KRUZOF ISLAND OHV TRAIL RECONSTRUCTION

SUPPLEMENTARY SPECIFICATION

Preface Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

http://www.nist.gov/�

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005

109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

220 – Trail Reconstruction

Description

220.01 Work. Work consist of placing a lift of shotrock (depth as shown on plans) on the original trail.

Materials

220.02 Requirements. Use materials meeting requirements of the following sections of FP03:

Division 200 Earthwork Division 300 Aggregate Courses Section 602 Culverts and Drains

Construction

220.03 Drainage. Install culverts as shown on the plans in the areas to be specified by the C.O.

220.4 Reshaping and Finishing Trail and Backslopes. Provide a firm and uniformly finished trail in accordance with typical shown on the drawings.

Measurement

220.05 Method. Measure the quantities in accordance with Section 220 items listed in the bid schedule according to Subsection 109.02.

Payment

220.06 Basis. The accepted quantities will be paid at the contract price per unit of measurement for the Section 220 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in the Section See Subsection 109.05.

Pay Item Pay Unit

22001 Trail Reconstruction . . . . . . . . . . . . . . . . . . . . . LS

570 – Steel Trail Bridge

570.01 Work.

This work consist of a contractor design/build steel trail bridge, including foundation, bulkhead, rails, curbs, decking excavation, backfill, riprap, removal and disposal of old structure, and approach fills, material haul as shown on the drawings.

Materials

570.02 Requirements. Use materials meeting requirements of the following sections of FP-03:

Division 200 Earthwork Division 250 Slope Reinforcement And Retaining Walls Division 300 Aggregate Courses Division 550 Bridge Construction Division 600 Incidental Construction

Construction

570.03 General. Design and construct bridges as per the project design criteria and the bridge general notes as shown on the plans.

Measurement

570.4 Method. Measure the quantities in accordance with Section 570 items listed in the bid schedule according to Subsection 109.02.

Payment

220.06 Basis. The accepted quantities will be paid at the contract price per unit of measurement for the Section 570 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in the Section See Subsection 109.05.

Pay Item Pay Unit

57001 Install __’ Steel Bridge, Design/Construct . . . . . . . . . . . . . . . . . . . . . LS

640 – Waterbar Construction

640.01 Work.

This work consist of a contractor building waterbars at locations designated by the C.O. The construction shall include all excavation, backfill and compaction as shown on the drawings.

Materials

640.02 Requirements. Use materials meeting requirements of the following sections of FP-03:

Division 200 Earthwork Division 300 Aggregate Courses

Construction

640.03 General. Install waterbars of the types and at the locations shown on the drawings or as designated on the ground.

640.04 Excavation and Embankment. Perform excavation and embankment in accordance with Division 200 Earthwork and Division 300 Aggregate Courses.

Measurement

570.05 Method. Measure the quantities in accordance with Section 640 items listed in the bid schedule according to Subsection 109.02.

Payment

220.06 Basis. The accepted quantities will be paid at the contract price per unit of measurement for the Section 640 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in the Section See Subsection 109.05.

Pay Item Pay Unit

64001 Waterbar Construction . . . . . . . . . . . . . . . . . . . . . Each

718 - Traffic Signing and Marking Material 718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

kruzof_island_ohv_supplementary_specs.pdf
KRUZOF ISLAND OHV TRAIL RECONSTRUCTION
SUPPLEMENTARY SPECIFICATION
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources.
105.02(a) Government-provided sources.
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress
108 Delete.
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions.
155 - Schedules for Construction Contracts
155 Delete.
220 – Trail Reconstruction
Description
Construction
Measurement
Payment
570 – Steel Trail Bridge
Description
Construction
Measurement
Payment
640 – Waterbar Construction
Description
Construction
Measurement
Payment
718 - Traffic Signing and Marking Material
718.05 Aluminum Panels