About this file
Section J - 813 Spot Surfacing
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO-Award-Notice.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1a.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1.pdf | ||
| 803_SPS_F06_SNOW REM.doc | DOC document | |
| 872_SPS_F06_SIGN MAINT.doc | DOC document | |
| 851_SPS_F06_HAZ OBSTRUCT REM.doc | DOC document | |
| 881_SPS_F06_EQUIP MOB MOVE_pbsc.doc | DOC document | |
| 832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc | DOC document | |
| AG-046W-S-09-0025A_road-maintenance-idiq.pdf | ||
| 811_SPS_F06_SURF MAINT.doc | DOC document | |
| 861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc | DOC document | |
| 841_SPS_F06_VEGETATION TREAT.doc | DOC document | |
| 808_SPS_F06_TRAFFIC CONTROL.doc | DOC document | |
| 800_definition_abbreviation.doc | DOC document | |
| 842_SPS_F06_RDWY VEG MAINT.doc | DOC document | |
| 801_quantity_measurement_terms.doc | DOC document | |
| 807_SPS_F06_EQUIP RENT.doc | DOC document | |
| 833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc | DOC document | |
| 834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
813 SPOT SURFACING
813.01 Service Required
Load, haul, and place surface material to repair or stabilize road surfaces.
813.02 Performance Standard
Spot surfacing is complete when the designated quantity of the ordered material has been placed.
813.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
813.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed.
B. Material measured by the ton shall be verified by certified weight tickets.
813.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 813 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit
813(1)
Spot Surfacing, Gradation _____ Cubic Yard
813(2)
Square Yard
813(3)
Ton 813.04 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Depth of Aggregate |
| Dimension of spot surfacing deviates by more than 1" from depth specified. Or less than 1" from dimension specified but is consistently high or low. |
| Dimension of spot surfacing deviates by 1" or less than from depth specified and not consistently high or low. |
| 0 |
| N/A |
| If depth is low, correct placement of aggregate to specified dimensions. If depth is high only pay for ordered amount |
| Accept aggregate as placed, pay only for delivered quantities. |
| Width of Aggregate |
| Dimension of spot surfacing is less than specified width or more than 1' wider than specified. |
| Dimension of spot surfacing is up to 1' wider than specified but not consistently wide. |
| 0 |
| N/A |
| If width is narrow, correct placement of aggregate to specified dimensions. If width is too wide reshape. |
| Accept aggregate as placed, pay only for delivered quantities. |
| Length |
| Dimension of spot surfacing is shorter than specified length or more than 100' longer than specified. |
| Dimension of spot surfacing is shorter than specified length or up to 100' longer than specified. |
| 0 |
| N/A |
| If length is shorter than specified, correct placement of aggregate to specified dimensions. If too long pay only for ordered amount. |
| Accept aggregate as placed, pay only for delivered quantities. |
| Compaction |
| Visible displacement occurs under heady spreading equipment |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Aggregate Quality |
| Does not meet specified gradation or durability requirements and is not suitable for intended use |
| Does not meet specified gradation or durability requirements and is suitable for intended use |
| 0 |
| N/A |
| Reject and replace |
| Accept but may reduce payment. |
| Finish Quality |
| Spot surfacing doesn’t conform to the adjacent road segments and traffic is impeded. |
| Spot surfacing generally conforms to the adjacent road segments, but traffic may be slowed. |
| 0 |
| 1 per site |
| Reshape or recompact surfacing as needed. |
| Accept but may reduce payment. |
* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
Intent and use: User to establish threshold for the acceptable level of quality.