1.1
2.1
Project: Timberline Rest Rooms ADA Remodel
Site Map – Timberline Ski Resort
Vicinity Map – Timberline Ski Resort
PROJECT LOCATION
PROJECT LOCATION
TIMBERLINE LODGE 09137 October, 2009 Head House Ground Floor Public Toilet Renovations
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
Section 01010 – Summary of Work Section 01035 – Modification Procedures Section 01040 – Project Coordination Section 01045 – Cutting and Patching Section 01095 – Reference Standards and Definitions Section 01200 – Project Meetings Section 01300 – Submittals Section 01400 – Quality Control Section 01500 – Temporary Facilities Section 01600 – Materials - Delivery, Storage and Handling Section 01631 – Product Substitutions Section 01700 – Project Closeout Section 01740 – Warranties
DIVISION 2 - SITEWORK
Section 02070 - Selective Demolition
DIVISION 3 – CONCRETE
Section 03542 – Cement – Based Underlayment
DIVISION 4 - MASONRY
DIVISION 5 - METALS
Section 05100 - Miscellaneous Metals
DIVISION 6 - WOOD AND PLASTICS
Section 06100 - Rough Carpentry Section 06200 - Finish Carpentry Section 06350 - Wood Restoration and Reconstruction
Section 06420 - Wood Paneling
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
Section 07270 – Firestopping Section 07900 - Joint Sealers
DIVISION 8 - DOORS AND WINDOWS
TIMBERLINE LODGE 09137 October, 2009
Section 08310 – Access Doors and Panels
DIVISION 9 - FINISHES
Section 09250 – Gypsum Drywall Section 09300 – Tile Section 09511 – Suspended Ceiling System Section 09900 – Painting
DIVISION 10 - SPECIALTIES
Section 10155 – Toilet Partitions Section 10800 – Toilet Accessories Section 10810 – Mirror Units Section 10811 – Electric Hand Dryers
DIVISION 11 – EQUIPMENT
Not Used
DIVISION 12 – FURNISHINGS
Not Used
DIVISION 13 - SPECIAL CONSTRUCTION
Not Used
DIVISION 14 - CONVEYING SYSTEMS
Not Used
DIVISION 15 - MECHANICAL
Section 15050 - Basic Mechanical Requirements
DIVISION 16 - ELECTRICAL
Section 16010 – General Technical Provisions Section 16050 – Basic Material and Methods Section 16500 – Lighting
TIMBERLINE LODGE 09137 October, 2009
SUMMARY OF WORK 01010 - 1
SECTION 01010 - SUMMARY OF WORK 1
Part 1 – GENERAL 3
RELATED DOCUMENTS 5
Drawings and general provisions of Contract, including General and Supplementary Conditions and 7 other Division 1 Specification Sections, apply to this Section. 8
PROJECT DESCRIPTION 11
The Project consists of renovation and upgrades of the Men’s and Women’s public restrooms 13 adjacent to the ground floor Head House within the guidelines of the Secretary of the Interior’s 14 Standards for Treatment of Historic Properties and The Timberline Lodge Historic Building 15 Preservation Plan. 16 Work includes (not all inclusive) selective demolition, renovation, restoration and mechanical and 18 electrical upgrades with miscellaneous patch and repairs. 19
CONTRACTOR USE OF PREMISES 22
General: During the construction period, the Contractor shall coordinate work sequence and required 24 access for materials and construction with Lodge operator through the CO. See project limits on floor 25 plan. 26
Confine operations to areas within project area limits. 28
Keep driveways and entrances serving the premises clear and available to use at all times. 30 Storage and project office areas will be designated by the CO after the Notice to Proceed has 31 been issued. These areas will be either in the building or within walking distance of it 32
PROTECTION OF EXISTING 35
Protect all in-place construction in connection with the work, unless specifically indicated otherwise. 37 Restoration of Existing Improvements: The Contractor shall repair or replace curbs, sidewalks, 39 driveway, utilities, street surfaces, interior and exterior finishes and any and all structures and 40 substructures damaged by his operations. These repairs and replacements shall be similar and 41 equal in every respect to those now in place and acceptable to the CO and shall match the existing 42 adjacent construction in dimension and finish. 43
MISCELLANEOUS PROVISIONS 46
TIMBERLINE LODGE 09137 September, 2009
SUMMARY OF WORK 01010 - 2
All work performed shall be under a single contract. Divisions in these specifications conform 48 generally to customary trade practice; they are intended for convenience only. 49 Comply with applicable requirements of regulatory agencies and inspection by public officials. The 51 Contractor shall call for all inspections required by government agencies having jurisdiction on the 52 area. Final payment will not be made until the appropriate officials have made a final inspection and 53 all deficient items have been corrected. 54 Before ordering any material or doing any work, the Contractor shall verify all measurements at job. 56 Any difference found between dimensions on Drawings and actual measurements shall be brought to 57 C.O.’s attention before proceeding with the work. 58 Carry on the work so as to minimize interference with the Lodge operator’s operation of the existing 60 facilities. 61 Provide necessary supervision, coordination and verification of the work of the various trades. 63 Transmit contract requirements to subcontractors. Transmit subcontract questions to C.O. 64 Perform work during weather conditions conducive to best results for a sound and durable 66 installation. 67
PERMITS AND FEES 70
Contractor to secure and pay for all permits and fees required under this contract. 72
END OF SECTION 76
TIMBERLINE LODGE 09137 October, 2009
MODIFICATION PROCEDURES 01035 - 1
SECTION 01035 - MODIFICATION PROCEDURES 1
PART 1 - GENERAL 4
RELATED DOCUMENTS 7
Drawings and general provisions of Contract, including General and Supplementary Conditions and 9 other Division 1 Specification sections, apply to this section. 10
SUMMARY 13
This section specifies requirements for handling and processing Contract modifications. 15 Related Sections: The following sections contain requirements that relate to this section: 17 Specifications and drawings 19 Contract Clauses 21
Division 1 Section "Submittals". 23
