Section J - Roadway Vegetation Maintenance
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO-Award-Notice.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1a.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1.pdf | ||
| 803_SPS_F06_SNOW REM.doc | DOC document | |
| 872_SPS_F06_SIGN MAINT.doc | DOC document | |
| 801_quantity_measurement_terms.doc | DOC document | |
| 807_SPS_F06_EQUIP RENT.doc | DOC document | |
| 833_SPS_F06_DRAIN STRUCT INST-REPL_pbsc.doc | DOC document | |
| 834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc | DOC document | |
| 851_SPS_F06_HAZ OBSTRUCT REM.doc | DOC document | |
| 813_SPS_F06_SPOT SURF.doc | DOC document | |
| 881_SPS_F06_EQUIP MOB MOVE_pbsc.doc | DOC document | |
| 832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc | DOC document | |
| AG-046W-S-09-0025A_road-maintenance-idiq.pdf | ||
| 811_SPS_F06_SURF MAINT.doc | DOC document | |
| 861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc | DOC document | |
| 841_SPS_F06_VEGETATION TREAT.doc | DOC document | |
| 808_SPS_F06_TRAFFIC CONTROL.doc | DOC document | |
| 800_definition_abbreviation.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
842 ROADWAY VEGETATION MAINTENANCE
842.01 Service Required
Remove vegetation, including trees, on roadway surfaces and roadsides.
842.02
Performance Standard
Roadway vegetation maintenance is complete when the vegetation has been removed from the designated treatment area which interferes with traffic, obscures signs, impedes the flow of water or diverts water from drainage structures.
842.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
Maintenance Level 4 and 5 roads The treatment area will be SHOWN ON THE PLANS. If plans or supplemental specifications are not included, the treated area includes the road bed measured from center line to bottom of ditch / or defined road edge, plus an additional eight feet on each side. If there is no defined road edge, or a ditch does not exist, the treated area is 22 feet from both sides of center line of the road, double lane, 15 feet from both sides of the center line of the road, single lane. Provide a vertical clearance of 14 feet measured from the road surface elevation. Vegetation shall be removed to a maximum height of six inches above ground surfaces. Trees larger than six inches diameter breast height (dbh) are designated to remain.
Maintenance Level 3 roads
The treatment area will be SHOWN ON THE PLANS. If plans or supplemental specifications are not included, the treated area includes the road bed measured from center line to bottom of ditch, or defined road edge, plus an additional eight feet on each side. If there is no defined road edge, or a ditch does not exist, the treated area is 22 feet from both sides of center line of the road, double lane, 15 feet from both sides of the center line of the road, single lane. Provide a vertical clearance of 14 feet measured from the road surface elevation. Vegetation shall be removed to a maximum height of six inches above ground surfaces. Trees larger than six inches dbh are designated to remain.
Maintenance Level 2 roads
The treatment area will be SHOWN ON THE PLANS. If plans or supplemental specifications are not included, the treated area includes the road bed measured from center line to bottom of ditch, or defined road edge, plus an additional six feet on each side. If there is no defined road edge, or a ditch does not exist, the treated area is 15 feet from both sides of center line of the road. Provide a vertical clearance of 14 feet measured from the road surface elevation. Vegetation shall be removed to a maximum height of six inches above ground surfaces. Trees larger than six inches dbh are designated to remain.
842.04 Measurement Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
842.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 842 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Pay Unit
842(1) Vegetation Maintenance Level 4&5 roads Mile
842(2) Vegetation Maintenance Level 3 roads
842(3) Vegetation Maintenance Level 2 roads
842.06 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Tree damage |
| Damage to more than 30% of the tree bole |
| Damage to 30% or less of the tree bole |
| 0 per mile |
| 10 per mile |
| Remove or Treat |
| Remove or Treat |
| Horizontal Clearance |
| More than 20% not cleared to limits |
| 20% or less not cleared to limits |
| 0 |
| 5 per mile |
| Rework |
| Rework if greater than 5 minor defects * |
| Vertical Clearance |
| More than 20% not cleared to limits |
| 20% or less not cleared to limits |
| 0 |
| 5 per mile |
| Rework |
| Rework if greater than 5 minor defects * |
| Height above ground surface |
| More than 20% not cleared to limits |
| 20% or less not cleared to limits |
| 0 |
| 5 per mile |
| Rework |
| Rework if greater than 5 minor defects * |
| Drainage |
| Impeded flow or water diverted out of drainage structures. |
| 20% or less impeded, but water will stay in the channel. |
| 0 |
| 2 per mile |
| Rework |
| Rework if greater than 2 minor defects * |
| Oversized Material (Level 4&5) |
| Material greater than 3" diameter remaining on the road surface |
| Material 1” – 3” in diameter remaining on the road surface |
| 0 |
| 0 |
| Rework |
| Rework |
| Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages. |
| Material 1” - 3" in diameter and greater 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages. |
| 0 |
| 0 |
| Rework |
| Rework if greater than 0 minor defects * |
| Oversized Material (Level 3) |
| Material greater than 3" diameter and 12" in length remaining on the road surface |
| Material 1” - 3" in diameter and 36" in length remaining on the road surface |
| 0 |
| 0 |
| Rework |
| Rework if greater than 0 minor defects * |
| Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages. |
| Material 1” - 3" in diameter and greater 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages. |
| 0 |
| 2 per mile |
| Rework |
| Rework if greater than 2 minor defects * |
| Oversized Material (Level 2) |
| Concentrations of material greater than 6" diameter and 3 feet in length remaining on the road surface |
| Material less than 6" diameter and 3 feet in length remaining on the road surface |
| 0 |
| 2 per mile |
| Rework |
| Rework if greater than 2 minor defects * |
| Unstable concentrations of material less than 6" diameter and 3 feet in length remaining on the roadway slopes. |
| N/A |
| 0 |
| N/A |
| Rework |
| N/A |
| Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages. |
| Material 1” - 3" in diameter and greater 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages. . |
| 0 |
| 4 per mile |
| Rework |
| Rework if greater than 4 minor defects * |
| Concentrations (Level 3-5) |
| Any concentrations that affect sight distance |
| N/A |
| 0 |
| 0 |
| Rework |
| N/A |
| Work Area Management |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| 0 |
| 0 |
| Suspend work until in compliance |
| Suspend work until in compliance |
* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
Intent and use: User to establish threshold for the acceptable level of quality.