c) No objectionable material shall be allowed to enter any stream, river, lake, or other body of water. Material which falls in these areas shall be retrieved and disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the project limits shall be repaired as directed by the Contracting Officer.
(d) The Contractor shall not operate equipment or otherwise disturb the natural vegetation and soil beyond the areas flagged on the ground or beyond two feet from edge of walkways, top of cuts, or toe of fills.
(e) The Contractor will make every reasonable attempt to preserve the scenic and natural environment along this construction project.
H-8 VALUE ENGINEERING
Value engineering change proposals which change the service or function of a facility or produce irreconcilable conflicts with management objectives will not be considered.
The following work is excluded from consideration under the Value Engineering clause:
NONE
(End of clause)
H-9 PRODUCT SUBSTITUTION
Any modification of items, designs, materials, products or equipment (including Government- Furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
H-10 ROAD USE AND MAINTENANCE
Use of Roads
(a) The Contractor is authorized to use roads within the Cape Perpetua Recreational Area to access this project.
1. State laws governing traffic rules and equipment requirements on State and County highways.
2. Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use of vehicles or equipment in excess of State legal highway loads or posted limits without valid State or Forest Service overload permits, damaging a road while using it, and blocking a road open to use by others, except as may otherwise be provided in the contract.
Traffic Control
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the project crosses or coincides with an existing road or trail.
H-11 USE OF ROADS BY CONTRACTOR
The Contractor is authorized to use all roads under the jurisdiction of the Forest Service that are open and necessary for direct route access to the contract work sites for all activities necessary to complete this contract. This authorization is subject to the limitations described below, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Keep existing roads open to all traffic during contract work, and maintain them in a condition that will adequately accommodate traffic. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a Written Plan for the satisfactory handling of traffic has been approved. Post Traffic Control Signs and Devices in conformance with Oregon OSHA, Oregon Department of transportation, industry standards, and the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.
Before shutting down any operations, leave all travel-ways in a condition suitable for traffic.
Unless otherwise provided, traffic delays may not exceed 30 minutes.
If the Contractor requests use of a National Forest road or road segment not listed above, the Forest Service may authorize such use if not in conflict with the current Road Rules document.
Authorization to use such additional roads may include maintenance requirements and use limitations.
(End of clause)
H-12 TANK TRUCK
Comply with the requirements under Fire Precautionary Measure 1 – Tank Truck (Section J).
H-13 CONTROL OF MATERIAL
(a) Rights In and Use of Materials: The Contractor may use on the project suitable stone, gravel, or sand encountered in the excavation.
(b) Excavation: Unclassified.
(c) Material Sources:
1. Borrow sources, if needed, must be approved in advance by the Contracting Officer. Such borrow sources shall be restored to a natural appearance.
2. Rocks and mineral soil excavated within the normal excavation shall be conserved and used as needed.
(d) Storage and Stockpiling of Materials: Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service administered land, approved by the Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by the Forest Service shall be restored at the Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered lands.
(e) Earthwork Tolerances: Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
H-14 CONSTRUCTION STAKES, LINES AND GRADES
(a) The CO will mark with flags the project control points. The flags and stakes constitute the field control from which the Contractor shall execute the work, and shall be left in place until the CO approves their removal.
(b) The Contractor shall do all further surveying, staking, and engineering to establish the horizontal and vertical control necessary to result in having the finished work comply with the lines and grades shown on the Drawings or stated in the specifications. This work is incidental to the pay items.
(c) If any construction control points have been destroyed or displaced, or are erroneous, the Contractor shall promptly notify the CO. If these points are destroyed or displaced due to Contractor's negligence or operation, the cost for replacing them will be charged to the Contractor.
(d) In case of any construction changes, the Contractor shall cooperate with the CO and facilitate the prompt reestablishment of the field control for the adjusted work.
H-15 PROSECUTION OF WORK
(a) Construction activity shall be limited to the hours between 8:00 a.m. and 5:00 p.m., Monday through Friday, unless other hours are approved in writing by the Contracting Officer. The Contractor shall conduct activities so that interference with the public shall be kept at a minimum.
The project site shall be open to public access and free of hazards on weekends. Any activities requiring closure to the public shall be scheduled with the CO at least 7 days in advance.
(b) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.
(c) Contractor shall coordinate construction work with CO. Contractor shall submit a Schedule of Work prior to Commencement of Work. Schedule of Work shall be updated as work progresses and as requested by CO. Submit Schedule of Work within 7 business days. Schedule of Work shall be approved by CO.
(d) Motorized trail construction equipment, with a wheel base less than 40 inches may be used on this project. Operation of all equipment shall be confined to the limits of the work area and clearing limits, except where specifically authorized by the CO. Motorized equipment can be used only for the transportation of construction materials.