Division 1 Section "Application for Payment". 25
Division 1 Section "Product Substitutions" for administrative procedures for handling requests 27 for substitutions made after award of the Contract. 28
MINOR CHANGES IN THE WORK 31
Change requests in the work will be submitted to the C.O. in writing for approval. Once the C.O. 33 approves, the contractor can implement. 34
PROPOSAL REQUESTS 37
Government -Initiated Proposal Requests: Proposed changes in the Work that will require 39 adjustment to the Contract Sum or Contract Time will be issued by the C.O. with a detailed 40 description of the proposed change and supplemental or revised Drawings and Specifications, as 41 needed. 42
Proposal Requests issued by the C.O. are for information only. Do not consider them as 44 instruction either to stop work in progress, or to execute the proposed change. 45
Unless otherwise indicated in the Proposal Request, within five (5) working days of receipt of 47 the Proposal Request, submit to the Architect for the lodge representative review an estimate 48 of cost necessary to execute the proposed change. 49
TIMBERLINE LODGE 09137 September, 2009
MODIFICATION PROCEDURES 01035 - 2
Include a list of quantities of products to be purchased and unit costs, along with the 51 total amount of purchases to be made. 52 Include a breakdown of labor required for the change. 53
Include credits that may result for labor and/or materials included in the contract that 55 are no longer required. 56
Indicate applicable taxes, delivery charges, equipment rental and amounts of trade 58 discounts. 59
Include a statement indicating the effect the proposed change in the Work will have 61 on the Contract Time. 62
Contractor-Initiated Proposal Requests: When unforeseen conditions require modifications to the 64 Contract, the Contractor may propose changes by submitting a Proposal Request for a change to the 65 Architect. 66
Include a statement outlining the reasons for the change and the effect of the change on the 68 Work. Provide a complete description of the proposed change. Indicate the effect of the 69 proposed change on the Contract Sum and Contract Time. 70
Include the breakdowns of cost as described above for Architect-Initiated Proposal 72 Requests. 73
Comply with requirements in Section "Product Substitutions", if the proposed change 75 in the Work requires the substitution of one product or system for a product or system 76 specified. 77
Proposal Request forms will not be processed by C.O. until all information indicated 79 under Proposal Requests above has been provided. 80
Proposal Request Form: Use forms provided. Sample copy included in Contract Forms Section. 82
CHANGE ORDER PROCEDURES 86
Subsequent to the C.O.'s approval of a Proposal Request, the Contractor may proceed with the work 88 contained in that request. The C.O. will issue a Contract Modification for signatures of the Contractor, 89 as provided in the Conditions of the Contract. 90 PART 2 - PRODUCTS (Not Applicable) 94 PART 3 - EXECUTION (Not Applicable) 97
TIMBERLINE LODGE 09137 October, 2009
MODIFICATION PROCEDURES 01035 - 3
END OF SECTION 103
TIMBERLINE LODGE 09137 October, 2009
PROJECT COORDINATION 01040 - 1
SECTION 01040 - PROJECT COORDINATION 1
PART 1 - GENERAL 4
RELATED DOCUMENTS 7
Drawings and general provisions of Contract, including General and Supplementary Conditions and 9 other Division 1 Specification Sections, apply to this Section. 10
SUMMARY 13
This Section specifies requirements necessary for Project coordination including, but not limited to: 15
Coordination. 17 General installation provisions. 18 Cleaning and protection. 19
COORDINATION 22
Coordination: Coordinate and schedule construction activities included in Sections of Specifications 24 to assure efficient and orderly installation of the Work. Coordinate construction included under 25 Sections of the Specifications that are dependent upon each other for proper installation, connection 26 and operation. 27 Coordinate construction work hours with C.O. 29 PART 2 - PRODUCTS (Not Applicable) 32
PART 3 - EXECUTION 35
GENERAL INSTALLATION PROVISIONS 38
Inspection of Conditions: Require the Installer of each major component to inspect the substrate and 40 conditions under which Work is to be performed. Do not proceed until unsatisfactory conditions have 41 been corrected in an acceptable manner. 42 Manufacturer's Instructions: Comply with manufacturer's installation instructions and 44 recommendations, unless more stringent requirements are specified. 45 Inspect materials or equipment upon delivery and prior to installation. Reject damaged and defective 47 items. 48
TIMBERLINE LODGE 09137 September, 2009
PROJECT COORDINATION 01040 - 2
Provide attachment and connection devices and methods necessary for securing Work. Secure Work 50 true to line and level. Allow for expansion and building movement. 51 Visual Effects: Provide uniform joint widths in exposed Work. Arrange joints in exposed Work to 53 obtain the best visual effect. Refer questionable choices to the C.O. for final decision. 54 Recheck measurements and dimensions, before starting each installation. 56
CLEANING AND PROTECTION 59
During handling and installation, clean and protect construction in progress and adjoining materials in 61 place. Apply protective covering where required to ensure protection from damage or deterioration. 62 Clean and maintain completed construction and construction area through the construction period. 64
END OF SECTION 70
TIMBERLINE LODGE 09137 October, 2009
CUTTING AND PATCHING 01045 - 1
SECTION 01045 - CUTTING AND PATCHING 1
PART 1 - GENERAL 4
RELATED DOCUMENTS 7
Drawings and general provisions of the Contract, including General and Supplementary Conditions 9 and other Division 1 Specification Sections, apply to this Section. 10
SUMMARY 13
This Section includes administrative and procedural requirements for cutting and patching. 15 Related Sections: The following Sections contain requirements that relate to this Section: 17
