COOS COUNTY:
General Decision Number: OR080048 01/01/2010 OR48
State: Oregon
Construction Type: Building
County: Coos County in Oregon.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 12/18/2009
1 01/01/2010
BROR0001-018 06/01/2009
Rates Fringes
BRICKLAYER.......................$ 31.07 13.70
TILE FINISHER....................$ 21.11 9.50
TILE SETTER......................$ 27.80 12.90
CARP0001-031 06/01/2007
Carpenters:
Including Cabinet installation and form work..$ 27.56 13.30
MILLWRIGHT.......................$ 28.04 13.30
CARP9001-004 06/20/2007
Rates Fringes
Acoustical Ceiling Installer
& Drywall Hanger.................$ 27.95 13.52
AG-0489-S-10-0264
RECOVERY: Coastal Tourism Infrastructure Restoration - Toilet Replacement
ELEC0932-012 01/01/2009
Rates Fringes
ELECTRICIAN......................$ 31.97 3%+12.40
ELEC0932-013 01/01/2009
Rates Fringes
ELECTRICIAN (Electrical installer alarms, low voltage wiring for alarms, low voltage wiring and telehone installation.)...................$ 23.08 11.40
* ENGI0701-025 01/01/2010
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 37.27 11.50
GROUP 1A....................$ 39.13 11.50
GROUP 1B....................$ 41.00 11.50
GROUP 2.....................$ 35.64 11.50
GROUP 3.....................$ 34.65 11.50
GROUP 4.....................$ 33.71 11.50
GROUP 5.....................$ 32.60 11.50
GROUP 6.....................$ 29.61 11.50
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM
CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90
AG-0489-S-10-0264
tons through 199 tons with luffing or tower attachments
GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM
CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;
GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over
GROUP 2: CRANE: Cableway Operator, 25 tons and over;
HYDRAULIC CRANE: Hydraulic crane operator 90 tons through
199 tons (without luffing or tower attachment);
TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley
Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:
Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade
Operator-Robotic; Bulldozer: Over 120,000 lbs and above;
Bulldozer: D-10, D-11 and similar type; Loader: 120,000 lbs and above
GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);
LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons
(and less than 150 feet boom); Bulldozer: over 70,000 lbs up to and including 120,000; Loader: 60,000 lbs and less than 120,000 lbs
GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;
LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE--ROBOTIC: up to and including
20,0000 lbs. with any or all attachments; BLADE: Blade
AG-0489-S-10-0264
operator; Tractor operator with boom attachment; DRILLING:
Churm Drill and Earth Boring Machine Operator; Directional
Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Asphalt Paver; Mechanic; Bulldozer: over
20,000 lbs and more than 100 horse and up to 70,000 lbs;
Loader: 25,000 lbs and less than 60,000 lbs
GROUP 5: TRACKHOE-HYDRAULIC: up to and including 20,000 lbs.;
DRILLING: Churm Drill and Earth Boring Machine Operator;
Directional Drill Operator less than 20,000 lbs pullback;
Concrete Pumper; Concrete Paver; forlkift over 5 ton;
Bulldozer: 20,000 lbs or less, or 100 horse or less;
Loader: ruber tired type, less than 25,000 lbs
GROUP 6: LOADERS: (less than 1 cu yd.); Oiler; Crane oiler;
forklift; Broom
IRON0029-013 07/01/2009
Rates Fringes
IRONWORKER (Reinforcing and
Structural)......................$ 33.12 17.40
LABO0001-030 06/01/2008
Rates Fringes
Laborers: (Mason
Tender-Cement/Concrete)..........$ 25.75 11.25
LABO0001-031 06/01/2008
Rates Fringes
AG-0489-S-10-0264
Laborers: (Mason Tender-Brick)...$ 25.75 11.25
LABO0003-014 06/01/2008
Rates Fringes
Laborers:
GROUP 1.....................$ 24.66 11.25
GROUP 4.....................$ 26.15 11.25
GROUP 5.....................$ 21.51 11.25
LABORER CLASSIFICATIONS
GROUP 1: Form-Stripping; Demolition
GROUP 4: Grade Checker, Pipelayer
GROUP 5: Flagger
PAIN0055-024 07/01/2009
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 26.31 10.63
PAIN0055-027 07/01/2009
Rates Fringes
Painters:
Brush, Roller and Spray.....$ 16.59 7.24
PAIN0740-002 07/01/2009
Rates Fringes
GLAZIER..........................$ 33.60 12.89
PLAS0082-003 06/01/2008
Rates Fringes
PLASTERER........................$ 28.46 11.61
AG-0489-S-10-0264
PLAS0555-006 06/01/2009
CEMENT MASON/CONCRETE FINISHER...$ 28.87 15.59
PLUM0290-012 04/01/2009
Rates Fringes
