About this file

CONTRACTOR PERFORMANCE DATA SHEET - USE FOR REPSONSE TO SECTION M CRITERIA

View the file

Other files

File Type Posted
AG-0489-S-10-0264 Sheet 2 SITE LOCATIONS.pdf PDF
AG-0489-S-10-0264 Sheet 24 Drift Creek_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 8 Sutton C Loop_PicArea_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 6 Sutton B Loop_Proposed.pdf PDF
AG-0489-S-10-0264 Sheet 25 WATER AND SEWER DETAILS.pdf PDF
AG-0489-S-10-0264 Sheet 16 Rock Creek_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 28 Gunnison Restroom Sidewalk Layout.pdf PDF
AG-0489-S-10-0264 Sheet 9 Sutton D Loop_existing.pdf PDF
AG-0489-S-10-0264 Sheet 30 Tioga Restroom Sidewalk Layout.pdf PDF
AG-0489-S-10-0264 Sheet 11 Horse Creek_existing.pdf PDF
AG-0489-S-10-0264 Sheet 18 River Edge_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 13 Cape P_existing.pdf PDF
AG-0489-S-10-0264 Sheet 31 2000 gallon septic tank detail.pdf PDF
AG-0489-S-10-0264 Sheet 26 Water Hydrant.pdf PDF
AG-0489-S-10-0264 SOW and Specifications.pdf PDF
AG-0489-S-10-0264 Contractor Packet To Return.pdf PDF
AG-0489-S-10-0264 WAGE DETERMINATIONS.pdf PDF
AG-0489-S-10-0264 Solicitation.pdf PDF
AG-0489-S-10-0264 Sheet 15 Rock Creek_existing.pdf PDF
AG-0489-S-10-0264 Sheet 14 Cape P_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 3 Alder_Dune_existing.pdf PDF
AG-0489-S-10-0264 Sheet 27 CORTEZ RESTROOM SIDEWALK LAYOUT.pdf PDF
AG-0489-S-10-0264 Sheet 20 Blackberry_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 21 Eel Creek_existing.pdf PDF
AG-0489-S-10-0264 Sheet 17 River Edge_existing.pdf PDF
AG-0489-S-10-0264 Sheet 10 Sutton D Loop_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 23 Drift Creek_existing.pdf PDF
AG-0489-S-10-0264 Sheet 5 Sutton B Loop_existing.pdf PDF
AG-0489-S-10-0264 Sheet 12 Horse Creek_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 29 Montrose restroom Sidewak Layout.pdf PDF
AG-0489-S-10-0264 Sheet 4 Alder_Dune_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 1 TITLE SHEET.pdf PDF
AG-0489-S-10-0264 Sheet 19 Blackberry_existing.pdf PDF
AG-0489-S-10-0264 Sheet 22 Eel creek_proposed.pdf PDF
AG-0489-S-10-0264 Sheet 7 Sutton C Loop_PicArea_existing.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PERFORMANCE DATA SHEET

(Complete one Form for each Reference)

This RFP/RFQ Number:

Contractor Name:

Address:

Contractor’s POC (Person to verify data):

Telephone:

FAX:

CONTRACT PERFORMANCE INFORMATION

Contract Number:

Date Completed:

Contract Type:
FFP___ Cost Reimbursement ___ Other (Specify) ___________

Brief Item/Service Description (See Quality (1) below to provide additional detail):

Project Location

Project Size/Period of Performance:

Customer Name:

Customer POC (Person who can verify data):

Address:

Telephone:

FAX:

CONTRACTOR MUST COMPLETE THE FOLLOWING TO BE CONSIDERED RESPONSIVE

QUALITY

YES
NO
1
Were supplies/services similar in nature to this solicitation’s work description?
2
Was/is any part of this contract terminated for default and/or in litigation?
3
Was consideration or a monetary withhold for non-conforming supplies/services?
*
4
Was any warranty work completed on delivered items or rework of services?
*
5
Did you receive any quality awards in the past three years?

CUSTOMER SATISFACTION

6
Were the customers completely satisfaction with the completed products & services?

TIMELINESS

7
Were all items (including products, services, reports, etc.) delivered within the original contract schedule?
8
Were liquidated damages or consideration assessed for late delivery
*

BUSINESS RELATIONS

9
Did subcontractor get effectively managed where subcontracts were necessary?
10
Was an environment of reasonableness and cooperation nurtured whereby flexibility existed and solutions were recommended?
11
Was there a good working relationship with the Contracting Officer and COR?

OTHER PERTINENT INFORMATION

12
Describe any corrective action(s) initiated to solve any of the above-described problems/deficiencies on this contract. Discuss the success of the corrective action(s) taken.*

NOTES:

(1) Answers in columns containing an asterisk (*) require an explanatory narrative attached to this form. Other answers may include narrative response at the offerors election.

(2) The information provided may be used to evaluate the offeror’s past performance in meeting cost, price, technical, and performance objectives. The results may be used in the overall comparative evaluation of the offeror(s) in accordance with Evaluation Factors for Award provisions.

File details come from the government source that posted it. Updated .