Division 1 Section "Coordination" for procedures for coordinating cutting and patching with 19 other construction activities. 20
Division 2 Section "Selective Demolition" for demolition of selected portions of the building for 22 alterations. 23
Refer to other Sections for specific requirements and limitations applicable to cutting and 25 patching individual parts of the Work. 26
Requirements of this Section apply to mechanical and electrical installations. Refer 28 to Division 15 Sections for other requirements and limitations applicable to cutting 29 and patching mechanical and electrical installations. 30
SUBMITTALS 33
Cutting and Patching Proposal: Submit proposed procedures at least 10 days in advance of the 35 anticipated start of work. Do not proceed until approval has been given by C.O. 36
Describe the extent of cutting and patching required. Show how it will be performed and 38 indicate why it cannot be avoided. 39
Describe anticipated results in terms of changes to existing construction. Include changes to 41 structural elements and operating components as well as changes in the building's 42 appearance and other significant visual elements. 43
List products to be used and firms or entities that will perform Work. 45 Indicate dates when cutting and patching will be performed. 46 Utilities: List utilities that cutting and patching procedures will disturb or affect. List utilities 47 that will be relocated and those that will be temporarily out-of-service. Indicate how long 48 service will be disrupted. 49
TIMBERLINE LODGE 09137 September, 2009
CUTTING AND PATCHING 01045 - 2
Where cutting and patching involves adding reinforcement to structural elements, submit 51 details and engineering calculations showing integration of reinforcement with the original 52 structure. 53
Approval by the C.O. to proceed with cutting and patching does not waive the C.O.’s right to 55 later require complete removal and replacement of unsatisfactory work. 56
QUALITY ASSURANCE 59
Requirements for Structural Work: Do not cut and patch structural elements in a manner that would 61 change their load-carrying capacity or load-deflection ratio. 62
Obtain approval of the cutting and patching proposal before cutting and patching the following 64 structural elements: 65
Foundation construction. 67 Bearing and retaining walls. 68 Structural concrete. 69 Structural steel. 70 Lintels. 71 Primary wood framing. 72 Structural decking. 73 Miscellaneous structural metals. 74 Equipment supports. 75 Piping, ductwork, vessels, and equipment. 76
Operational Limitations: Do not cut and patch operating elements or related components in a manner 78 that would result in reducing their capacity to perform as intended. Do not cut and patch operating 79 elements or related components in a manner that would result in increased maintenance or 80 decreased operational life or safety. 81
Obtain approval of the cutting and patching proposal before cutting and patching the following 83 operating elements or safety related systems: 84
Primary operational systems and equipment. 86 Air or smoke barriers. 87 Water, moisture, or vapor barriers. 88 Membranes and flashings. 89 Fire protection systems. 90 Noise and vibration control elements and systems. 91 Control systems. 92 Communication systems. 93 Conveying systems. 94 Electrical wiring systems. 95 Operating systems of special construction in Division 13 Sections. 96
TIMBERLINE LODGE 09137 October, 2009
CUTTING AND PATCHING 01045 - 3
Visual Requirements: Do not cut and patch construction exposed on the exterior or in occupied 98 spaces in a manner that would, in the C.O.’s opinion, reduce the building's aesthetic qualities. Do 99 not cut and patch construction in a manner that would result in visual evidence of cutting and 100 patching. Remove and replace construction cut and patched in a visually unsatisfactory manner. 101
If possible retain the original Installer or fabricator to cut and patch the exposed Work listed 103 below. If it is impossible to engage the original Installer or fabricator, engage another 104 recognized experienced and specialized firm. 105
Processed concrete finishes. 107 Stonework and stone masonry. 108 Ornamental metal. 109 Matched-veneer woodwork. 110 Preformed metal panels. 111 Firestopping. 112 Window wall system. 113 Stucco and ornamental plaster. 114 Acoustical ceilings. 115 Fluid-applied flooring. 116 Carpeting. 117 Wall covering. 118 HVAC enclosures, cabinets, or covers. 119
WARRANTY 122
Existing Warranties: Replace, patch, and repair material and surfaces cut or damaged by methods 124 and with materials in such a manner as not to void any warranties required or existing. 125
PART 2 - PRODUCTS 128
MATERIALS, GENERAL 131
Use materials identical to existing materials. For exposed surfaces, use materials that visually match 133 existing adjacent surfaces to the fullest extent possible if identical materials are unavailable or cannot 134 be used. Use materials whose installed performance will equal or surpass that of existing materials. 135 Plaster: Comply with ASTM C 842. 137
Base Coat: Ready-mixed, sand aggregate gypsum plaster base. 139 Finish Coat: Ready-mixed gypsum finish plaster. 140
PART 3 - EXECUTION 143
INSPECTION 146
TIMBERLINE LODGE 09137 September, 2009
CUTTING AND PATCHING 01045 - 4
Examine surfaces to be cut and patched and conditions under which cutting and patching is to be 148 performed before cutting. If unsafe or unsatisfactory conditions are encountered, take corrective 149 action before proceeding. 150
PREPARATION 153
Temporary Support: Provide temporary support of work to be cut. 155 Protection: Protect existing construction during cutting and patching to prevent damage. Provide 157 protection from adverse weather conditions for portions of the Project that might be exposed during 158 cutting and patching operations. 159 Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas. 161 Avoid cutting existing pipe, conduit, or ductwork serving the building but scheduled to be removed or 163 relocated until provisions have been made to bypass them. 164