PIPEFITTER.......................$ 35.69 18.59
SUOR2009-032 11/09/2009
Rates Fringes
ABATEMENT WORKER:
ASBESTOS(Removal from Floors, Ceilings, Walls).................$ 18.57 0.00
ELECTRICAL INSTALLER
(Electrical Door)................$ 14.00 0.00
LABORER: Common or General......$ 14.92 0.00
OPERATOR: Backhoe...............$ 21.68 7.67
OPERATOR: Excavator.............$ 21.68 5.46
OPERATOR: Roller................$ 17.14 0.00
OPERATOR: Screed................$ 16.00 0.00
PLUMBER..........................$ 27.32 9.86
SHEETMETAL WORKER (Excluding
Metal Roofing)...................$ 29.23 4.16
SHEETMETAL WORKER (Metal Roof
Installation Only)...............$ 23.65 6.33
TRUCK DRIVER: Dump Truck........$ 16.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
AG-0489-S-10-0264
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of
Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
AG-0489-S-10-0264
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
(formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
AG-0489-S-10-0264
LANE COUNTY:
General Decision Number: OR080041 01/08/2010 OR41
State: Oregon
Construction Type: Building
County: Lane County in Oregon.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 12/18/2009
1 01/01/2010
2 01/08/2010
BROR0001-018 06/01/2009
BRICKLAYER.......................$ 31.07 13.70
TILE FINISHER....................$ 21.11 9.50
TILE SETTER......................$ 27.80 12.90
CARP0001-024 06/01/2007
Rates Fringes
Carpenters:
Excluding Form Work.........$ 27.56 13.30
* ELEC0280-013 01/01/2010
LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST
CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY)
Rates Fringes
ELECTRICIAN (Electrical Low
Voltage Wiring Installer and
HVAC Temperature Control
AG-0489-S-10-0264
Installation only.)..............$ 26.04 3%+$10.65
* ELEC0280-014 01/01/2010
LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST
CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY)
Rates Fringes
ELECTRICIAN......................$ 34.05 3%+14.43
ELEC0932-010 01/01/2009
LANE COUNTY (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE
N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)
Rates Fringes
ELECTRICIAN......................$ 31.97 3%+12.40
ELEC0932-011 01/01/2009
LANE COUNTY (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE
N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)
Rates Fringes
ELECTRICIAN (ELECTRICAL LOW
VOLTAGE WIRING INSTALLER AND
HVAC CONTROL INSTALLATION
ONLY)............................$ 23.08 11.40
ENGI0701-020 01/01/2010
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 37.27 11.50
GROUP 1A....................$ 39.13 11.50
GROUP 1B....................$ 41.00 11.50
GROUP 2.....................$ 35.64 11.50
AG-0489-S-10-0264
GROUP 3.....................$ 34.65 11.50
GROUP 4.....................$ 33.71 11.50
GROUP 5.....................$ 32.60 11.50
GROUP 6.....................$ 29.61 11.50
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM
CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments
GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM
CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;
GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over
GROUP 2: CRANE: Cableway Operator, 25 tons and over;
HYDRAULIC CRANE: Hydraulic crane operator 90 tons through
199 tons (without luffing or tower attachment);
TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley
Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:
Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade
Operator-Robotic; Rubber tired scraper with tandom scrapers, multi-engineTrenching Machine-Wheel Operator
GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);
LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons
AG-0489-S-10-0264
(and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units.
GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;
LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE-ROBOTIC: up to and including
20,0000 lbs. with any or all attachments; BLADE: Blade operator; Tractor operator with boom attachment; DRILLING:
Churm Drill and Earth Boring Machine Operator; Directional
Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; HYDRAULIC HOES: Robotic Hydraulic backhoe operator, track and wheel type up to and including
20,0000 lbs. with any or all attachments; Asphalt Paver;
Screed Operator; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled; Trenching
Machine, digging capacity over 3 ft Depth.
