AG-0489-S-10-0060_kruzof-trail_amend1.pdf

PDF 46 KB Posted

Attached to
RECOVERY Kruzof Island OHV Trail Reconstruction
Solicitation number
AG-0489-S-10-0060
Issued by

About this file

Amendment 1 (Revises Section B - Schedule of Items)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

One (1) 3 December 2009

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055

US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0489-S-10-0060

9B. DATED (SEE ITEM 11)

11/27/2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

copies to the issuing office.

Revisions have been made to the following section:

• Section B, Schedule of Items: Items 22101.1 through 22101.6 – Change from 1’minus to 1”minus in the item descriptions. (For pricing purposes please use the Schedule of Items Revised 12/3/09 form from this amendment.).

The closing date/time for receipt of bids remains at December 28, 2009 at 10:00 am

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

PS.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TONYA RYMER

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

12/3/2009 (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES

SCHEDULE OF ITEMS

(REVISED 12/3/2009)

B.1 SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

BASE BID ITEMS

15101

Mobilization

Each

22001.1

Trail Reconstruction (2200’ – 2’ thick X 8’ Wide Shotrock Layer On The Trail West Of Iris Creek Bridge, Includes 4 Turnouts and 4 Steel Culverts Installed - 12”Ø x 20’)

LS

22001.2 Trail Reconstruction (2000’ – 2’ thick

X 8’ Wide Shotrock Layer On Trail, North Shelikof Beach Trail, Includes 4 Turnouts)

57001.1 Install 80’ Steel Trail Bridge, Design/Construct MP 4.759 Road 7590, Includes Removal of Old Bridge, Approaches, Riprap, Etc.

57001.2 Install 20’ Steel Trail Bridge, Design/Construct MP 0.323 Road 7591, Includes Removal of Old Bridge, Approaches, Riprap, Etc.

64001

Waterbar Construction - As Staked Along Road 7590 MP 0.1 To MP 5.0 & Road 7591 MP 0.1 To MP 1.92

Each

65101.1 Pit Development (3000 CY Each Pit) Each 2

BASE BID TOTAL

Total

OPTION ITEMS

65101.2 Additional Pit Development (2000 CY

– Pit @ MP 5.12 Road 7590)

LS 1

65101.3 Additional Pit Development (2000 CY

– Pit @ MP 1.42 Road 7591)

22001.3 Trail Reconstruction (1000’ – 1’ thick

X 8’ Wide Layer of Shotrock Trail Starting @ MP 0.116 Road 7591)

22001.4 Trail Reconstruction (1300’ – 1’ x 8’

Wide Layer of Shotrock Trail Starting @ MP 2.0 Road 7591)

22001.5 Trail Reconstruction (1100’ – 1’ thick

X 11’ Wide Layer of Shotrock Trail Starting @ MP 4.0 Road 7590)

22001.6 Trail Reconstruction (500’ – 1’ thick X

11’ Wide Layer of Shotrock Trail Starting @ MP 3.5 Road 7590)

65101.4 1” Minus Crushed Gravel - Stockpile 600 CY (Store @ Pit @ MP 1.42 Road 7591, Gravel Is Additional From Used In Trail, Contractor Option

– Crush, Screen, Or Import)

65101.5 1” Minus Crushed Gravel - Stockpile 600 CY ( Store @ Pit @ MP 5.12 Road 7590, Gravel Is Additional From Used In Trail, Contractor Option

– Crush, Screen, Or Import)

22101.1 Construct a 6” thick X 8’ Wide Layer

of Compacted Gravel (1” Minus) Atop The New Reconstructed 8’ Wide Shotrock Trail (2200’ Trail West Of Iris Creek Bridge, Includes 4

22101.2 Construct a 6” thick X 8’ Wide Layer

of Compacted Gravel (1” Minus) Atop The New Reconstructed 8’ Wide Shotrock Trail (2000’ Trail, North Shelikof Beach Trail, Includes 4

22101.3 Construct a 6” thick X 8’ Wide x 1000’

Long Layer of Compacted Gravel (1” Minus) Atop The New Reconstructed Shotrock Trail, Starting @ MP 0.116 Road 7591)

22101.4 Construct a 6” thick X 8’ Wide x 1300’

Long Layer of Compacted Gravel (1” Minus) Atop The New Reconstructed Shotrock Trail, Starting @ MP 2.0 Road 7591)

22101.5 Construct a 6” thick X 11’ Wide x

1100’ Long Layer of Compacted Gravel (1” Minus) Atop The New Reconstructed Shotrock Trail, Starting @ MP 4.0 Road 7590)

22101.6 Construct a 6” thick X 11’ Wide x 500’

Long Layer of Compacted Gravel (1” Minus) Atop The New Reconstructed Shotrock Trail, Starting @ MP 3.5 Road 7590)

TOTAL ALL ITEMS

Total

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

Vendor Name: Phone

Signature: Fax Address: Email City, State, Zip: TIN# Duns#

SCHEDULE OF ITEMS