PERFORMANCE 167
General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and 169 patching at the earliest feasible time and complete without delay. 170
Cut existing construction to provide for installation of other components or performance of 172 other construction activities and the subsequent fitting and patching required to restore 173 surfaces to their original condition. 174
Cutting: Cut existing construction using methods least likely to damage elements retained or 176 adjoining construction. Where possible, review proposed procedures with the original Installer; 177 comply with the original Installer's recommendations. 178
In general, where cutting, use hand or small power tools designed for sawing or grinding, not 180 hammering and chopping. Cut holes and slots as small as possible, neatly to size required, 181 and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in 182 use. 183 To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into 184 concealed surfaces. 185
Cut through concrete and masonry using a cutting machine, such as a Carborundum saw or 187 a diamond-core drill. 188
Comply with requirements of applicable Division 2 Sections where cutting and patching 190 requires excavating and backfilling. 191
Where services are required to be removed, relocated, or abandoned, by-pass utility 193 services, such as pipe or conduit, before cutting. Cut-off pipe or conduit in walls or partitions 194
TIMBERLINE LODGE 09137 October, 2009
CUTTING AND PATCHING 01045 - 5
to be removed. Cap, valve, or plug and seal the remaining portion of pipe or conduit to 195 prevent entrance of moisture or other foreign matter after by-passing and cutting. 196
Patching: Patch with durable seams that are as invisible as possible. Comply with specified 198 tolerances. 199
Where feasible, inspect and test patched areas to demonstrate integrity of the installation. 201
Restore exposed finishes of patched areas and extend finish restoration into retained 203 adjoining construction in a manner that will eliminate evidence of patching and refinishing. 204
Where removing walls or partitions extends one finished area into another, patch and repair 206 floor and wall surfaces in the new space. Provide an even surface of uniform color and 207 appearance. Remove existing floor and wall coverings and replace with new materials, if 208 necessary, to achieve uniform color and appearance. 209
Where patching occurs in a smooth painted surface, extend final paint coat over 211 entire unbroken surface containing the patch after the area has received primer and 212 second coat. 213
Patch, repair, or reinstall existing ceilings as necessary to provide an even-plane surface of 215 uniform appearance. 216
Plaster Installation: Comply with manufacturer's instructions and install thickness and coats as 218 indicated. 219
Unless otherwise indicated, provide 3-coat work. 221
Finish gypsum plaster to match existing adjacent surfaces. Sand lightly to remove trowel 223 marks and arises. 224
Cut, patch, point-up, and repair plaster to accommodate other construction. 226
CLEANING 229
Clean areas and spaces where cutting and patching are performed. Completely remove paint, 231 mortar, oils, putty, and similar items. Thoroughly clean piping, conduit, and similar features before 232 applying paint or other finishing materials. Restore damaged pipe covering to its original condition. 233
END OF SECTION 235
TIMBERLINE LODGE 09137 October, 2009
REFERENCE STANDARDS AND DEFINITIONS 01095 - 1
SECTION 01095 - REFERENCE STANDARDS AND DEFINITIONS 1
PART 1 - GENERAL 4
RELATED DOCUMENTS 7
Drawings and general provisions of Contract, including General and Supplementary Conditions and 9 other Division 1 Specification Sections, apply to this Section. 10
DEFINITIONS 12
General: Basic Contract definitions are included in the Conditions of the Contract. 14 Back Prime: See “Prime”. 17 Furnish: The term "furnish" is used to mean "supply and deliver to the Project site, ready for 20 unloading, unpacking, assembly, installation, and similar operations". 21 Install: The term "install" is used to describe operations at project site including the actual "unloading, 24 unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, 25 protecting, cleaning and similar operations". 26 Regulation: The term "Regulations" includes laws, ordinances, statutes and lawful orders issued by 28 authorities having jurisdiction, as well as rules, conventions and agreements within the construction 29 industry that control performance of the Work. 30 Prime: The term "prime" means the first layer of finishing and means all edges, ends and surfaces, 32 unless otherwise indicated. 33 Project Site is the space available to the Contractor for performance of construction activities, as part 35 of the Project. The extent of the Project Site is shown on the Drawings. 36 Provide: The term "provide" means "to furnish and install, complete and ready for the intended use". 38 C.O.(or CO) The term C.O. means Contracting Officer. 40
INDUSTRY STANDARDS
Applicability of Standards: Except where the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.
Publication Dates: Comply with the standard in effect as of the date of the Solicitation.
TIMBERLINE LODGE 09137 September, 2009
REFERENCE STANDARDS AND DEFINITIONS 01095 - 2
Copies of Standards: Copies of applicable standards are not bound with the Contract Documents.
Where copies of standards are needed for performance of a required construction activity, the Contractor shall obtain copies directly from the publication source.
Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. Where such acronyms or abbreviations are used in the Specifications or other Contract Documents, they mean the recognized name of the trade association, standards generating organization, authority having jurisdiction, or other entity applicable to the context of the text provision.
Refer to the "Encyclopedia of Associations", published by Gale Research Co., available in most libraries.