H-16 PROTECTION OF IMPROVEMENTS
Unless otherwise agreed to in writing, Contractor shall remove existing minor improvements to remain within the work area and reinstall them to their approximate existing locations. Prior to removal obtain approval from CO.
H-17 SANITATION REQUIREMENTS
Unless substitute measures or equipment are authorized in writing by the Contracting Officer, protection of air and water quality will include the use of approved chemical toilets by all persons working under this contract while they are within the boundaries of the Forest. Such facilities shall be furnished by Contractor in quantities and at locations approved by the CO. No habitation or overnight dwelling by employees of Contractor will be permitted on National Forest land without advance written approval from the Contracting Officer.
H-18 STATE PERMITS
Roads in the project work area necessary to complete the project are designated as "within the immediate construction project" for consideration under ORS 767.025 as to the non-applicability of PUC requirements.
(End of clause)
AG-0489-S-10-0481
Siuslaw National Forest
H-19 FINAL CLEANUP
Contractor shall remove and dispose all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to refuse such as tin cans, aluminum foil, glass, paper, garbage, used engine oil, oil filters, oil cans, grease cartridges, etc. The Contractor shall also remove and dispose of upon completion of the construction, all stakes, flagging, and similar debris within the project area. This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed off National Forest Land and in accordance with State and Local disposal requirements.
H-20 PROTECTION OF CULTURAL RESOURCES
Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (PL 96-95 and 36 CFR 261.9(e)) shall be identified on the ground by Forest Service. Forest Service may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object which is or may be entitled to protection under these Acts regardless of when the area, object or artifact is discovered or identified. Discovery of such areas or objects by either party shall be promptly reported to the other party.
Contractor shall protect all known and identified historic or prehistoric sites, buildings, objects and properties related to American history, architecture, archaeology and culture against destruction, obliteration, removal or damage during Contractor's Operations. In accordance with 36 CFR 296.14(c), Contractor shall bear costs of restoration, provided that such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.
Wheeled or track-laying equipment shall not be operated within such areas except on roads. Unless agreed otherwise, trees will not be felled into such areas.
H-21 PROTECTION OF HABITAT OF ENDANGERED, THREATENED, AND SENSITIVE
SPECIES
Location of areas needing special measures for protection of plants or animals listed as threatened or endangered under the Endangered Species Act of l973, as amended, or as sensitive by the Regional Forester under authority of FSM 2670, have been identified on the ground. Measures needed to protect such areas have been included elsewhere in this contract or are as follows:
On September 7, 2010 Cape Perpetua Campground will close to the public. Work for Water System Upgrades at Cape Perpetua Campground shall not commence before the closing date. Other work such as, Water System Upgrades at Devils Churn and at the Visitor’s Center (Option Item 1 and Option Item 2) or Wastewater System Upgrades, are excluded from this restriction.
Between 1 April and 6 August no heavy equipment shall be used in areas greater than 100 yards from Highway 101. Power tools that emit noise above ambient levels are also restricted. These restrictions are in place to protect known marbled murrelets nest sites from disturbances that are above ambient noise levels.
If protection measures prove inadequate, if other such areas are discovered, or if new species are listed as Federally threatened or endangered or as sensitive by the Regional Forester, Forest Service may either cancel or unilaterally modify this contract to provide additional protection regardless of when such facts become known. Discovery of such areas by either party shall be promptly reported to the other party.
H-22 METHODS OF MEASUREMENT
One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:
(a) Designed Quantities (DQ). These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:
(1) As a result of changes in the work authorized by the Contracting Officer.
(2) As a result of the Contracting Officer determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.
(c) Actual Quantities (AQ). These quantities are determined from measurement of completed work.
(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.
(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job.
They will not be measured.
H-23 STATE ELECTRICAL INSPECTION AND COUNTY BUILDING PERMITS
The Contractor shall arrange for and provide the State Electrical inspection. When requesting the inspection, inform the Building Permit Department of the federal limitation described below. The Contractor shall not obtain any building permits or inspections other than the State Electrical inspection.
Federal law [validated by the State Attorney General, Oregon Department of Justice] verify that the Federal Government and its Contractors may be exempted from State/Local Building Permits and Fees for projects located on Federal Installations [including all federal lands]. Contractor State Licenses will not be jeopardized by following this requirement to avoid the State/County permit system. This applies to the prime Contractor and all subcontractors.
H-24 AGAR 452.228-71 INSURANCE COVERAGE (NOV 1996)
Pursuant to FAR clause 52.228-5, Insurance - Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a…