Section J - 841 Vegetation Treatment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO-Award-Notice.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1a.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1.pdf | ||
| 803_SPS_F06_SNOW REM.doc | DOC document | |
| 872_SPS_F06_SIGN MAINT.doc | DOC document | |
| 851_SPS_F06_HAZ OBSTRUCT REM.doc | DOC document | |
| 813_SPS_F06_SPOT SURF.doc | DOC document | |
| 881_SPS_F06_EQUIP MOB MOVE_pbsc.doc | DOC document | |
| 832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc | DOC document | |
| AG-046W-S-09-0025A_road-maintenance-idiq.pdf | ||
| 811_SPS_F06_SURF MAINT.doc | DOC document | |
| 861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc | DOC document | |
| 808_SPS_F06_TRAFFIC CONTROL.doc | DOC document | |
| 800_definition_abbreviation.doc | DOC document | |
| 842_SPS_F06_RDWY VEG MAINT.doc | DOC document | |
| 801_quantity_measurement_terms.doc | DOC document | |
| 807_SPS_F06_EQUIP RENT.doc | DOC document | |
| 833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc | DOC document | |
| 834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
841 VEGETATION TREATMENT
841.01 Service Required
Apply vegetative treatments including seed, mulch, fertilizer or other products in designated areas.
841.02 Performance Standard
Treatment is complete when ordered quantities of vegetative treatment products have been applied to designated or Service Provider disturbed soil areas.
836.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
836.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
B. Acres: Work activity will be measured to the nearest one-tenth (0.1) acre.
841.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit 841(1) Establish Vegetation
Acres 841(2)
Mile
841(3)
Lump Sum
841.06 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Seed Mix |
| Seed mix is not as specified |
| N/A |
| 0 |
| N/A |
| Reject and replace |
| N/A |
| Mulch |
| Mulch is not as specified |
| N/A |
| 0 |
| N/A |
| Reject and replace |
| N/A |
| Fertilizer |
| Fertilizer is not as specified |
| N/A |
| 0 |
| N/A |
| Reject and replace |
| N/A |
| Weeds |
| Does not conform to Federal, State, and Local seed and noxious weed acts and laws. |
| N/A |
| 0 |
| N/A |
| Reject and replace |
| N/A |
| Application |
| Less than 80% of the designated area is treated |
| Between 80% and 100% of the designated area is treated |
| 0 |
| 1 per acre |
| Rework |
| Rework if greater than 1 minor defects * |
| Work Area Management |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| N/A |
| 0 |
| N/A |
| Suspend work until in compliance |
| N/A |
* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
Intent and use: User to establish threshold for the acceptable level of quality.