Section J - 833 Drainage Structure Installation or Replacement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO-Award-Notice.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1a.pdf | ||
| AG-046W-S-09-0025A_road-maintenance-amend1.pdf | ||
| 803_SPS_F06_SNOW REM.doc | DOC document | |
| 872_SPS_F06_SIGN MAINT.doc | DOC document | |
| 801_quantity_measurement_terms.doc | DOC document | |
| 807_SPS_F06_EQUIP RENT.doc | DOC document | |
| 834_SPS_F06_RDWY DRAIN SYS_MAINT_pbsc.doc | DOC document | |
| 851_SPS_F06_HAZ OBSTRUCT REM.doc | DOC document | |
| 813_SPS_F06_SPOT SURF.doc | DOC document | |
| 881_SPS_F06_EQUIP MOB MOVE_pbsc.doc | DOC document | |
| 832_SPS_F06_LOAD-HAUL-PLACE MAT_pbsc.doc | DOC document | |
| AG-046W-S-09-0025A_road-maintenance-idiq.pdf | ||
| 811_SPS_F06_SURF MAINT.doc | DOC document | |
| 861_SPS_F06_MAINT CTLGRDS-GATES-GRDRLS.doc | DOC document | |
| 841_SPS_F06_VEGETATION TREAT.doc | DOC document | |
| 808_SPS_F06_TRAFFIC CONTROL.doc | DOC document | |
| 800_definition_abbreviation.doc | DOC document | |
| 842_SPS_F06_RDWY VEG MAINT.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
833 DRAINAGE STRUCTURE INSTALLATION OR REPLACEMENT
833.01 Service Required
Install or remove drainage structures including culverts, water-bars, and cross ditches.
833.02 Performance Standard
Drainage structure installation or replacement is complete when designated culverts, water-bars, or cross ditches have been installed to the lines and grades specified, and removed culverts have been properly disposed.
833.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
833.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
B. Linear Foot: Work activities by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot. Culvert bands are incidental to the installation.
833.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 833 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item
Description
Pay Unit
833(1)
______ Inch corrugated metal pipe, ______ Inch thickness for steel or
______ Inch thickness for aluminum Linear Foot
833(2)
Culvert Removal
Each
833(3)
Water-bar Installation
833(4)
Water-bar Installation
Mile
833(5)
Water-bar Removal
833(6)
Cross Ditch Installation
833(7)
Cross Ditch Installation
Mile
833(8)
Cross Ditch Removal
833.06 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Culvert size |
| Culvert is smaller than the designated diameter shown on the drawings. |
| Culvert is larger than the designated diameter shown on the drawings. |
| 0 |
| N/A |
| Remove culvert and replace with designated size |
| Accept if culvert fits the geometry of the road but pay at designated size otherwise replace |
| Culvert is shorter than the designated length shown on the drawings. |
| Culvert is longer than the designated length shown on the drawings. |
| 0 |
| 0 |
| Replace or add section to fit geometry of road. |
| Remove excess culvert and treat cut end, or harden fill slope to prevent erosion and pay for ordered length |
| Grade and alignment of culvert |
| More than 10% deviation from original lines and grades. |
| 10% or less deviation from original lines and grades. |
| 0 |
| 1 per mile |
| Remove and replace culvert |
| Repair if greater than 1 minor defects * |
| Sag or depression in road after placement of culvert and backfill material |
| Greater than 2 inch depression in traveled way |
| 2 inch or less depression in traveled way |
| 0 |
| 1 per mile |
| Furnish, place and compact designated material to repair depression. |
| Repair if greater than 1 minor defects * |
| Removed culvert or pieces left on National Forest System Lands |
| Culverts or pieces of culvert left on National Forest System Lands |
| N/A |
| 0 |
| N/A |
| Remove from National Forest System Lands |
| N/A |
| Water-bars and cross ditches |
| More than 10% deviation from original lines and grades. |
| 10% or less deviation from original lines and grades. |
| 0 |
| 1 per mile |
| Rework |
| Rework if greater than 1 minor defects * |
| Sedimentation |
| Operations cause or allow sediment to leave site. |
| N/A |
| 0 |
| N/A |
| Cease operations until sediment is controlled |
| N/A |
| Work Area Management |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures |
| 0 |
| 0 |
| Suspend work until in compliance |
| Suspend work until in compliance |
* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.
Intent and use: User to establish threshold for the acceptable level of quality.