SUBMITTALS
Permits, Licenses and Certificates: For the Government's records, submit copies of permits, licenses, certifications, inspection reports, releases and similar documents and records as required to established in conjunction with compliance with standards and regulations bearing upon performance of the Work.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION
TIMBERLINE LODGE 09137 September, 2009
SUBMITTALS 01300 - 1
SECTION 01300 - SUBMITTALS 1
PART 1 - GENERAL 4
RELATED DOCUMENTS 6
Drawings and general provisions of Contract, including General and Supplementary Conditions and other 8 Division 1 Specification Sections, apply to this Section. 9
SUMMARY 11
This Section specifies requirements for submittals required for performance of the Work, including: 13
Contractor's Construction Schedule. 15 Submittal Schedule. 16 Shop Drawings. 17 Product Data. 18 Samples. 19
SUBMITTAL PROCEDURES 22
Coordination: Transmit each submittal sufficiently in advance of performance of related construction 24 activities to avoid delay. 25
Contracting Officer reserves the right to withhold action on a submittal requiring coordination with 27 other submittals until related submittals are received. 28
Processing: Allow sufficient review time so installation will not be delayed. Seven (7) days for initial 30 review. 31 Submittal Preparation: Place a permanent label or title block on each submittal for identification. Indicate 33 the name of the entity that prepared each submittal on the label or title block. 34
Provide a space approximately 4" x 5" on the label or beside the title block to record the 36 Contractor's review and approval markings and the action taken. 37
Include the following information on the label for processing and recording action taken: 39
Project name. 41 Date. 42 Name of C.O. 43 Name, address and telephone number of entity involved. 44 Number and title of appropriate Specification Section. 45 Drawing number and detail references, as appropriate. 46
Submittal Transmittal: Transmit each submittal from Contractor to Contracting Officer using a transmittal 47 form. Submittals received from sources other than the Contractor will be returned without action. 48
TIMBERLINE LODGE 09137 September, 2009
SUBMITTALS 01300 - 2
Record deviations from Contract Document requirements, including minor variations and 50 limitations. 51
CONTRACTOR'S CONSTRUCTION SCHEDULE 53
Distribution: Following response to the initial submittal, print and distribute copies to the C.O., 55 subcontractors and other parties required to comply with the scheduled dates. Post copies in the 56 temporary field office. 57
When revisions are made, distribute to the same parties and post in the same locations. Delete 59 parties from distribution when they have completed their assigned portion of the Work and are no 60 longer involved in construction activities. 61
SUBMITTAL SCHEDULE 64
After development and acceptance of the Contractor's Construction Schedule, prepare a complete 66 schedule of submittals. Submit the schedule within ten (10) days of the date required for establishment of 67 the Contractor's Construction Schedule. 68
SHOP DRAWINGS 71
Submit newly prepared information, drawn to accurate scale. Highlight, encircle or otherwise indicate 73 deviations from the Contract Documents. Do not reproduce Contract Documents or copy standard 74 information as the basis of Shop Drawings. 75 Shop Drawings include fabrication and installation drawings, setting diagrams, schedules, patterns, 77 templates and similar drawings. Include the following information: 78
Dimensions. 80 Identification of products and materials included. 81 Compliance with specified standards. 82 Notation of coordination requirements. 83 Notation of dimensions established by field measurement. 84
Sheet Size: Except for templates, patterns and similar full-size Drawings, submit Shop Drawings 86 on sheets at least 8 1/2" x 11" but no larger than 24" x 36". 87
One of the prints shall be maintained as a "Record Document". 90
Do not use Shop Drawings without an appropriate final stamp indicating action taken in 92 connection with construction. 93
PRODUCT DATA 95
Collect Product Data into a single submittal for each element of construction or system. Product Data 97 includes printed information such as manufacturer's installation instructions, catalog cuts, standard color 98
TIMBERLINE LODGE 09137 September, 2009
SUBMITTALS 01300 - 3
charts, roughing-in diagrams and templates, standard wiring diagrams and performance curves. Where 99 Product Data must be specially prepared because standard printed data is not suitable for use, submit as 100 "Shop Drawings". 101
Mark each copy to show applicable choices and options. Where printed Product Data includes 103 information on several products, some of which are not required, mark copies to indicate the 104 applicable information. Mark out inappropriate information. Include the following information: 105
Manufacturer's printed recommendations. 107 Compliance with recognized trade association standards. 108 Compliance with recognized testing agency standards. 109 Application of testing agency labels and seals. 110 Notation of dimensions verified by field measurement. 111 Notation of coordination requirements. 112
Do not submit Product Data until compliance with requirements of the Contract Documents has 114 been confirmed. 115
Submittals: Submit three (3) copies of each required submittal. Approval will be given by either a 117 marked-up submittal or a separate form. The Contracting Officer will retain one copy.. 118
SAMPLES 121
Samples include partial sections of manufactured or fabricated components, cuts or containers of 123 materials, color range sets and swatches showing color, texture and pattern. Include the following: 124
Generic description of the Sample. 125 Sample source. 126 Product name or name of manufacturer. 127 Compliance with recognized standards. 128 Availability and delivery time. 129
Submit Samples for review of kind, color, pattern and for texture for a final check of these 131 characteristics with other elements. 132
Where variation of characteristics are inherent in the material or product represented, 134 submit multiple units (not less than three [3]), that show approximate limits of the 135 variations. 136
Where Samples are for selection of color, pattern, texture or similar characteristics from a range 138 of standard choices, submit a full set of choices. 139
