AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 5
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
THREE (3) May 3, 2010
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service EROC - Northwest
16400 Champion Way Sandy, OR 97055
USDA Forest Service EROC - Northwest
16400 Champion Way Sandy, OR 97055
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0489-S-10-0337
Fire Lookout Rehabilitation, Malheur NF
9B. DATED (SEE ITEM 11)
03/19/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAI LURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE
SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submit ted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is re ceived prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORIT Y OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return __ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
This solicitation is amended as follows:
1. The time set for receipt of offers on this solicitation is extended to 4:00 PM Pacific Daylight time, on May 24, 2010.
The worksites are currently inaccessible due to snow and this extension is to permit at least a couple of the sites to become accessible.
2. The solicitation is amended as indicated on the attached pages.
Except as provided herein, all terms and conditions of the document ref erenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
ROBERT WILLIAMS, CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Prev ious edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation AG-0489-S-10-0337
Malheur N.F. Fire Lookout Rehabilitation
Amendment 3
1. Add the following clause to Section I:
I.10 52.228-13 Alternative Payment Protections. (NOTE: These bonding requirements apply to contracts under $100,000 only).
(a) The Contractor shall submit one of the following payment protections:
(i) A payment bond.
(ii) An irrevocable letter of credit (ILC).
(iii) A tripartite escrow agreement. The prime contractor establishes an escrow account in a federally insured financial institution and enters into a tripartite escrow agreement with the financial institution, as escrow agent, and all of the suppliers of labor and material. The escrow agreement shall establish the terms of payment under the contract and of resolution of disputes among the parties. The Government makes payments to the contractor’s escrow account, and the escrow agent distributes the payments in accordance with the agreement, or triggers the disputes resolution procedures if required.
(iv) Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the contracting officer, in an acceptable form, executable by the contracting officer.
(v) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 15 days of contract award.
(d) The payment protection shall provide protect ion for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the
Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
2. Replace the Schedule of Items, pages 4 through 6, with the attached pages. These changes correct the work to be performed at each lookout. This also adds clarification about the difference in bonding requirements between contracts over $100,000 and under $100,000.
https://www.acquisition.gov/far/current/html/Subpart%2028_2.html#wp1073428 https://www.acquisition.gov/far/current/html/Subpart%2028_2.html#wp1073432
Solicitation: AG-0489-S-10-0337 REVISED – AMENDMENT 3 PAGE 4 of 77 Fire Lookout Rehabilitation
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
ITEM NO. DESCRIPTION QUANTITY M OF M UNIT PRICE TOTAL
SCHEDULE OF ITEMS
ITEM 1
Lookout Rehabilitation
Indian Rock Lookout
1.1a Mobilize Equipment & materials; clean up site
2.1a Catwalk & Handrails
2.2a Install catwalk decking
3.1a Painting all items
LS
SF
Total Item 1
ITEM 2
Flagtail Lookout
2.1a Catwalk, handrails, access hatch, and welded wire fabric.
2.2a Install catwalk decking and stairs
4.1a Reroof cab
4.2a Remove & dispose of existing shingles
Total Item 2
Solicitation: AG-0489-S-10-0337 REVISED – AMENDMENT 3 PAGE 5 of 77
ITEM NO. DESCRIPTION QUANTITY M OF M UNIT PRICE TOTAL
ITEM 3
Antelope Lookout
Total Item 3
ITEM 4
Snow Mountain Lookout
Total Item 4
ITEM 5
Sugar Loaf Lookout
Total Item 5
Solicitation: AG-0489-S-10-0337 REVISED – AMENDMENT 3 PAGE 6 of 77
B-2 NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under
Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
NOTE: Each item will be evaluated separately for award. Multiple awards may be made.
Offerors may limit their offer to a minimum or maximum number of items (lookouts).
Indicate any limitations below:
My offer is limited to a minimum of ______ items and a maximum of ______ items.
NOTE: Please read the bonding requirements in clauses Section I. Clause FAR 52.228-15, which is incorporated by reference in Section I, requires Performance and Payment bonds for all contracts exceeding $100,000. Additionally, clause I.7, titled Bid Bonds is included.
This clause is applicable to any offer which exceeds $100,000. Alternative requirements for Payment Bonds are required for contracts not exceeding $100,000.