AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Five (5) May 26, 2010
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service EROC - Northwest
16400 Champion Way Sandy, OR 97055
USDA Forest Service EROC - Northwest
16400 Champion Way Sandy, OR 97055
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0489-S-10-0337
Fire Lookout Rehabilitation, Malheur NF
9B. DATED (SEE ITEM 11)
03/19/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE
SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendme nt you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is re ceived prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORIT Y OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return __ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
This solicitation is amended as shown on the attached pages.
Except as provided herein, all terms and conditions of the document ref erenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ROBERT WILLIAMS, CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Prev ious edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation AG-0489-S-10-0337
Malheur N.F. Fire Lookout Rehabilitation
Amendment 5
1. Replace Clause F.2 with the following:
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within __10__ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than __30___ calendar days. The time stated for completion shall include final cleanup of the premises. Work is estimated to begin on September 15, 2010. A partial notice to proceed will be issued approximately August 15, 2010 to allow the contractor to obtain materials and to obtain approval of submittals. The count of contract time will not commence until the notice to proceed is issue for all on-site work.
2. Replace the Schedule of Items, pages 4 and 5, with the attached pages. These changes correct the schedule by moving the stairs from subitem 2.2a to subitem 2.1a for items 2, 3, 4 and 5.
Solicitation: AG-0489-S-10-0337 REVISED – AMENDMENT 5 PAGE 4 of 77 Fire Lookout Rehabilitation
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
ITEM NO. DESCRIPTION QUANTITY M OF M UNIT PRICE TOTAL
SCHEDULE OF ITEMS
ITEM 1
Lookout Rehabilitation
Indian Rock Lookout
1.1a Mobilize Equipment & materials; clean up site
2.1a Catwalk & Handrails
2.2a Install catwalk decking
3.1a Painting all items
LS
SF
Total Item 1
ITEM 2
Flagtail Lookout
2.1a Catwalk, handrails, access hatch, welded wire fabric, and stairs
4.1a Reroof cab
4.2a Remove & dispose of existing shingles
Total Item 2
Solicitation: AG-0489-S-10-0337 REVISED – AMENDMENT 5 PAGE 5 of 77 Fire Lookout Rehabilitation
ITEM NO. DESCRIPTION QUANTITY M OF M UNIT PRICE TOTAL
ITEM 3
Antelope Lookout
Total Item 3
ITEM 4
Snow Mountain Lookout
Total Item 4
ITEM 5
Sugar Loaf Lookout
Total Item 5