Maintain sets of Samples, as returned, at the Project site, for quality comparisons throughout the 141 course of construction. 142
C.O.’S ACTION 145
The C.O. will review each submittal, mark to indicate action taken and return promptly. 147
TIMBERLINE LODGE 09137 September, 2009
SUBMITTALS 01300 - 4
Compliance with specified characteristics is the Contractor's responsibility. 149
Action Stamp: The C.O. will stamp each submittal with a uniform, self-explanatory action stamp. The 151 stamp will be appropriately marked, as follows, to indicate the action taken: 152
Final Unrestricted Release: Where submittals are marked "No Exception Taken", that part of the 154 Work covered by the submittal may proceed, provided it complies with requirements of the 155 Contract Documents; final acceptance will depend upon that compliance. 156
Final-But-Restricted Release: When submittals are marked "Make Corrections Noted", that part 158 of the Work covered by the submittal may proceed, provided it complies with notations or 159 corrections on the submittal and requirements of the Contract Documents; final acceptance will 160 depend on that compliance. 161
Returned for Resubmittal: When submittal is marked "Revise and Resubmit", do not proceed 163 with that part of the Work covered by the submittal; including purchasing, fabrication, delivery or 164 other activity. Revise or prepare a new submittal in accordance with the notations; resubmit 165 without delay. Repeat if necessary to obtain a different action mark. 166
Do not permit submittals marked "Not Approved, Revise and Resubmit" to be used at the 168 Project site, or elsewhere where Work is in progress. 169
Other Action: Where a submittal is primarily for information or record purposes, special 171 processing or other activity, the submittal will be returned, marked "Action Not Required". 172
PART 2 - PRODUCTS (Not Applicable) 174 PART 3 - EXECUTION (Not Applicable) 177
END OF SECTION 179
TIMBERLINE LODGE 09137 October, 2009
QUALITY CONTROL 01400 - 1
SECTION 01400 - QUALITY CONTROL 1
PART 1 - GENERAL 4
RELATED DOCUMENTS 7
Drawings and general provisions of the Contract, including General and Supplementary Conditions 9 and other Division 1 Specification Sections, apply to this Section. 10
SUMMARY 13
This Section includes administrative and procedural requirements for quality-control services. 15 Quality-control services include inspections, tests, and related actions, including reports performed by 17 Contractor. 18 Inspection and testing services are required to verify compliance with requirements specified or 20 indicated. These services do not relieve Contractor of responsibility for compliance with Contract 21 Document requirements. 22 Requirements of this Section relate to customized fabrication and installation procedures, not 24 production of standard products. 25
Specific quality-control requirements for individual construction activities are specified in the 27 Sections that specify those activities. Requirements in those Sections may also cover 28 production of standard products. 29
Specified inspections, tests, and related actions do not limit Contractor's quality-control 31 procedures that facilitate compliance with Contract Document requirements. 32
Related Sections: The following Sections contain requirements that relate to this Section: 35
Division 1 Section "Cutting and Patching" specifies requirements for repair and restoration of 37 construction disturbed by inspection and testing activities. 38
RESPONSIBILITIES 40
Contractor Responsibilities: Unless otherwise indicated as the responsibility of another identified 42 entity, Contractor shall provide inspections, tests, and other quality-control services specified 43 elsewhere in the Contract Documents and required by C.O. Costs for these services are included in 44 the Contract Sum. 45
Where individual Sections specifically indicate that certain inspections, tests, and other 47 quality-control services are the Contractor's responsibility, the Contractor shall employ and 48 pay a qualified independent testing agency to perform quality-control services. Costs for 49 these services are included in the Contract Sum. 50
TIMBERLINE LODGE 09137 September, 2009
QUALITY CONTROL 01400 - 2
Retesting: The Contractor is responsible for retesting where results of inspections, tests, or other 52 quality-control services prove unsatisfactory and indicate noncompliance with Contract Document 53 requirements, regardless of whether the original test was Contractor's responsibility. 54
The cost of retesting construction, revised or replaced by the Contractor, is the Contractor's 56 responsibility where required tests performed on original construction indicated 57 noncompliance with Contract Document requirements. 58
Associated Services: Cooperate with agencies performing required inspections, tests, and similar 60 services, and provide reasonable auxiliary services as requested. Notify the agency sufficiently in 61 advance of operations to permit assignment of personnel. Auxiliary services required include, but are 62 not limited to, the following: 63
Provide access to the Work. 65
Furnish incidental labor and facilities necessary to facilitate inspections and tests. 67
Take adequate quantities of representative samples of materials that require testing or assist 69 the agency in taking samples. 70
Provide facilities for storage and curing of test samples. 72
Deliver samples to testing laboratories. 74
Provide the agency with a preliminary design mix proposed for use for materials mixes that 76 require control by the testing agency. 77
Provide security and protection of samples and test equipment at the Project Site. 79
Duties of the Testing Agency: The independent agency engaged to perform inspections, sampling, 81 and testing of materials and construction specified in individual Sections shall cooperate with the 82 Architect and the Contractor in performance of the agency's duties. The testing agency shall provide 83 qualified personnel to perform required inspections and tests. 84
The agency shall notify the C.O. and the Contractor promptly of irregularities or deficiencies 86 observed in the Work during performance of its services. 87
The agency is not authorized to release, revoke, alter, or enlarge requirements of the 89 Contract Documents or approve or accept any portion of the Work. 90
The agency shall not perform any duties of the Contractor. 92
Coordination: Coordinate the sequence of activities to accommodate required services with a 94 minimum of delay. Coordinate activities to avoid the necessity of removing and replacing 95 construction to accommodate inspections and tests. 96
The Contractor is responsible for scheduling times for inspections, tests, taking samples, and 98 similar activities. 99
TIMBERLINE LODGE 09137 October, 2009
QUALITY CONTROL 01400 - 3
SUBMITTALS 101
The independent testing agency shall submit a certified written report, in duplicate, of each 103 inspection, test, or similar service to the C.O. and the Contractor. 104
Report Data: Written reports of each inspection, test, or similar service include, but are not 106 limited to, the following: 107
Date of issue. 109 Project title and number. 110 Name, address, and telephone number of testing agency. 111 Dates and locations of samples and tests or inspections. 112 Names of individuals making the inspection or test. 113 Designation of the Work and test method. 114 Identification of product and Specification Section. 115 Complete inspection or test data. 116 Test results and an interpretation of test results. 117 Ambient conditions at the time of sample taking and testing. 118 Comments or professional opinion on whether inspected or tested Work complies 119 with Contract Document requirements. 120 Name and signature of laboratory inspector. 121 Recommendations on retesting. 122
QUALITY ASSURANCE 124
Qualifications for Service Agencies: Engage inspection and testing service agencies, including 126 independent testing laboratories, that are prequalified as complying with the American Council of 127 Independent Laboratories' "Recommended Requirements for Independent Laboratory Qualification" 128 and that specialize in the types of inspections and tests to be performed. 129 PART 2 - PRODUCTS (Not Applicable) 131
PART 3 - EXECUTION 133
REPAIR AND PROTECTION 135
General: Upon completion of inspection, testing, sample taking and similar services, repair damaged 137 construction and restore substrates and finishes. Comply with Contract Document requirements for 138 Division 1 Section "Cutting and Patching." 139 Protect construction exposed by or for quality-control service activities, and protect repaired 141 construction. 142 Repair and protection is Contractor's responsibility, regardless of the assignment of responsibility for 144 inspection, testing, or similar services. 145
END OF SECTION 146
TIMBERLINE LODGE 09137 October, 2009
TEMPORARY FACILITIES 01500 - 1
SECTION 01500 - TEMPORARY FACILITIES 1
PART 1 - GENERAL 4
RELATED DOCUMENTS 7
Drawings and general provisions of the Contract, including General and Supplementary Conditions 9 and other Division 1 Specification Sections, apply to this Section. 10
SUMMARY 13
This Section specifies requirements for temporary services and facilities; including utilities, 15 construction and support facilities, security and protection. Contractor to coordinate temporary 16 facilities with C.O. prior to start of work. 17
QUALITY ASSURANCE 20
Regulations: Comply with industry standards and applicable laws and regulations of authorities 22 having jurisdiction, including but not limited to: 23
Building Code requirements. 25 Health and safety regulations. 26 Utility company regulations. 27 Environmental protection regulations. 28
Standards: Comply with NFPA Code 241, "Building Construction and Demolition Operations", ANSI-30 A10 Series standards for "Safety Requirements for Construction and Demolition", and NECA 31 Electrical Design Library "Temporary Electrical Facilities". 32 Electrical Service: Comply with NEMA, NECA and UL standards and regulations for temporary 34 electrical service. Install service in compliance with National Electric Code (NFPA 70). 35
PROJECT CONDITIONS 38
Conditions of Use: Keep temporary services and facilities clean and neat in appearance. Operate in 40 a safe and efficient manner. Take necessary fire prevention measures. Do not overload facilities or 41 permit them to interfere with progress. Do not allow hazardous, dangerous or unsanitary conditions 42 or public nuisances to develop or persist on the site. 43
TIMBERLINE LODGE 09137 September, 2009
TEMPORARY FACILITIES 01500 - 2
PART 2 - PRODUCTS 47
MATERIALS 50
General: Provide materials suitable for the use intended. 52 Lumber and Plywood: Comply with requirements in Division 6 Section "Rough Carpentry". 54 Paint: Comply with requirements of Division 9 Section "Finish Painting". 56
EQUIPMENT 59
Water Hoses: Provide :" heavy-duty, abrasion-resistant, flexible rubber hoses of length required, with 61 pressure rating greater than the maximum pressure of the water distribution system; provide 62 adjustable shut-off nozzles at hose discharge. 63 Electrical Power Cords: Provide grounded extension cords; use "hard-service" cords where exposed 65 to abrasion and traffic. Provide waterproof connectors to connect separate lengths of electric cords, if 66 single lengths will not reach areas where construction activities are in progress. 67 Lamps and Light Fixtures: Provide general service incandescent lamps of wattage required for 69 adequate illumination. Provide guard cages or tempered glass enclosures, where exposed to 70 breakage. Provide exterior fixtures where exposed to moisture. 71 Heating Units: Provide temporary heating units that have been tested and labeled by UL, FM or 73 another recognized trade association related to the type of fuel being consumed. 74 First Aid Supplies: Comply with governing regulations. 76 Fire Extinguishers: Provide hand-carried, portable UL-rated, class "A" fire extinguisher for temporary 78 offices and similar spaces. 79
For offices and other locations, comply with NFPA 10 and 241 for classification, extinguishing 81 agent and size required by location and class of fire exposure. 82
PART 3 - EXECUTION 85
Temporary Enclosures: Provide temporary enclosure for protection of construction in progress and 88 completed, from exposure, foul weather, other construction operations and similar activities. 89 Collection and Disposal of Waste: Collect waste from construction areas and elsewhere daily. 90 Comply with requirements of NFPA 241 for removal of combustible waste material and debris. 91 Enforce requirements strictly. Dispose of material in a lawful manner. 92 Barricades, Warning Signs and Lights: Comply with standards and code requirements for barricades. 93