GROUP 5: TRACKHOE-HYDRAULIC: up to and including 20,000 lbs.;
Boom truck operator; DRILLING: Churm Drill and Earth Boring
Machine Operator; Directional Drill Operator less than
20,000 lbs pullback; HYDRAULIC HOES: Hydraulic Backhoe
Operator, wheel type (Ford, John Deere, Case type);
Hydraulic Backhoe Operator track type up to and including
20,000 lbs.; Concrete Pumper; Concrete Paver: Compactor
GROUP 6: LOADERS: (less than 1 cu yd.); Roller
(Non-Asphalt); Oiler; Bobcat/Skid Loader; Grade Checker;
Crane oiler; Drill Assistant
IRON0029-011 07/01/2009
AG-0489-S-10-0264
IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 33.12 17.40
LABO0001-030 06/01/2008
Rates Fringes
Laborers: (Mason
Tender-Cement/Concrete)..........$ 25.75 11.25
LABO0001-031 06/01/2008
Rates Fringes
Laborers: (Mason Tender-Brick)...$ 25.75 11.25
LABO0001-032 06/01/2008
Rates Fringes
Laborers: (Mason Tender-Stone)...$ 25.75 11.25
LABO0003-008 06/01/2008
Rates Fringes
Laborers:
GROUP 1.....................$ 24.66 11.25
GROUP 2.....................$ 25.29 11.25
GROUP 3.....................$ 25.75 11.25
GROUP 4.....................$ 26.15 11.25
LABORER CLASSIFICATIONS
GROUP 1: Form-Stripping
GROUP 2: Power Tool Operator
GROUP 3: Vibrating Plate
GROUP 4: Grade Checker, Pipelayer
AG-0489-S-10-0264
PAIN0055-023 07/01/2009
Painters:
Brush, Roller and Spray.....$ 18.59 7.24
PAIN0055-024 07/01/2009
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 26.31 10.63
PAIN0740-002 07/01/2009
Rates Fringes
GLAZIER..........................$ 33.60 12.89
PLAS0082-003 06/01/2008
Rates Fringes
PLASTERER........................$ 28.46 11.61
PLAS0555-006 06/01/2009
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.87 15.59
PLUM0290-008 04/01/2009
Rates Fringes
Plumbers and Pipefitters.........$ 35.69 18.59
ROOF0156-003 06/01/2009
Rates Fringes
Roofers:
Excluding Metal Roof........$ 21.29 9.90
AG-0489-S-10-0264
SUOR2009-025 11/09/2009
CARPENTER (Form Work Only).......$ 21.07 7.43
LABORER: Common or General......$ 19.03 6.96
LABORER: Landscape..............$ 14.02 2.63
OPERATOR: Excavator.............$ 22.61 6.32
OPERATOR: Forklift..............$ 20.28 8.18
SHEETMETAL WORKER................$ 33.23 2.73
SPRINKLER FITTER (Fire
Sprinklers)......................$ 29.38 5.49
TRUCK DRIVER: Dump Truck........$ 15.50 9.05
TRUCK DRIVER: Water Truck.......$ 18.40 5.33
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage
AG-0489-S-10-0264
determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
2.) If the answer to the question in 1.) is yes, then an interested party
(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data,project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board(formerly the Wage Appeals Board). Write to:
Administrative Review Board, U.S. Department of Labor
200 Constitution Avenue, N.W., Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
AG-0489-S-10-0264
LINCOLN COUNTY:
General Decision Number: OR080055 01/01/2010 OR55
State: Oregon
Construction Type: Building
County: Lincoln County in Oregon.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 12/18/2009
1 01/01/2010
BROR0001-020 06/01/2009
Lincoln (North) County
Rates Fringes
BRICKLAYER.......................$ 32.29 14.05
TILE FINISHER....................$ 21.11 9.50
TILE SETTER......................$ 27.80 12.90
BROR0001-021 06/01/2009
Lincoln (South) County
Rates Fringes
BRICKLAYER.......................$ 31.07 13.70
TILE FINISHER....................$ 21.11 9.50
TILE SETTER......................$ 27.80 12.90
CARP0001-033 06/01/2007
Rates Fringes
Carpenters:
Cabinet installation and form work only..............$ 27.56 13.30
AG-0489-S-10-0264
CARP9001-004 06/20/2007
Acoustical Ceiling Installer
& Drywall Hanger.................$ 27.95 13.52
ELEC0932-012 01/01/2009
Rates Fringes
ELECTRICIAN......................$ 31.97 3%+12.40
ELEC0932-016 01/01/2009
Rates Fringes
ELECTRICIAN (Electrical installer alarms, low voltage wiring for alarms, low voltage wiring and telehone installation.)...................$ 23.08 11.40
* ENGI0701-025 01/01/2010
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 37.27 11.50
GROUP 1A....................$ 39.13 11.50
GROUP 1B....................$ 41.00 11.50
GROUP 2.....................$ 35.64 11.50
GROUP 3.....................$ 34.65 11.50
