881_SPS_F06_EQUIP MOB MOVE_pbsc.doc
DOC document 52 KB Posted
- Attached to
- Road Maintenance IDIQ Federal contract opportunity
- Solicitation number
- AG-046W-S-09-0025A
About this file
Section J - 881 Mobilization-Equipment Moving
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO-Award-Notice.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1a.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1.pdf | ||
| 803_SPS_F06_SNOW REM.doc | DOC document | |
| 872_SPS_F06_SIGN MAINT.doc | DOC document | |
| 851_SPS_F06_HAZ OBSTRUCT REM.doc | DOC document | |
| 813_SPS_F06_SPOT SURF.doc | DOC document | |
| 832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc | DOC document | |
| AG-046W-S-09-0025A_road-maintenance-idiq.pdf | ||
| 811_SPS_F06_SURF MAINT.doc | DOC document | |
| 801_quantity_measurement_terms.doc | DOC document | |
| 807_SPS_F06_EQUIP RENT.doc | DOC document | |
| 833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc | DOC document | |
| 834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc | DOC document | |
| 861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc | DOC document | |
| 841_SPS_F06_VEGETATION TREAT.doc | DOC document | |
| 808_SPS_F06_TRAFFIC CONTROL.doc | DOC document | |
| 800_definition_abbreviation.doc | DOC document | |
| 842_SPS_F06_RDWY VEG MAINT.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
881 MOBILIZATION / EQUIPMENT MOVING
881.01 Service Required
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment outside the established work schedule as ordered.
881.02 Performance Standards
A. Make equipment available for inspection before it is used on National Forest System lands.
B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
C. Equipment will be clean and weed free before it arrives on National Forest System lands.
881.03 Location of Work:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
881.04 Measurement:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.
881.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 881 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit
881(1) Mobilization Lump Sum
881(2) Mobilization Each
881(3) Equipment Moving
Miles
881.06 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Weed free equipment |
| Equipment not weed free. |
| N/A |
| 0 |
| N/A |
| Equipment rejected until it can be made weed free |
| N/A |
| Ordered Movement of Equipment |
| Equipment not moved within designated time |
| N/A |
| 0 |
| N/A |
| Contractor issued Notice of Non Compliance |
| N/A |
| Equipment meets all state and federal regulations |
| Does not meet state and federal regulations |
| N/A |
| 0 |
| N/A |
| Bring equipment up to state and federal regulations or replace equipment |
| N/A |
| Equipment leaks |
| Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment |
| Small leaks inherent in the specific type equipment |
| 0 |
| 0 |
| Replace equipment and restore affected site as directed by the Contracting Officer |
| Place absorbent pads under equipment when not operating. |
* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
Intent and use: User to establish threshold for the acceptable level of quality.
881 – Equipment Mobilization/Moving (03/21/2007) 3