TIMBERLINE LODGE 09137 October, 2009
TEMPORARY FACILITIES 01500 - 3
Construction barricades, fences, railings and similar safety precautions in accordance with, 95 but not limited to, "Oregon Administrative Rules, Chapter 437". 96
a. Neatly assemble and firmly brace. 98
b. Maintain as required during construction period. 99
c. Remove barriers prior to final acceptance. 100
Environmental Protection: Provide protection, operate temporary facilities and conduct construction 102 that comply with environmental regulations. Avoid use of tools and equipment which produce harmful 103 noise. Restrict use of noise-making tools and equipment to hours that will minimize complaints from 104 persons in the building. 105
OPERATION, TERMINATION AND REMOVAL 107
Supervision: Enforce strict discipline in use of temporary facilities. Limit availability of temporary 109 facilities to essential and intended uses to minimize waste and abuse. 110 Maintenance: Maintain facilities in good operating condition until removal. Protect from damage by 112 freezing temperatures and similar elements. 113
Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation and 115 similar facilities on a 24-hour day basis where required to achieve indicated results and to 116 avoid possibility of damage. 117
Termination and Removal: Unless the C.O. requests it be maintained longer, remove each temporary 119 facility when the need has ended, or when replaced by authorized use of a permanent facility, or no 120 later than Substantial Completion. 121
Materials and facilities that constitute temporary facilities are property of the Contractor. 123
At Substantial Completion, clean and renovate permanent facilities that have been used 125 during the construction period, including but not limited to: 126
Replace air filters and clean inside of ductwork and housings. 128
END OF SECTION 130
TIMBERLINE LODGE 09137 October, 2009
MATERIALS - DELIVERY, STORAGE AND HANDLING 01600 - 1
SECTION 01600 - MATERIALS - DELIVERY, STORAGE AND HANDLING 1
PART 1 - GENERAL 4
RELATED DOCUMENTS 7
Drawings and general provisions of Contract, including General and Supplementary Conditions and 9 other Division 1 Specification Sections, apply to this Section. 10
QUALITY ASSURANCE 13
Source Limitations: To the fullest extent possible, provide products of the same kind, from a single 15 source. 16
PRODUCT DELIVERY, STORAGE AND HANDLING 19
Deliver, store and handle products in accordance with the manufacturer's recommendations, using 21 means and methods that will prevent damage, deterioration and loss, including theft. 22
Deliver products to the site in the manufacturer's original sealed container or other packaging 24 system, complete with labels and instructions for handling, storing, unpacking, protecting and 25 installing. 26
Inspect products upon delivery to ensure compliance with the Contract Documents and to 28 ensure products are undamaged and properly protected. 29
Store products subject to damage by the elements above ground, under cover in a 31 weathertight enclosure, with ventilation adequate to prevent condensation. Maintain 32 temperature and humidity within range required by manufacturer's instructions. 33
PART 2 - PRODUCTS 36
PRODUCT SELECTION 39
General Product Requirements: Provide products that comply with the Contract Documents, that are 41 undamaged and, unless otherwise indicated, unused at the time of installation. 42
Provide products complete with all accessories, trim, finish, safety guards and other devices 44 and details needed for a complete installation and for the intended use and effect. 45
Product Selection Procedures: Product selection is governed by the Contract Documents and 47 governing regulations. Procedures governing product selection. 48
TIMBERLINE LODGE 09137 September, 2009
MATERIALS - DELIVERY, STORAGE AND HANDLING 01600 - 2
For products specified only by reference standards, select any product meeting standards by 50 any manufacturer. 51 For products specified naming several products or manufacturers, select any product and/or 52 manufacturer named. 53
For products specified by naming one or more products but indicating the option of selecting 55 equivalent products by stating "or equal" after specified product, the Contractor must submit 56 request as required for the substitution for any product not specifically named. 57
For products specified by naming only one product and manufacturer, there is no option, and 59 no substitution will be allowed. 60
Compliance with Standards, Codes and Regulations: Where the Specifications only require 62 compliance with an imposed code, standard or regulation, select a product that complies with the 63 standards, codes or regulations specified. 64
PART 3 - EXECUTION 67
INSTALLATION OF PRODUCTS 70
Comply with manufacturer's instructions and recommendations for installation of products in the 72 applications indicated. Anchor each product securely in place, accurately located and aligned with 73 other Work. 74
Clean exposed surfaces and protect as necessary to ensure freedom from damage and 76 deterioration at time of Substantial Completion. 77
END OF SECTION 83
TIMBERLINE LODGE 09137 October, 2009
PRODUCT SUBSTITUTION 01631-1
SECTION 01631 - PRODUCT SUBSTITUTION 1
PART 1 - GENERAL 3
RELATED DOCUMENTS 5
Drawings and general provisions of Contract, including General and Supplementary Conditions and 7 other Division 1 Specification Sections, apply to this Section. 8
SUMMARY 10
Standards: Refer to Section "Definitions and Standards" for applicability of industry standards to 13 products specified. 14 Requirements governing the Contractor's selection of products and product options are included 16 under Section "Materials and Equipment". 17
SUBSTITUTIONS 21
Submit three (3) copies of each request for substitution for consideration. Identify the product or 23 the fabrication or installation method to be replaced in each request. Include related Specification 24 Section and Drawing numbers. Provide complete documentation showing compliance with the 25 requirements for substitutions, and the following information, as appropriate: 26
Product Data, including Drawings and descriptions of products, fabrication and installation 28 procedures. 29
Samples, where applicable or requested.