GROUP 4.....................$ 33.71 11.50
GROUP 5.....................$ 32.60 11.50
GROUP 6.....................$ 29.61 11.50
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM
CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments
GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM
CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;
GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over
GROUP 2: CRANE: Cableway Operator, 25 tons and over;
HYDRAULIC CRANE: Hydraulic crane operator 90 tons through
199 tons (without luffing or tower attachment);
TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley
Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:
Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade
Operator-Robotic; Bulldozer: Over 120,000 lbs and above;
Bulldozer: D-10, D-11 and similar type; Loader: 120,000 lbs and above
GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);
LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons
(and less than 150 feet boom); Bulldozer: over 70,000 lbs up to and including 120,000; Loader: 60,000 lbs and less than 120,000 lbs
GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;
LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, AG-0489-S-10-0264 under 50 tons; TRACKHOE--ROBOTIC: up to and including
20,0000 lbs. with any or all attachments; BLADE: Blade operator; Tractor operator with boom attachment; DRILLING:
Churm Drill and Earth Boring Machine Operator; Directional
Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Asphalt Paver; Mechanic; Bulldozer: over
20,000 lbs and more than 100 horse and up to 70,000 lbs;
Loader: 25,000 lbs and less than 60,000 lbs
GROUP 5: TRACKHOE-HYDRAULIC: up to and including 20,000 lbs.;
DRILLING: Churm Drill and Earth Boring Machine Operator;
Directional Drill Operator less than 20,000 lbs pullback;
Concrete Pumper; Concrete Paver; forlkift over 5 ton;
Bulldozer: 20,000 lbs or less, or 100 horse or less;
Loader: ruber tired type, less than 25,000 lbs
GROUP 6: LOADERS: (less than 1 cu yd.); Oiler; Crane oiler;
forklift; Broom
IRON0029-013 07/01/2009
Rates Fringes
IRONWORKER (Reinforcing and
Structural)......................$ 33.12 17.40
LABO0001-030 06/01/2008
Rates Fringes
Laborers: (Mason
Tender-Cement/Concrete)..........$ 25.75 11.25
LABO0001-031 06/01/2008
Rates Fringes
AG-0489-S-10-0264
Laborers: (Mason Tender-Brick)...$ 25.75 11.25
LABO0003-014 06/01/2008
Rates Fringes
Laborers:
GROUP 1.....................$ 24.66 11.25
GROUP 4.....................$ 26.15 11.25
GROUP 5.....................$ 21.51 11.25
LABORER CLASSIFICATIONS
GROUP 1: Form-Stripping; Demolition
GROUP 4: Grade Checker, Pipelayer
GROUP 5: Flagger
PAIN0055-023 07/01/2009
Rates Fringes
Painters:
Brush, Roller and Spray.....$ 18.59 7.24
PAIN0055-026 07/01/2009
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 31.76 11.38
PAIN0740-002 07/01/2009
Rates Fringes
GLAZIER..........................$ 33.60 12.89
PLAS0082-003 06/01/2008
Rates Fringes
PLASTERER........................$ 28.46 11.61
AG-0489-S-10-0264
PLUM0290-012 04/01/2009
PIPEFITTER.......................$ 35.69 18.59
SUOR2009-039 11/09/2009
Rates Fringes
ABATEMENT WORKER:
ASBESTOS(Removal from Floors, Ceilings, Walls).................$ 18.57 0.00
CARPENTER, Excluding
Acoustical Ceiling
Installation, Drywall Hanging and Form Work....................$ 22.44 8.80
ELECTRICAL INSTALLER
(Electrical Door)................$ 14.00 0.00
LABORER: Common or General......$ 18.49 6.83
OPERATOR: Backhoe...............$ 21.68 7.67
OPERATOR: Excavator.............$ 21.68 5.46
OPERATOR: Roller................$ 17.14 0.00
OPERATOR: Screed................$ 16.00 0.00
PLUMBER..........................$ 27.32 9.86
SHEETMETAL WORKER (Metal Roof
Installation Only)...............$ 23.65 6.33
SHEETMETAL WORKER, excluding
Metal Roof.......................$ 29.23 4.16
TRUCK DRIVER: Dump Truck........$ 16.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the
AG-0489-S-10-0264
classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and
3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party
(those affected by the action) can request review and reconsideration from
AG-0489-S-10-0264
the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the
Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION